Tender Details

Particulars Details
Title
Fabrication Supply And Erection Of Bottom Support Assembly For 1200 Mm Butterfly Valve Discharge Pipe Of 1274 Mm Dia For Cooling Water Pump 2 A 2 B 2 C And 2 D Of Unit Ii
Description
Fabrication Supply And Erection Of Bottom Support Assembly For 1200 Mm Butterfly Valve Discharge Pipe Of 1274 Mm Dia For Cooling Water Pump 2 A 2 B 2 C And 2 D Of Unit Ii
Organisation TNEB Limited | State Govt. and UT
Tender Id 2025_EB_519083_1
Reference
Number
CE/TTPS/4138M
Tender Fee 0
EMD 16100
Tender Value
Place TTPS
Link https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=617720
Start Date January 20, 2025 19:30
End Date

06/02/2025 ( Expired 98 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Fabrication and erection of pipe rack for rsps-2 project at tnpl unit-i

Fabrication and erection of pipe rack for rsps-2 project at tnpl unit-i

Read more
Supply of material, fabrication at supplier works, transportation, erection and testing of stainless steel tanks, vat and chutes for tm5 of tnpl unit ii phase ii

Supply of material, fabrication at supplier works, transportation, erection and testing of stainless steel tanks, vat and chutes for tm5 of tnpl unit ii phase ii

Read more
Ttps operation circle cad cwph ii dismantling the badly worn out working platform and fabrication and erection of new m.s structural working platform for 1200mm butterfly valve in cwph ii at unit iv and v

Ttps operation circle cad cwph ii dismantling the badly worn out working platform and fabrication and erection of new m.s structural working platform for 1200mm butterfly valve in cwph ii at unit iv and v

Read more
Mtps i tm i unit iv inspection and overhauling of oil vapour extraction fan assembly and renewal of gaskets of turbine lub oil line valves nrvs and existing worn out cooling water pipe line of inlet outlet and vent pipes of tloc soc ac lop

Mtps i tm i unit iv inspection and overhauling of oil vapour extraction fan assembly and renewal of gaskets of turbine lub oil line valves nrvs and existing worn out cooling water pipe line of inlet outlet and vent pipes of tloc soc ac lop

Read more
Steel structural work for complete dismantling, fabrication and erection of deck sheets, chequered plates with supporting structure along with foundation strengthening in crusher house, conveyor 8c,9c,10c,11c,1c and 2c in chp phase-i and phase-ii

Steel structural work for complete dismantling, fabrication and erection of deck sheets,chequered plates with supporting structure along with foundation strengthening in crusher house,conveyor 8c,9c,10c,11c,1c and 2c in chp phase-i and phase-ii

Read more
Design, engineering, construction, supply, erection, commissioning and testing of four number of natural draught cooling towers, cooling water pump house and associated works for ghavp unit 1 and 2 at vill gorakhpur, distt fatehabad, haryana.

Design, engineering, construction, supply, erection, commissioning and testing of four number of natural draught cooling towers, cooling water pump house and associated works for ghavp unit 1 and 2 at vill gorakhpur, distt fatehabad, haryana.

Read more
Contract for fabrication, erection and installation of equipment, pipelines, structures, platforms, cable and pipe racks of new pastillation unit.

Contract for fabrication, erection and installation of equipment, pipelines, structures, platforms, cable and pipe racks of new pastillation unit.

Read more
Service contract for fabrication and erection of canopy at different drives of unit-3 and 4 under emiph-ii, sgtpp.

Service contract for fabrication and erection of canopy at different drives of unit-3 and 4 under emiph-ii, sgtpp.

Read more
Ktps-v-cam-laying of fire crete cement to the bottom ash hoppers, fabrication and replacement of refractory cooling water headers and laying of 200nb ci pipes of bottom ash handling system for unit-9 during the overhaul 2025-2026-reg.

Ktps-v-cam-laying of fire crete cement to the bottom ash hoppers, fabrication and replacement of refractory cooling water headers and laying of 200nb ci pipes of bottom ash handling system for unit-9 during the overhaul 2025-2026-reg.

Read more
Drilling of 6 1/2 dia borewell, supply, delivery and erection of suitable submersible pump with accessories and laying and jointing of hdpe pipe line work at: janachaitanya park-65 phase -ii, circle-11, rajendr nagar, charminar zone, ubd, ghmc for the year 2025-26

Drilling of 6 1/2 dia borewell, supply, delivery and erection of suitable submersible pump with accessories and laying and jointing of hdpe pipe line work at :- janachaitanya park-65 phase-ii, circle-11, rajendra nagar, charminar zone, ubd, ghmc for the year 2025-26

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise