Tender Details

Particulars Details
Title
Fabrication/Erection And Repairing / Replacement Of R.O.M. B/C, Picking B/C, Transfer B/C, Reversible B/C Top Carrier Roller Frame At P.C.H. Section At Sawang Washery.
Description
Fabrication/Erection And Repairing / Replacement Of R.O.M. B/C, Picking B/C, Transfer B/C, Reversible B/C Top Carrier Roller Frame At P.C.H. Section At Sawang Washery.
Organisation Coal India Limited (CIL)
Tender Id 2023_CCL_288945_1
Reference
Number
SGW/KTA/ENM/E-Tender/23-24/55 Date 16.09.2023
Tender Fee
EMD 2900
Tender Value
Place Office of the Project Officer, Sawang Washery.
Link
View Original Tender Notice

https://coalindiatenders.nic.in

Start Date September 18, 2023 16:30
End Date
Expired 27/09/2023

Expired 1011 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Repair/maint of black top road and replacement of furniture at 19 ad, 707 tsu, 955 and other units under zone b under ge(i) gos

Repair/maint of black top road and replacement of furniture at 19 ad, 707 tsu, 955 and other units under zone b under ge(i) gos

Read more
A)extension of overhead line through ab cable for illumination purpose b)installation of distribution transformer c)erection of 3.3kv ohl for installed of 315kva transformer d)renovation and erection of 440 volt head line of sarubera colliery .

A)extension of overhead line through ab cable for illumination purpose b)installation of distribution transformer c)erection of 3.3kv ohl for installed of 315kva transformer d)renovation and erection of 440 volt head line at sarubera colliery.

Read more
Dismantling, fabrication/erection, repairing of transfer b/c and r.o.m. b/c skirt frame, skirt rubber, take up drum structure etc. work at p.c.h. section of sawang washery.

Dismantling, fabrication/erection, repairing of transfer b/c and r.o.m. b/c skirt frame, skirt rubber, take up drum structure etc. work at p.c.h. section of sawang washery.

Read more
Fabrication/erection of hood/protective cover of rom b/c, picking b/c, reversible b/c and replacement and repairing of skirt rubber frame of bypass b/c and traverse b/c in pch section at sawang washery.

Fabrication/erection of hood/protective cover of rom b/c, picking b/c, reversible b/c and replacement and repairing of skirt rubber frame of bypass b/c and traverse b/c in pch section at sawang washery.

Read more
Repairing and fabrication of wheel gear pinion of reciprocating feeder (b side) 122 teeth for p.c.h. section at sawang washery.

Repairing and fabrication of wheel gear pinion of reciprocating feeder (b side) 122 teeth for p.c.h. section at sawang washery.

Read more
Repairing of reversible bc, transfer bc and a and b shuttle bc chain sprocket at pch section of sawang washery.

Repairing of reversible bc, transfer bc and a and b shuttle bc chain sprocket at pch section of sawang washery.

Read more
Fabrication / erection and repairing of top roller frame of different belts conveyor bc-04, bc-08, bc-09, bc-10 of sawang washery.

Fabrication / erection and repairing of top roller frame of different belts conveyor bc-04, bc-08, bc-09, bc-10 of sawang washery.

Read more
Fabrication / erection and repairing of r.o.m conveyor structure including replacement of channel and angles repairing of take up drum structure er weight and feeder a and b base structure of pch section at sawang washery.

Fabrication / erection and repairing of r.o.m conveyor structure including replacement of channel and angles repairing of take up drum structure er weight and feeder a and b base structure of pch section at sawang washery.

Read more
Fabrication/erection and repairing of a side hopper plates, structures and feeder discharge chute liner plate change etc. work of p.c.h. section at sawang washery.

Fabrication/erection and repairing of a side hopper plates, structures and feeder discharge chute liner plate change etc. work of p.c.h. section at sawang washery.

Read more
Fabrication/erection of steel structural work for b side grizzly and repairing of fresh water shower pipeline for water sprinkling in both side hopper at p.c.h. section of sawang washery.

Fabrication/erection of steel structural work for b side grizzly and repairing of fresh water shower pipeline for water sprinkling in both side hopper at p.c.h. section of sawang washery.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise