Tender Details
Particulars | Details |
---|---|
Title |
Fabrication Supply And Erection Of Bottom Support Assembly For 1200 Mm Butterfly Valve Discharge Pipe Of 1274 Mm Dia For Cooling Water Pump 2 A 2 B 2 C And 2 D Of Unit Ii
|
Description |
Fabrication Supply And Erection Of Bottom Support Assembly For 1200 Mm Butterfly Valve Discharge Pipe Of 1274 Mm Dia For Cooling Water Pump 2 A 2 B 2 C And 2 D Of Unit Ii
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_519083_1 |
Reference Number |
CE/TTPS/4138M |
Tender Fee | 0 |
EMD | 16100 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=617720 |
Start Date | January 20, 2025 19:30 |
End Date |
06/02/2025 ( Expired 98 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Fabrication and erection of pipe rack for rsps-2 project at tnpl unit-i
Fabrication and erection of pipe rack for rsps-2 project at tnpl unit-i
Read moreSupply of material, fabrication at supplier works, transportation, erection and testing of stainless steel tanks, vat and chutes for tm5 of tnpl unit ii phase ii
Supply of material, fabrication at supplier works, transportation, erection and testing of stainless steel tanks, vat and chutes for tm5 of tnpl unit ii phase ii
Read moreTtps operation circle cad cwph ii dismantling the badly worn out working platform and fabrication and erection of new m.s structural working platform for 1200mm butterfly valve in cwph ii at unit iv and v
Ttps operation circle cad cwph ii dismantling the badly worn out working platform and fabrication and erection of new m.s structural working platform for 1200mm butterfly valve in cwph ii at unit iv and v
Read moreMtps i tm i unit iv inspection and overhauling of oil vapour extraction fan assembly and renewal of gaskets of turbine lub oil line valves nrvs and existing worn out cooling water pipe line of inlet outlet and vent pipes of tloc soc ac lop
Mtps i tm i unit iv inspection and overhauling of oil vapour extraction fan assembly and renewal of gaskets of turbine lub oil line valves nrvs and existing worn out cooling water pipe line of inlet outlet and vent pipes of tloc soc ac lop
Read moreSteel structural work for complete dismantling, fabrication and erection of deck sheets, chequered plates with supporting structure along with foundation strengthening in crusher house, conveyor 8c,9c,10c,11c,1c and 2c in chp phase-i and phase-ii
Steel structural work for complete dismantling, fabrication and erection of deck sheets,chequered plates with supporting structure along with foundation strengthening in crusher house,conveyor 8c,9c,10c,11c,1c and 2c in chp phase-i and phase-ii
Read moreDesign, engineering, construction, supply, erection, commissioning and testing of four number of natural draught cooling towers, cooling water pump house and associated works for ghavp unit 1 and 2 at vill gorakhpur, distt fatehabad, haryana.
Design, engineering, construction, supply, erection, commissioning and testing of four number of natural draught cooling towers, cooling water pump house and associated works for ghavp unit 1 and 2 at vill gorakhpur, distt fatehabad, haryana.
Read moreContract for fabrication, erection and installation of equipment, pipelines, structures, platforms, cable and pipe racks of new pastillation unit.
Contract for fabrication, erection and installation of equipment, pipelines, structures, platforms, cable and pipe racks of new pastillation unit.
Read moreService contract for fabrication and erection of canopy at different drives of unit-3 and 4 under emiph-ii, sgtpp.
Service contract for fabrication and erection of canopy at different drives of unit-3 and 4 under emiph-ii, sgtpp.
Read moreKtps-v-cam-laying of fire crete cement to the bottom ash hoppers, fabrication and replacement of refractory cooling water headers and laying of 200nb ci pipes of bottom ash handling system for unit-9 during the overhaul 2025-2026-reg.
Ktps-v-cam-laying of fire crete cement to the bottom ash hoppers, fabrication and replacement of refractory cooling water headers and laying of 200nb ci pipes of bottom ash handling system for unit-9 during the overhaul 2025-2026-reg.
Read moreDrilling of 6 1/2 dia borewell, supply, delivery and erection of suitable submersible pump with accessories and laying and jointing of hdpe pipe line work at: janachaitanya park-65 phase -ii, circle-11, rajendr nagar, charminar zone, ubd, ghmc for the year 2025-26
Drilling of 6 1/2 dia borewell, supply, delivery and erection of suitable submersible pump with accessories and laying and jointing of hdpe pipe line work at :- janachaitanya park-65 phase-ii, circle-11, rajendra nagar, charminar zone, ubd, ghmc for the year 2025-26
Read moreof your Industry type