Tender Details
Particulars | Details |
---|---|
Title |
Ar, Sr, Mow Water Supply And Sanitary Fitting On Rb Section No. 2 At Sub Dn. Ujjain Dn. Ujjain. (First Call)
|
Description |
Ar, Sr, Mow Water Supply And Sanitary Fitting On Rb Section No. 2 At Sub Dn. Ujjain Dn. Ujjain. (First Call)
|
Organisation | Government of Madhya Pradesh |
Tender Id | 2023_PWDRB_313226_1 |
Reference Number |
27 (10)/SAC/2023-24/Ujjain Dated 29.09.2023 |
Tender Fee | 2000 |
EMD | 40000 |
Tender Value | |
Place | EE PWD UJJAIN |
Link | https://mptenders.gov.in |
Start Date | October 05, 2023 16:00 |
End Date |
11/10/2023 ( Expired 583 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Widening of narrow major bridge 2no to four lane configuration nh 548c section tembhurni to kuslamb at ch. 194.470 sina river bridge and ch. 197.125 widening of narrrow minor bridge 2 no at ch. 168.270 and ch. 180.525 and reconstruction of narrow m
Widening of narrow major bridge 2no to four lane configuration nh 548c section tembhurni to kuslamb at ch. 194.470 sina river bridge and ch. 197.125 widening of narrrow minor bridge 2 no at ch. 168.270 and ch. 180.525 and reconstruction of narrow m
Read moreSurface cleaning and painting work of tower structures of total 02 no 132kv ehv lines (total 617 nos. towers and weight of towers 2105.97mt) under eht-maint. dn satna on labour contract basis at the risk and cost of m/s. shri vardhman trade, jabalpu
Surface cleaning and painting work of tower structures of total 02 no 132kv ehv lines (total 617 nos. towers and weight of towers 2105.97mt) under eht-maint. dn satna on labour contract basis at the risk and cost of m/s. shri vardhman trade, jabalpu
Read moreConstruction of 2 no. of grade separated interchanges at km 113.730 (ranchi-hazaribagh road) and km 139.225 (ranchi-jamshedpur road) on 4 laning stretch of ranchi bypass of nh-33 in jharkhand on epc mode under nh(o).(total length 6.06 km)-2nd call
Construction of 2 no. of grade separated interchanges at km 113.730 (ranchi-hazaribagh road) and km 139.225 (ranchi-jamshedpur road) on 4 laning stretch of ranchi bypass of nh-33 in jharkhand on epc mode under nh(o).(total length 6.06 km)-2nd call
Read moreR and r of bituminous concrete 30 mm on road from approach road to check post no. 2 , from check post no. 1 to circle office and other patch work at shanan power house , joginder nagar distt mandi (hp)
R and r of bituminous concrete 30 mm on road from approach road to check post no. 2 , from check post no. 1 to circle office and other patch work at shanan power house , joginder nagar distt mandi (hp)
Read moreMtc of type ii iii and iv qtr total 24 nos under kumarghat sub divisional hospital during the year 2024 25 sh r c c work finishing work water supply and sanitary line etc
Mtc of type ii iii and iv qtr total 24 nos under kumarghat sub divisional hospital during the year 2024 25 sh r c c work finishing work water supply and sanitary line etc
Read moreChambal alwar bharatpur water supply project package 2 based on hybrid annuity model ace(p) bharatpur nit no. 05 / 2024-25
Work of construction of intermediate cwph at kotra baseri laying of clear water transmission main from kotra to naroli nadbai via junction 2 at naroli ips nadbai nagar ramgarh kishangarhbas tijara jairoli and bhiwadi based on ham model under jjm
Read moreConstruction of rcc elevated over head reservoir (intze type) of capacity 600 cum at zone- 7, ward -4 with house service connection at zone 1 and 2 and jack pushing under sh of zone-7 within buniadpur municipality under proposed water supply scheme o
Construction of rcc elevated over head reservoir (intze type) of capacity 600 cum at zone- 7, ward -4 with house service connection at zone 1 and 2 and jack pushing under sh of zone-7 within buniadpur municipality under proposed water supply scheme o
Read moreConstruction of 2-lane rob at lc no.ab-27 (belbahara rob) on manendragarh to ambikapur section of nh-43 (old nh-78) at nh km 264.000 and railway chainage 937.14-15 between udalkachar-boridand stations in the state of chhattisgarh
Construction of 2-lane rob at lc no.ab-27 (belbahara rob) on manendragarh to ambikapur section of nh-43 (old nh-78) at nh km 264.000 and railway chainage 937.14-15 between udalkachar-boridand stations in the state of chhattisgarh
Read moreSupply, delivery, installation, testing, commissioning with 3 month trial 5 years operation and maintenance of pumping machineries raw water pumping -6 no of pumps each of (1250 cum/hr.) 415v mcc at pump house, power distribution of th
Supply, delivery, installation, testing, commissioning with 3 month trial 5 years operation and maintenance of pumping machineries raw water pumping -6 no of pumps each of (1250 cum/hr.) 415v mcc at pump house, power distribution of th
Read moreSupply, erection, testing, commissioning for creation of 250 kva sub-station alongwith laying of ht line and laying of lt line under jjm scheme at wss dhan under the jurisdiction of electric division div-i (jpdcl) jammu on turn key basis
Supply, erection, testing, commissioning for creation of 250 kva sub-station alongwith laying of ht line and laying of lt line under jjm scheme at wss dhan under the jurisdiction of electric division div-i (jpdcl) jammu on turn key basis
Read moreof your Industry type