Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Procurement Of Slip Resistant Water Proof Oil Absorbent Mat
|
Description |
|
Organisation | Department of Military Affairs | Ministry of Defence |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link |
AAAAAAAAAA Login to view |
Start Date | June 13, 2025 15:38 |
End Date |
04/07/2025 ( 19 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Procurement of oil cooler for ash slurry pump for ahd gadarwara
Procurement of oil cooler for ash slurry pump for ahd gadarwara
Read moreCustom bid for services - rate contract for inspection and repair of floating roof crude oil tanks
Read more
Package iii civil works of water conductor system and power house complex of tato ii hydro electric project
Package iii civil works of power intake, head race tunnel, surge shaft, valve chamber, pressure shafts and penstock, underground powerhouse complex (comprising of powerhouse cavern, transformer - gis cavern, etc. of tato ii hep
Read moreRepair and water proofing of roof top dg station and paper store buildings at plant area, brbnmpl, mysuru
E-tenders are invited from eligible and qualified tenderers meeting qualification criteria for supply of the following goods and/or services/works. mstc event no.: brbnmpl/mysuru press/mmd/6/25-26/et/16
Read moreThree-year comprehensive annual maintenance contract (camc) for environmental control system (electrical, mechanical, water treatment plant and ro plant, excluding bms system) for 13 underground metro stations of l-2 and l-3 , and three-year..
Three-year comprehensive annual maintenance contract (camc) for environmental control system (electrical, mechanical, water treatment plant and ro plant, excluding bms system) for 13 underground metro stations of l-2 and l-3 , and three-year..
Read morePurchase of whole wheat atta, refind oil, mustard oil, rice parmal, rice sharbati long grain and rice basmati through rate contract for the period of one year.
Purchase of whole wheat atta, refind oil, mustard oil, rice parmal, rice sharbati long grain and rice basmati through rate contract for the period of one year.
Read moreProvision of gas godown and connected infrastructure for vayu sena gas agency and provn of iron grill cover water tanks ph i in domestic area at afs tezpur
Provision of gas godown and connected infrastructure for vayu sena gas agency and provn of iron grill cover water tanks ph i in domestic area at afs tezpur 
 
Read moreConstruction of rcc cable trench, supply and laying of ht cable for crude oil import terminal of m/s numaligarh refinery limited.
Construction of rcc cable
 trench, supply and laying of
 ht cable for crude oil
 import terminal of m/s
 numaligarh refinery
 limited.
Read moreEpc package for development of 10mld water treatment plant package for
Epc package for development of 10mld water treatment plant package forngel green hydrogen hub at pudimadaka anakapalli district andhra pradesh
Read moreHiring services of one no. brand new vehicle diesel driven, bs vi or latest compliance, brand mahindra bolero model b4 base model 2 wheeled drive under oil, ps6, bongaigaon for a period of 4 years
Hiring services of one no. brand new vehicle diesel driven, bs vi or latest compliance, brand mahindra bolero model b4 base model 2 wheeled drive under oil, ps6, bongaigaon for a period of 4 years
Read moreof your Industry type