Tender Details
About Tender
🏭 Invitation For Bids: Temporary Distribution System For Mahakumbh Mela 🏞️ U P Jal Nigam (Hq), The State Government Entity, Is Seeking Bids From Experienced Contractors For The Laying Of A Temporary Distribution System And Its Appurtenant Work In Sectors 13, 14, 15, And 16 Of The Prayagraj Mahakumbh Mela. 📅 Bid Submission Deadline: July 11, 2024, 5:00 Pm Tender Fee: Inr 11,800 Emd: Inr 782,000 Proposals Should Encompass Detailed Plans For The Installation Of The Temporary Distribution System, Including All Necessary Appurtenant Works, In Compliance With The Project Specifications And Timelines. Keywords: Temporary Distribution System, Mahakumbh Mela, U P Jal Nigam, Prayagraj, State Government, Electrical Contractors, Bid, TenderParticulars | Details |
---|---|
Title |
Laying Of Temporary Distribution System And Its Appurtenant Work Package 5 In Sector 13 14 15 And 16 Of Mahakumbh Mela
|
Description |
Laying Of Temporary Distribution System And Its Appurtenant Work Package 5 In Sector 13 14 15 And 16 Of Mahakumbh Mela
|
Organisation | U P Jal Nigam (HQ), Lucknow | State Govt. and UT |
Tender Id | 2024_UPJNM_929982_1 |
Reference Number |
446/Mahakumbh 2025/357 Date 07-06-2024 |
Tender Fee | 11800 |
EMD | 7.82 Lakh |
Tender Value | |
Place | Prayagraj Mahakumbh mela Area |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1606078 |
Start Date | June 17, 2024 15:30 |
End Date |
11/07/2024 ( Expired 336 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Protection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode
Protection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode
Read moreContractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Contractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Read moreLaying of pipe line from water supply and exection of other work in different location at site ward no. 38 a.b. road 58 no. pulia etc place file no. 195/25x9/1
Laying of pipe line from water supply and exection of other work in different location at site ward no. 38 a.b. road 58 no. pulia etc place file no. 195/25x9/1
Read moreRectification work of cement concrete pavement of deoli kota section of in the state of rajasthan package-2 on risk and cost of contractor
Rectification work of cement concrete pavement of deoli kota section of in the state of rajasthan package-2 on risk and cost of contractor
Read moreImprovement and bituminous work on tugdunda-bhaiswara motor road (km 0.000 to 5.000) in pauri constituency of pauri gharwal district under state sector
Improvement and bituminous work on tugdunda-bhaiswara motor road (km 0.000 to 5.000) in pauri constituency of pauri gharwal district under state sector
Read moreConstruction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Construction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Read moreBalance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Read moreStructural rehabilitation work and improvement of reservoir, dam, outlet and basic facilities of myntdu leshka stage-i dam in west jaintia hills district of meghalaya under drip-ii (package-viii)
Structural rehabilitation work and improvement of reservoir, dam, outlet and &#x0d basic facilities of myntdu leshka stage-i dam in west jaintia hills district of &#x0d meghalaya under drip-ii (package-viii)
Read moreThe work of strengthening and improvement of water supply distribution network in the jurisdiction of jaipur nagar nigam greater under amrut 2.0 district- jaipur.
The work of strengthening and improvement of water supply distribution network in the jurisdiction of jaipur nagar nigam greater under amrut 2.0 district- jaipur.
Read moreUnder the fourth phase of mukhyamantri urban infrastructure, construction of covered drain from bus stand to krishak sammelan bhawan in ward number 13 and 14.
Under the fourth phase of mukhyamantri urban infrastructure, construction of covered drain from bus stand to krishak sammelan bhawan in ward number 13 and 14.
Read moreof your Industry type