Tender Details
Particulars | Details |
---|---|
Title |
Supply, Installation, Testing And Commissioning Of The Following Costly Medical Equipment For Esi Hospitals
|
Description |
Supply Of Three (3) Usg Machine With Colour Doppler
|
Organisation | LABOUR DEPARTMENT | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 2.5 Lakh |
Tender Value | |
Place | West Bengal |
Link |
AAAAAAAAAA Login to view |
Start Date | April 09, 2025 20:30 |
End Date |
02/05/2025 ( 3 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply, installation, testing, commissioning and training of electrical, plumbing and fire protection works for 19 underground stations from madhavaram milk colony station to royapettah govt hospital
Station including bored tunnel between stations (ch 76.000 to ch 17250.000) for corridor 3 of chennai metro rail project phase ii.
Read moreSupply,installation, testing, commissioning and training of electrical, fire alarm and detection, fire fighting, vac and bms works for nine elevated stations
Sholinganallur lake to sipcot 2 station including stabling lines, viaduct between the stations (ch 35044.000 to 44671.000) for corridor- 3 of chennai metro rail project phase-ii.
Read moreDesign manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Read moreDesign, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Read moreSupply, installation, testing, commissioning of motorised mobile racking system for the project augmentation of store house facility for iac at wed(v)
Supply, installation, testing, commissioning of motorised mobile racking system for the project augmentation of store house facility for iac at wed(v)
Read moreSupply installation commissioning of surgical drill at aiims bhubaneswar
Supply installation commissioning of surgical drill at aiims bhubaneswar
Read moreSupply installation commissioning of cavitron ultrasonic surgical aspirator cusa for the dept of surgical gastroenterology liver transplantation and dept of pediatric surgery at aiims bhubaneswar
Supply installation commissioning of cavitron ultrasonic surgical aspirator cusa for the dept of surgical gastroenterology liver transplantation and dept of pediatric surgery at aiims bhubaneswar
Read moreRate contract for supply of imported spares of caterpillar engines in eastern and northern regions of ongc work centre for a period of five 05 years
Rate contract for supply of imported spares of caterpillar engines in eastern and northern regions of ongc work centre for a period of five 05 years
Read moreDesign, support, supply, installation and commissioning, training, warranty and amc of medical cyclotron with turnkey
Design, support, supply, installation and commissioning, training, warranty and amc of medical cyclotron with turnkey (complete scope as per the attached document in specification)
Read moreRate contract for supply of imported spares of caterpillar engines in southern central and western regions of ongc work centre for a period of 05 years
Rate contract for supply of imported spares of caterpillar engines in southern central and western rate contract for supply of imported spares of caterpillar engines in southern central and western regions of ongc work centre for a period of 05 year
Read moreof your Industry type