Tender Details
Particulars | Details |
---|---|
Title |
Gp/Mhasadi P.Ner/2024 25
|
Description |
1) Dustbin Metallic 180 Liter Combo Wet And Dry. 2) Dustbin Metallic 180 Liter Combo Wet And Dry. 3)&Amp#X0d
Combination For Kid For Anganwadi And Preprimary Students. 4) Combination For Kid For Anganwadi&Amp#X0d
And Preprimary Students.
|
Organisation | RDD-CEO-DHULE | State Govt. and UT |
Tender Id | 2024_DHULE_1122475_1 |
Reference Number |
GP/Mhasadi P.Ner/2024-25 |
Tender Fee | 1090 |
EMD | 0 |
Tender Value | |
Place | MhasadiP.Ner |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1963281 |
Start Date | December 16, 2024 22:30 |
End Date |
25/12/2024 ( Expired 136 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Proposed construction of 1 breeder layer pen house 4500 sq ft 2 breeder growing pen house1900 sq ft 3 commercial growing pen house 1500 sq ft x 4 4 hatchery building 3000 sq ft 5 feed mill 1500 sq ft and 6 compost pit for mortality disposal
Proposed construction of 1 breeder layer pen house 4500 sq ft 2 breeder growing pen house1900 sq ft 3 commercial growing pen house 1500 sq ft x 4 4 hatchery building 3000 sq ft 5 feed mill 1500 sq ft and 6 compost pit for mortality disposal
Read moreLoading and transportation of fine slime lump ore for a quantity of 20 lt in dry wet condition by mechanical means at fine ore dump mv siding, kirandul within a lead of 1 km and in all lifts including unloading at loading yard
Loading and transportation of fine slime lump ore for 
 a quantity of 20 lt in dry wet condition by 
 mechanical means at fine ore dump mv siding, kirandul 
 within a lead of 1 km and in all lifts including unloading 
 at loading yard
Read moreDay to day maintenance of electrical works for filtration plants 1, 2, 3 and 4 at sitlee. (stage works).
Day to day maintenance of electrical works for filtration plants 1, 2, 3 and 4 at sitlee. (stage works).
Read moreAnnual rate of contract for replacement of sewer line and manhole, treated water disposal line, providing and raising of manhole cover in alampur, milakpur, khijuriwas, nangalia, bhiwari gaon, rhb sec. 1, 2, 3, 4, 7, uit sector 5, gh 6 and near exis
Annual rate of contract for replacement of sewer line and manhole, treated water disposal line, providing and raising of manhole cover in alampur, milakpur, khijuriwas, nangalia, bhiwari gaon, rhb sec. 1, 2, 3, 4, 7, uit sector 5, gh 6 and near exis
Read moreTender for internal improvement works of cluster section no. s-376 (package-3) for water supply schemes 1. kawan wali 2. chak rohella 3. mahatam nagar 4. hasta kalan 5. nawan hasta 6. jhanger bhaini (rette wali bhaini) block and distt. fazilka
Providing, stringing out pvc pipes , household connections, water meter, disinfection unit, painting / installation of sign board etc. complete in all respect and all other works contgent there to. (under state share / jjm)
Read moreDhule/ dmc/wd/ dmc fund/20/1-2/2025-26 construction of cement concrete road within lanes of bhushan thakare sonar baba near holkar and lokare nagar open space 3 lanes at dhule
Construction of cement concrete road within lanes of&#x0d bhushan thakare sonar baba near holkar and lokare nagar open&#x0d space 3 lanes at dhule
Read moreInviting rates of construction material with complete work given below for yearly (2025-26) providing and fixing of tiles/ stone with cement concrete. 1-kota stone, 2- marble stone, 3- granite stone, 4- flag stone, 5- acupressure tiles.
Inviting rates of construction material with complete work given below for yearly (2025-26) providing and fixing of tiles/ stone with cement concrete. 1-kota stone, 2- marble stone, 3- granite stone, 4- flag stone, 5- acupressure tiles.
Read moreFor special strengthening work of 1. alejhari kaspur road length- 1.50 km 2. garra-ekodi road length - 2.00 km 3. kalagota- pipariya road length-2.20 km 4. wara-alejhari road length- 5.00 km total length - 11.70 km.
For special strengthening work of&#x0d 1. alejhari kaspur road length- 1.50 km&#x0d 2. garra-ekodi road length - 2.00 km&#x0d 3. kalagota- pipariya road length-2.20 km&#x0d 4. wara-alejhari road length- 5.00 km total length - 11.70 km.
Read moreWater supply, sewerage disposal and sanitary installation of staff quarter flat type (2 block of 4 quarter x 2 storied) for ph division, angul under state plan (basudha) angul
Water supply, sewerage disposal and sanitary&#x0d installation of staff quarter flat type (2 block of 4&#x0d quarter x 2 storied) for ph division, angul under&#x0d state plan (basudha) angul
Read moreRepair and routine maintenance of roads under performance based maintenance stage contract 2025-26 of randb sub division bandipora and sub division aloosa. 1. block bandipora 2. block arin 3. block aloosa 4. block bankoot.
Repair and routine maintenance of roads under performance based maintenance stage contract 2025-26 of randb sub division bandipora and sub division aloosa.&#x0d 1. block bandipora&#x0d 2. block arin &#x0d 3. block aloosa &#x0d 4. block bankoot.&#x0d
Read moreof your Industry type