| Particulars | Details |
|---|---|
| Title |
Loading, Transportation, Unloading And Stacking Of Scrap From Various
|
| Description |
Loading, Transportation, Unloading And Stacking Of Scrap From Various Location Of Plant To New Scrap Yard.
|
| Organisation | NTPC Limited | Public Sector Undertakings |
| Tender Id | 2025_NTPC_94680_1 |
|
Reference Number |
NTPC/Korba STPS/9900297785 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | Korba Super Thermal Power Proj P.O. VIKASH BHAWAN |
| Link |
View Original Tender Notice
https://eprocurentpc.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=97898 |
| Start Date | February 13, 2025 16:35 |
| End Date |
Expired
20/02/2025
Expired 581 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreOperation and maintenance of (33/11kv and 11kv )substations with distribution transformer (at various pumping stations) under narsapur segment, medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Operation and maintenance of (33/11kv and 11kv )substations with distribution transformer (at various pumping stations) under narsapur segment, medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Read moreOperation and maintenance of (33/11kv and 11kv ) substations with distribution transformer (at various pumping stations) under medak segment (08), medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Operation and maintenance of (33/11kv and 11kv ) substations with distribution transformer (at various pumping stations) under medak segment (08), medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Read moreStmc for maintenance of stretch from km 289.500 to km 299.000 on kota darah section of nh-52 in the state of rajasthan.
Stmc for maintenance of stretch from km 289.500 to km 299.000 on kota darah section of nh-52 in the state of rajasthan.
Read moreConsultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Read moreSupply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.
Read moreConstruction of ttro plant for re-use of treate sewage from 11 mld brah stp for ntpc brah, bihar including 15 years o&m.
Construction of ttro plant for re-use of treate sewage from 11 mld brah stp for ntpc brah, bihar including 15 years o&m.
Read moreConsultancy services for dpr preparation for oti of nh-43, nh-543 and nh-45 (total length 25.15 km) in the state of madhya pradesh
Consultancy services for dpr preparation for oti of nh-43, nh-543 and nh-45 (total length 25.15 km) in the state of madhya pradesh
Read moreOutsourcing tender for d group and non clinical staff at the government hospital, hungund taluka, bagalkot district
Outsourcing tender for d group and non clinical staff at the government hospital, hungund taluka, bagalkot district
Read moreProcurement of medical equipments for hospitals in shimoga
Procurement of medical equipments for hospitals in shimoga
Read moreof your Industry type