Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
As Per Work No. 1 Construction Work Of Temporary Dam In Johar Near The Drain In Ward No. 10 Meena Padi And Stone Pitching Work In The Dam.
|
| Description |
As Per Work No. 1 Construction Work Of Temporary Dam In Johar Near The Drain In Ward No. 10 Meena Padi And Stone Pitching Work In The Dam.
|
| Organisation | DLB | State Govt. and UT |
| Tender Id | 2024_DLB_420767_1 |
|
Reference Number |
NIT-25/2024-25 WORK NO. 01 |
| Tender Fee | 4000 |
| EMD | 2.47 Lakh |
| Tender Value | - |
| Place | municipal corporation alwar |
| Link |
View Original Tender Notice
https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=755970 |
| Start Date | September 20, 2024 15:30 |
| End Date |
Expired
01/10/2024
Expired 747 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Providing stone pitching at panjamthangi vaari near highschool (down stream side) in inampudhuvadi panchayat in vaiyampatty block in tiruchirappalli district
Providing stone pitching at panjamthangi vaari near highschool (down stream side) in inampudhuvadi panchayat in vaiyampatty block in tiruchirappalli district
Read moreConstruction of stone pitching work in between rd 36.86okm to rd 37.480km of lift main canal under lift main canal division , kusumkhunti.
Construction of stone pitching work in between rd 36.86okm to rd 37.480km of lift main canal under lift main canal division , kusumkhunti.
Read moreExecution of stone crate and pitching work to prevent soil erosion along the roadside, caused by flood-induced waterlogging in the existing unlined drain situated beside the arail bandha in naini.
Execution of stone crate and pitching work to prevent soil erosion along the roadside, caused by flood-induced waterlogging in the existing unlined drain situated beside the arail bandha in naini.
Read moreConstruction of cc road for diversion of khaperkheda to parseoni sh no. 346 (ch. 9/560 to ch. 11/100) and stone pitching on embankment along with toe wall at singhori deep ocm under bssa(incl. maintenance of 05 years without any cost implications)
Construction of cc road for diversion of khaperkheda to parseoni sh no. 346 (ch. 9/560 to ch. 11/100) and stone pitching on embankment along with toe wall at singhori deep ocm under bssa(incl. maintenance of 05 years without any cost implications)
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreWard number 10, construction work of kaccha vandh in johar near the drain in meena padi and stone pitching work in vandh.
Ward number 10, construction work of kaccha vandh in johar near the drain in meena padi and stone pitching work in vandh.
Read moreRepair of stone pitching left side of rhr downstream of nangal dam.
Repair of stone pitching left side of rhr downstream of nangal dam.
Read moreRepair of stone pitching left side of rhr downstream at nangal dam.
Repair of stone pitching left side of rhr downstream at nangal dam.
Read moreDeweeding of the side slope stone pitching and adjoin area of kaushlya dam panchkula
Deweeding of the side slope stone pitching and adjoin area of kaushlya dam panchkula
Read moreof your Industry type