Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Fabrication Supply And Erection Of Bottom Support Assembly For 1274 Mm Discharge Pipes Of Cooling Water Pump 4 A At Cwph Ii
|
| Description |
Fabrication Supply And Erection Of Bottom Support Assembly For 1274 Mm Discharge Pipes Of Cooling Water Pump 4 A At Cwph Ii
|
| Organisation | Government of Tamil Nadu |
| Tender Id | 2023_EB_376538_1 |
|
Reference Number |
CE/TTPS/3794-M |
| Tender Fee | 0 |
| EMD | 23700 |
| Tender Value | - |
| Place | SEPATTPS |
| Link |
View Original Tender Notice
https://tntenders.gov.in |
| Start Date | October 06, 2023 21:30 |
| End Date |
Expired
30/10/2023
Expired 1084 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Dismantling, stacking, fabrication and erection of pipes and valves in rb#3 lime kiln use in srp mechanical
Dismantling, stacking, fabrication and erection of pipes and valves in rb#3 lime kiln use in srp mechanical
Read moreRepair, maintenance, and installation of plant/ systems/equipments (version 2) - thermal power station sikka work of fabrication and erection work of ms platforms approaches support railings grills and ladders of ash conveying structure of bottom ..
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - thermal power station sikka work of fabrication and erection work of ms platforms approaches support railings grills and ladders of ash conveying structure of bottom ..
Read moreSupply and erection of ss304 pipes fittings and ms support structure hydro test detailded specification as per annexure attached,supply and erection of ductile iron pipe dia 150 mm,core cutting of 200 mm length and 50mm dia,welding for erection of ss304 pipes fittings and support structure with pad plates,dismantling cutting and disposal of existing pipeline fittings and supports
Supply and erection of ss304 pipes fittings and ms support structure hydro test detailded specification as per annexure attached,supply and erection of ductile iron pipe dia 150 mm,core cutting of 200 mm length and 50mm dia,welding for erection of ss304 pipes fittings and support structure with pad plates,dismantling cutting and disposal of existing pipeline fittings and supports
Read moreNctps i operation circle ca dn cwph unit iii overhauling of air release valves and their isolation valves in cwp discharge line of unit iii removal and refixing of man hole covers of cooling water inlet tunnel near switch yard for facilitating tun
Nctps i operation circle ca dn cwph unit iii overhauling of air release valves and their isolation valves in cwp discharge line of unit iii removal and refixing of man hole covers of cooling water inlet tunnel near switch yard for facilitating tun
Read moreNctps i operation circle ca dn cwph unit ii overhauling of air release valves and their isolation valves in cwp discharge line of unit ii removal and refixing of man hole covers of cooling water inlet tunnel near switch yard for facilitating tun
Nctps i operation circle ca dn cwph unit ii overhauling of air release valves and their isolation valves in cwp discharge line of unit ii removal and refixing of man hole covers of cooling water inlet tunnel near switch yard for facilitating tun
Read moreTtps mech ii bm unit i replacement of damaged bottom plate corroded portion of side plate including supply fabrication dismantling and erection of cst tank in unit i boiler
Ttps mech ii bm unit i replacement of damaged bottom plate corroded portion of side plate including supply fabrication dismantling and erection of cst tank in unit i boiler
Read moreWorks contract for fabrication, erection, testing, calibration, etc. for fixed (cone) roof storage tanks in connection with tankage work for lube modernization and bottom upgradation (lmbu) project of hpcl, mumbai refinery, india
Works contract for fabrication, erection, testing, calibration, etc. for fixed (cone) roof storage tanks in connection with tankage work for lube modernization and bottom upgradation (lmbu) project of hpcl, mumbai refinery, india
Read moreRepair, maintenance, and installation of plant/ systems/equipments (version 2) - supply, fabrication & erection of pipes and structures in auxiliary plant of kknpp-1&2 as per scope of work as per scope of work
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - supply, fabrication & erection of pipes and structures in auxiliary plant of kknpp-1&2 as per scope of work as per scope of work
Read moreSet of split pin for ir03h pantograph. each set consisting of 09 items (21 nos) as per enclosed annexure b. set of spilt pins for pantograph type ir ? 03h sl. description part no qty/set 1. split pin for push rod assembly (dia 3mm x 30l) c0090004 02nos 2 . split pin for steady link assembly(dia1.5mm x 30l) c0090005 01nos 3. split pin for support rod cylinder assembly bottom side(dia 4mm x 56l) c00150012 02 nos. 4 . split pin for support rod cylinder assembly top side ( dia 3mm x 30l) c00150014
Set of split pin for ir03h pantograph. each set consisting of 09 items (21 nos) as per enclosed annexure b. set of spilt pins for pantograph type ir ? 03h sl. description part no qty/set 1. split pin for push rod assembly (dia 3mm x 30l) c0090004 02nos 2 . split pin for steady link assembly(dia1.5mm x 30l) c0090005 01nos 3. split pin for support rod cylinder assembly bottom side(dia 4mm x 56l) c00150012 02 nos. 4 . split pin for support rod cylinder assembly top side ( dia 3mm x 30l) c00150014
Read more1 siemens make shutter lifter part no 8pu15880ds010aa0,2 siemens make holder for ip for trolley part no 8pu15880di010aa0,3 siemens make assembly for bottom lever draw out component part no 8pu15880dh010aa0,4 siemens make assembly for top lever drawout component part no 8pu15880dh020aa0,5 siemens make bottom bugel for drawout component part no 8pu15880db010aa0,6 siemens make top bugel for drawout component part no 8pu15880db020aa0,7 siemens make u clips for drawout component part no 8pu15880fg040aa0,8 siemens make support for earthing spring drawout component part no 8pu15880de020aa0,9 siemens make 9 way socket assembly t and s drawout component part no 8pu15880dt030aa0,10 siemens make power lyra contact 125 amp part no 8pu15880dl010aa0 z s25l10,11 siemens make 400 a plug assembly l small for lt panel,12 siemens make 400 a plug assembly z small for siemens make lt panels part no 8pu15880dl030aa0,13 siemens make guide latch for top bottom draw out component cat no 8pu15880dg010aa0,14 siemens make mould assy bar
1 siemens make shutter lifter part no 8pu15880ds010aa0,2 siemens make holder for ip for trolley part no 8pu15880di010aa0,3 siemens make assembly for bottom lever draw out component part no 8pu15880dh010aa0,4 siemens make assembly for top lever drawout component part no 8pu15880dh020aa0,5 siemens make bottom bugel for drawout component part no 8pu15880db010aa0,6 siemens make top bugel for drawout component part no 8pu15880db020aa0,7 siemens make u clips for drawout component part no 8pu15880fg040aa0,8 siemens make support for earthing spring drawout component part no 8pu15880de020aa0,9 siemens make 9 way socket assembly t and s drawout component part no 8pu15880dt030aa0,10 siemens make power lyra contact 125 amp part no 8pu15880dl010aa0 z s25l10,11 siemens make 400 a plug assembly l small for lt panel,12 siemens make 400 a plug assembly z small for siemens make lt panels part no 8pu15880dl030aa0,13 siemens make guide latch for top bottom draw out component cat no 8pu15880dg010aa0,14 siemens make mould assy bar
Read moreof your Industry type