Tender Details

About Tender

🏭 Invitation For Bids: Temporary Distribution System For Mahakumbh Mela 🏞️ U P Jal Nigam (Hq), The State Government Entity, Is Seeking Bids From Experienced Contractors For The Laying Of A Temporary Distribution System And Its Appurtenant Work In Sectors 13, 14, 15, And 16 Of The Prayagraj Mahakumbh Mela. 📅 Bid Submission Deadline: July 11, 2024, 5:00 Pm Tender Fee: Inr 11,800 Emd: Inr 782,000 Proposals Should Encompass Detailed Plans For The Installation Of The Temporary Distribution System, Including All Necessary Appurtenant Works, In Compliance With The Project Specifications And Timelines. Keywords: Temporary Distribution System, Mahakumbh Mela, U P Jal Nigam, Prayagraj, State Government, Electrical Contractors, Bid, Tender
Particulars Details
Title
Laying Of Temporary Distribution System And Its Appurtenant Work Package 5 In Sector 13 14 15 And 16 Of Mahakumbh Mela
Description
Laying Of Temporary Distribution System And Its Appurtenant Work Package 5 In Sector 13 14 15 And 16 Of Mahakumbh Mela
Organisation U P Jal Nigam (HQ), Lucknow | State Govt. and UT
Tender Id 2024_UPJNM_929982_1
Reference
Number
446/Mahakumbh 2025/357 Date 07-06-2024
Tender Fee 11800
EMD 7.82 Lakh
Tender Value
Place Prayagraj Mahakumbh mela Area
Link https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1606078
Start Date June 17, 2024 15:30
End Date

11/07/2024 ( Expired 336 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Protection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode

Protection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode

Read more
Contractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta

Contractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta

Read more
Laying of pipe line from water supply and exection of other work in different location at site ward no. 38 a.b. road 58 no. pulia etc place file no. 195/25x9/1

Laying of pipe line from water supply and exection of other work in different location at site ward no. 38 a.b. road 58 no. pulia etc place file no. 195/25x9/1

Read more
Rectification work of cement concrete pavement of deoli kota section of in the state of rajasthan package-2 on risk and cost of contractor

Rectification work of cement concrete pavement of deoli kota section of in the state of rajasthan package-2 on risk and cost of contractor

Read more
Improvement and bituminous work on tugdunda-bhaiswara motor road (km 0.000 to 5.000) in pauri constituency of pauri gharwal district under state sector

Improvement and bituminous work on tugdunda-bhaiswara motor road (km 0.000 to 5.000) in pauri constituency of pauri gharwal district under state sector

Read more
Construction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.

Construction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.

Read more
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode

Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode

Read more
Structural rehabilitation work and improvement of reservoir, dam, outlet and basic facilities of myntdu leshka stage-i dam in west jaintia hills district of meghalaya under drip-ii (package-viii)

Structural rehabilitation work and improvement of reservoir, dam, outlet and &amp#x0d basic facilities of myntdu leshka stage-i dam in west jaintia hills district of &amp#x0d meghalaya under drip-ii (package-viii)

Read more
The work of strengthening and improvement of water supply distribution network in the jurisdiction of jaipur nagar nigam greater under amrut 2.0 district- jaipur.

The work of strengthening and improvement of water supply distribution network in the jurisdiction of jaipur nagar nigam greater under amrut 2.0 district- jaipur.

Read more
Under the fourth phase of mukhyamantri urban infrastructure, construction of covered drain from bus stand to krishak sammelan bhawan in ward number 13 and 14.

Under the fourth phase of mukhyamantri urban infrastructure, construction of covered drain from bus stand to krishak sammelan bhawan in ward number 13 and 14.

Read more
Click Here to Download Dockets