Tender Details
Particulars | Details |
---|---|
Title |
Work Contract For Shifting Of Scrap From Various Maintenance Sites Of Atps Chachai To The Designated Store Scrap Yard And Stacking Work Including Loading And Unloading With The Help Of Contractors Own Tractor Trolley And Manpower As And When
|
Description |
Work Contract For Shifting Of Scrap From Various Maintenance Sites Of Atps Chachai To The Designated Store Scrap Yard And Stacking Work Including Loading And Unloading With The Help Of Contractors Own Tractor Trolley And Manpower As And When
|
Organisation | Madhya Pradesh Power Generating Company Limited | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 795 |
EMD | 6300 |
Tender Value | |
Place | ATPS Chachai |
Link |
AAAAAAAAAA Login to view |
Start Date | May 28, 2025 17:30 |
End Date |
16/06/2025 ( 15 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Work contract for shifting of scrap from various maintenance sites of atps chachai to the designated store scrap yard and stacking work including loading and unloading with the help of contractors own tractor trolley and manpower as and when
Work contract for shifting of scrap from various maintenance sites of atps chachai to the designated store scrap yard and stacking work including loading and unloading with the help of contractors own tractor trolley and manpower as and when
Read moreBiennial work contract for round the clock routine / prive / breakdown / emergency minor mechanical maintenance of various auxiliaries and equipments of chp 210 mw atps chachai.
Biennial work contract for round the clock routine / prive / breakdown / emergency minor mechanical maintenance of various auxiliaries and equipments of chp 210 mw atps chachai.
Read morePetty contract for collection and shifting of different types of cables materials scraps from various locations of rtps site to cable yard scrap yard store on mt basis
Petty contract for collection and shifting of different types of cables materials scraps from various locations of rtps site to cable yard scrap yard store on mt basis
Read moreCutting, loading, unloading and stacking of scrap at r/store of jhingurda project
Cutting, loading, unloading and stacking of scrap at r/store of jhingurda project
Read moreUnloading of various secondary/defective steel items from
Name of work : unloading of various secondary/defective steel items from wagons at disposal yard and shifting /stacking of the same to lot sites within 1.0 km radius in the yard as directed by representatives of disposal stores. back loading of secondary steel items onto external wagons as and when required.
Read moreCarriage stacking handling shifting loading unloading ing and weighting of store items for the current financial year 2025 2026 under jjm nabard district capex m and r ut capex etc
Carriage stacking handling shifting loading unloading ing and weighting of store items for the current financial year 2025 2026 under jjm nabard district capex m and r ut capex etc
Read moreWork contract for pre and post monitoring e.g. air, water, soil, and flora and fauna etc at around abandoned mine various samples monitoring during disposal of fly/ pond ash in low lying area/ mines at atps, chachai
Work contract for pre and post monitoring e.g. air, water, soil, and flora and fauna etc at around abandoned mine various samples monitoring during disposal of fly/ pond ash in low lying area/ mines at atps, chachai
Read moreKtps-v-cam-transportation of material, t and p, ms erw pipes, various scrap material, ash, coal, silt and debris etc by engaging tractor (including carrier) from section store to ash pond / internal transportation from one spot to another spot at ash pond and inside plant premises as and when required as per the directions of in charge engineer at site, during the period from 01-04-2025 (or from actual date of utilization) to 31 -03 - 2026-reg.
Ktps-v-cam-transportation of material, t and p, ms erw pipes, various scrap material, ash, coal, silt and debris etc by engaging tractor (including carrier) from section store to ash pond / internal transportation from one spot to another spot at ash pond and inside plant premises as and when required as per the directions of in charge engineer at site, during the period from 01-04-2025 (or from actual date of utilization) to 31 -03 - 2026-reg.
Read moreAnnual work contract for daily cleaning of siloarea and lowerstructure of silosphi phii phiii along with work of loading transportation andunloading flyash by tractor trolley from road between zero mile to nthand colonyto zeromile anddump into asdyke
Annual work contract for daily cleaning of siloarea and lowerstructure of silosphi phii phiii along with work of loading transportation andunloading flyash by tractor trolley from road between zero mile to nthand colonyto zeromile anddump into asdyke
Read moreWork of routine loading and unloading of material from transporters godown/railway station,running of diesel pump,checking shifting restacking of left material from construction other stores at ghtp store.
Work of routine loading and unloading of material from transporters godown/railway station,running of diesel pump,checking shifting restacking of left material from construction other stores at ghtp store.
Read moreof your Industry type