Particulars | Details |
---|---|
Title |
Providing Of 2nd Alternate Supply To 33/11k V Idpl Ss
|
Description |
Providing Of 2nd Alternate Source To 33/11 Kv Idpl Ss From 132/33 Kv Balkampet Eht Ss By Erection Of New 33 Kv Feeder By Laying Of 2.2 Km Of 33 Kv 3 X400 Sq.Mm. Xlpe Ug Cable (Double Run) And Stringing Of 2 Km Of 33 Kv 100 Sq.Mm. Aaac Oh Line Over Now Proposed 32 Nos. M9 Towers 23 Nos. 12.5mtr Spun Poles From The Eht Ss To 33/11 Kv Idpl Ss Duly Utilizing 2.3 Km Of Existing 33 Kv Idle Line Along With Erection Of 33 Kv Breaker At The 33/11 Kv Idpl Ss In Secunderabad Circle And The Work Will Be D By The Master Plan Sd V Of Division I In Masterplan Hyderabad Circle Under Td Improvement Works (Summer Action Plan 2025)
|
Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
Tender Id | 558037 |
Reference Number |
BID No. Chief Engineer/Master Plan /GH/TGSPDCL: 33 /24-25 |
Tender Fee | 5210 |
EMD | 3.47 Lakh |
Tender Value | |
Place | TS |
Link | http://eprocurement.telangana.gov.in/ |
Start Date | November 22, 2024 20:30 |
End Date |
07/12/2024 ( Expired 206 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Nuppl/gtps: supply, installation & commissioning of electrical items required to up smart class
Nuppl/gtps: supply, installation & commissioning of electrical items required to up smart class
Read moreSupply of hydraulic insulator testing jig for tensile load testing of 25kv porcelain and composite insulator as per rdso spec. no. ti/spc/ohe/instest/0090/(02/2009) rev o or latest.
For complete deion and other details, please refer to tender
Read moreDesign, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Read moreSupply, installation, testing, commissioning and training of electrical, plumbing and fire protection works for 19 underground stations from madhavaram milk colony station to royapettah govt hospital
Station including bored tunnel between stations (ch 76.000 to ch 17250.000) for corridor 3 of chennai metro rail project phase ii.
Read moreRehabilitation and upgradation of patur-balapur-shegaon section of nh-161g from design km 0-000 to km 33-200 and design km 36-600 to km 53-090 (total length-49.600 km) to 4lps configuration in the state of maharashtra on epc mode
Rehabilitation and upgradation of patur-balapur-shegaon section of nh-161g from design km 0-000 to km 33-200 and design km 36-600 to km 53-090 (total length-49.600 km) to 4lps configuration in the state of maharashtra on epc mode
Read moreFabrication and supply of conventional mlb and high density interconnect (hdi) printed circuit boards (pcbs) 18 to 32 layers
Fabrication and supply of conventional mlb
 and high density interconnect (hdi) printed circuit
 boards (pcbs) 18 to 32 layers
Read moreSupply of low sulphur heavy stock oil (lshs- premium grade having low pour point) confirming to is-11489 as per annexure-1
Supply of low sulphur heavy stock oil (lshs- premium grade having low
 pour point) confirming to is-11489 as per annexure-1.
Read moreConstruction of r.c.c protection wall to strengthen existing wall on south side of the 220 kv yard and construction of r.r masonry toe wall at south west side of 33 kv yard at 220/33 kv domalapenta ss in nagarkurnool district in mahabubnagar circle.
Construction of r.c.c protection wall to strengthen existing wall on south side of the 220 kv yard and construction of r.r masonry toe wall at south west side of 33 kv yard at 220/33 kv domalapenta ss in nagarkurnool district in mahabubnagar circle
Read moreConstruction of compound wall at north side(towards nagarkurnool i and ii bays side) to the extent of 400 kv ss land at 400/220 kv dindi ss in nagarkurnool district in mahabubnagar circle.
Construction of compound wall at north side(towards nagarkurnool i and ii bays side) to the extent of 400 kv ss land at 400/220 kv dindi ss in nagarkurnool district in mahabubnagar circle.
Read moreProviding and laying di pipeline from source no. iii to water treatment plant at sabari - 8000 mtr. sw - consultancy services for conducting eia study and obtaining of forest clearance.
Providing and laying di pipeline from source no. iii to water treatment plant at sabari - 8000 mtr. sw - consultancy services for conducting eia study and obtaining of forest clearance.
Read moreof your Industry type