Tender Details
Particulars | Details |
---|---|
Title |
Mtg Of Roads Kdmd007 Kdod018 Kdmd312 Package Ii In Lakkireddypalli Mandal Of Lakkireddypalli Section For The Year 2025 26 In Annamayya District
|
Description |
Maintaning Of Roads Kdmd007, Kdod018, Kdmd312 Package Ii In Lakkireddy Palli Mandal Of Lakkireddy Palli Section For The Year 2025 26 In Annamayya Dist.
|
Organisation | Information Technology, Electronics and Communications Andhra Pradesh | State Govt. and UT |
Tender Id | 813967 |
Reference Number |
Nit No.35/2025-26/T.O/Dt: 14.05.2025 |
Tender Fee | 105 |
EMD | 3000 |
Tender Value | |
Place | AP |
Link | https://tender.apeprocurement.gov.in |
Start Date | May 27, 2025 20:30 |
End Date |
10/06/2025 ( Expired 1 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
AAAAAAAAAA
Login to viewNotice inviting expression of interest eoi for registration of radiologist and firms for empanelment in tele radiology reporting panel
Read morePerpetual empanelment of contractors for execution of various types and nature of engineering works under tamil nadu state office under category-i (0-100 lacs) category- ii (100-200 lacs)- empanelment for ii nd year
Perpetual empanelment of contractors for execution of various types and nature of engineering works under tamil nadu state office under category-i (0-100 lacs) and category- ii (100-200 lacs)- empanelment for ii nd year
Read moreCs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Read moreLot-iii electro-mechanical works package of 240 mw (2x120mw) uri-i stage-ii h.e project
Lot-iii electro-mechanical works package of 240 mw (2x120mw) uri-i stage-ii h.e project, baramulla district of ut of j and k, india
Read moreConsultancy services for preparation of dpr for widening to 4 lane divided carriageway of chhapra rewaghat muzaffarpur section of nh-722 in the state of bihar
Consultancy services consultancy services for preparation of dpr for widening to 4 lane divided carriageway of chhapra rewaghat muzaffarpur section of nh-722 in the state of bihar
Read moreConsultancy services for preparation of detailed project report for development of 4lane national highway 128b from ballia (junction on nh31 near teekha) to mau (length 56km) section in uttar pradesh
Consultancy services for preparation of detailed project report for development of 4lane national highway 128b from ballia (junction on nh31 near teekha) to mau (length 56km) section in uttar pradesh
Read moreTower package tw02 for sarchu to zing-zingbar portion of 350 kv hvdc pang-kaithal line
Tower package tw02 for sarchu to zing-zingbar portion of 350 kv hvdc pang-kaithal line associated with transmission system for evacuation of re power from renewable energy parks in leh (5 gw leh-kaithal transmission corridor)
Read moreTower package tw03 for zing-zingbar to sissu portion of 350 kv hvdc pang-kaithal transmission line
Tower package tw03 for i zingzingbar to sissu portion of 350 kv hvdc pangkaithal line associated with transmission system for evacuation of re power from renewable energy parks in leh 5 gw lehkaithal transmission corridor under rtm route
Read moreConstr of bow string steel arch major bridge
Rfp for construction of bow string steel arch major bridge (2nos) across river iravanjippuzha in the
 kozhikode district of kerala state anakkampoyil kalladi meppadi package i
Read moreIndependent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Read moreof your Industry type