Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
097/25 Side Protection Of Sub Canals
|
| Description |
097/25 Side Protection Of Sub Canals
|
| Organisation | Local Self Government Department | State Govt. and UT |
| Tender Id | 2024_LSGD_719598_1 |
|
Reference Number |
LSGD/CELSGD/FL/97649/2024 |
| Tender Fee | 2760 |
| EMD | 50000 |
| Tender Value | - |
| Place | Chellanam GP |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1207603 |
| Start Date | March 07, 2025 14:30 |
| End Date |
Expired
14/03/2025
Expired 579 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Upgradation/ modernization of existing canals of ganderbal constituency.
Upgradation/ modernization of existing canals of ganderbal constituency.
Read moreLeasing out tourism site at talwandi nipalan (makhu canals colony)
Leasing out tourism site at talwandi nipalan (makhu canals colony)
Read moreCustom bid for services - defect rectification on port main engine onboard c-431(e-097)
Custom bid for services - defect rectification on port main engine onboard c-431(e-097)
Read moreGeneral kip lb action plan 2026 27 annual maintenance of canals removal of floating materials and other debris from canals and cleaning of canals kottiyam branch canal ch 10760 m to ch 22360 m mukhathala distributary ch 0 m to 3320 m mylakkadu dis
General kip lb action plan 2026 27 annual maintenance of canals removal of floating materials and other debris from canals and cleaning of canals kottiyam branch canal ch 10760 m to ch 22360 m mukhathala distributary ch 0 m to 3320 m mylakkadu dis
Read moreGeneral kip lb action plan 2026 27 annual maintenance of canals removal of floating materials and other debris from canals and cleaning of canals kottiyam branch canal ch 0 m to 10760 m perumpuzha distributary ch 0 m to 3320 m punukkannoor minor d
General kip lb action plan 2026 27 annual maintenance of canals removal of floating materials and other debris from canals and cleaning of canals kottiyam branch canal ch 0 m to 10760 m perumpuzha distributary ch 0 m to 3320 m punukkannoor minor d
Read moreRe-excavation of 03 (three) number canals including cross culvert and installation of solar operated pumping system with bank protection at different mouzas under amta-ii block of howrah district under core-sector program
Re-excavation of canal from narit p.h.e water tank to narit battala including cross culvert and installation of solar operated pumping system with bank protection at mouza- narit under amta-ii block of howrah district under howrah (ai) division.
Read moreRe-excavation of 03 (three) number canals including cross culvert and installation of solar operated pumping system with bank protection at different mouzas under amta-ii block of howrah district under core-sector program
Re-excavation of canal from sirol pirtala to sirol manasatala including cross culvert and installation of solar operated pumping system with bank protection mouza- sirol under amta-ii block of howrah district under howrah (ai) division.
Read moreRe-excavation of 03 (three) number canals including cross culvert and installation of solar operated pumping system with bank protection at different mouzas under amta-ii block of howrah district under core-sector program
Re-excavation of canal from narit uttar math bhaba bheri bundh to kamargoria anasatala including cross culvert and installation of solar operated pumping system with bank protection at mouza- narit under amta-ii block of howrah district.
Read moreRepairs to lower dam canals near easgaon (v), kaghaznagar (m), kumaram bheem asifabad (dist).
Repairs to lower dam canals near easgaon (v), kaghaznagar (m), kumaram bheem asifabad (dist).
Read moreGps - i - rbc - 2026 - 2027 - annual maintenance -jungle clearance and silt removal of canals - under rbc irrigation section, oottara-for karippode branch canal and pudunagaram branch canal - all canals from ch. 0/000 km to tail end
Gps - i - rbc - 2026 - 2027 - annual maintenance -jungle clearance and silt removal of canals - under rbc irrigation section, oottara-for karippode branch canal and pudunagaram branch canal - all canals from ch. 0/000 km to tail end
Read moreof your Industry type