Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Plan 2023 24 Water Quality
|
| Description |
Sustainability Support To Community Managed Water Supply Schemes 2023 24 Water Qulaity Mitigation Pressure Sand Filter Refilling In Padannotte Wss In Munderi Gp And Pressure Sand Filter Irp Of Dual Media Filter At Moilothara Wss In Maruthomkara
|
| Organisation | Kerala Rural Water Supply and Sanitation Agency | State Govt. and UT |
| Tender Id | 2026_KRWSA_850626_1 |
|
Reference Number |
KRWSA-KNR/27//2023-2024 |
| Tender Fee | 1395 |
| EMD | 13751 |
| Tender Value | - |
| Place | Munderi GP and Maruthomkara GP |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1437305 |
| Start Date | May 16, 2026 16:30 |
| End Date |
Expired
26/05/2026
Expired 124 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Hiring of 2 nos. of diesel operated wheel mounted loaders with backhoe bucket (0.26 cu.m) and loading bucket (1.1 cu.m) for 36 months one at each section of pkoc, manuguru for improvement of quality of coal - reg.
Hiring of 2 nos. of diesel operated wheel mounted loaders with backhoe bucket (0.26 cu.m) and loading bucket (1.1 cu.m) for 36 months one at each section of pkoc, manuguru for improvement of quality of coal - reg.
Read moreProviding 65 nos. private security guards and 1 no. private security supervisor on outsourcing at s and pc department, rg2 area for a period of 24 months under unit rate system.
Providing 65 nos. private security guards and 1 no. private security supervisor on outsourcing at s and pc department, rg2 area for a period of 24 months under unit rate system.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read morePlan schemes 2023-24 - water quality monitoring surveillance
Supply and installation of filter 500mm/900mm diameter and pressure filters for removal of iron and turbidity of small water supply schemes in various grama panchayat in kasargode , kannur , kozhikkode and wayanad districts
Read morePlan 2024-25 - water quality
Water quality mitigation to 2024-25 pressure sand filter of dual media&#x0d filter thushara kavugullakunn wss in puthuppadi&#x0d gramapanchayth kozhikode district&#x0d
Read moreVarious electric work against additional business plan 2023-24 for quality
Various electric work against additional business plan 2023-24 for quality power supply in aligarh city on semi turn-key basis under the area eudd-2, aligarh
Read moreVarious electric work against additional business plan 2023-24 for quality
Various electric work against additional business plan 2023-24 for quality power supply in aligarh city on semi turnkey basis in the area of eudd-2, aligarh
Read morePlan 2025-26 - water quality panamaram gp
Water quality mitigation project 2025-26 panamaram wss panamaram gpwayanad dist
Read moreWater quality 23-24
Supply and installation of filter 500mm/900mm diameter and pressure filters for removal of iron and turbidity of small water supply schemes in various grama panchayat in kasargode , kannur , kozhikkode and wayanad districts&#x0d &#x0d
Read moreElectric work against additional business plan 2023-24 for quality power supply in aligarh
Electric work against additional business plan 2023-24 for quality power supply in aligarh
Read moreof your Industry type