Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Balance Work Of Re Construction Of Anchor /Thrust Blocks Of Manifold Stage Ii Pump Hose Of Tral Lift Irrigation Scheme.
|
| Description |
Balance Work Of Re Construction Of Anchor /Thrust Blocks Of Manifold Stage Ii Pump Hose Of Tral Lift Irrigation Scheme.
|
| Organisation | I and FC | State Govt. and UT |
| Tender Id | 2024_IFC_268870_1 |
|
Reference Number |
Fresh Short Term e NIT No 11 of 2024-25 |
| Tender Fee | 1000 |
| EMD | 33560 |
| Tender Value | - |
| Place | Irrigation Division Tral |
| Link |
View Original Tender Notice
https://jktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=829456 |
| Start Date | December 24, 2024 23:30 |
| End Date |
Expired
03/01/2025
Expired 649 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Engine overhauling gasket complete,valve inlet and exhaust,valve oil,valve guide,valve seat inlet and exhaust,valve cutter lock,head bolt 10 no,main bearing,big end bearing,thrust washer,piston with piston pin and lock complete,cylinder sleeve,inlet and exhaust rocker spring,cam shaft cap bolt 10 no,sump bolt 10 no,throttle body complete assy with sensor,exhaust manifold stud with nut,piston ring set,timing belt,front timing cover,front timing cover bolt,cooling fan stud with nut 10 no,fuel pipe with clamp big and small,oil pump,inlet manifold stud with nut 12 no,tappet cover bolt 10 no,timing tensioner,water pump bolt 10 no,flywheel with ring,pilot bearing,oil dipstick o ring,radiator hose pipe with clamp,prv valve,suspension bush kit complete,front shock absorber,front and rear shackle pin nut with bush,front brake disc pad both side,front tube oil seal both side,front king pin shim,king pin bolt 12 no,knuckle oil seal bolt 10 no,rear wheel cylinder left side,rear hub bearing and cone both side,rear wheel t
Engine overhauling gasket complete,valve inlet and exhaust,valve oil,valve guide,valve seat inlet and exhaust,valve cutter lock,head bolt 10 no,main bearing,big end bearing,thrust washer,piston with piston pin and lock complete,cylinder sleeve,inlet and exhaust rocker spring,cam shaft cap bolt 10 no,sump bolt 10 no,throttle body complete assy with sensor,exhaust manifold stud with nut,piston ring set,timing belt,front timing cover,front timing cover bolt,cooling fan stud with nut 10 no,fuel pipe with clamp big and small,oil pump,inlet manifold stud with nut 12 no,tappet cover bolt 10 no,timing tensioner,water pump bolt 10 no,flywheel with ring,pilot bearing,oil dipstick o ring,radiator hose pipe with clamp,prv valve,suspension bush kit complete,front shock absorber,front and rear shackle pin nut with bush,front brake disc pad both side,front tube oil seal both side,front king pin shim,king pin bolt 12 no,knuckle oil seal bolt 10 no,rear wheel cylinder left side,rear hub bearing and cone both side,rear wheel t
Read moreConstruction of thrust/anchor blocks for rising main of lis jalsheeri and stage 2nd of lis janbazpora.
Construction of thrust/anchor blocks for rising main of lis jalsheeri and stage 2nd of lis janbazpora.
Read moreRepair of thrust blocks for ash disposal lines stage 3 at ntpc korba
Repair of thrust blocks for ash disposal lines stage 3 at ntpc korba.
Read moreConstruction of anchor /thrust blocks, protection work/ path for wss junk of pipes under (jkidfc) (part-2nd).
Construction of anchor /thrust blocks, protection work/ path for wss junk of pipes under (jkidfc) (part-2nd).
Read moreConstruction of outlet on 3rd stage canal of tral lift irrigation scheme near rd 8030 m
Construction of outlet on 3rd stage canal of tral lift irrigation scheme near rd 8030 m
Read moreClearance of silt from intake and sump of stage-ii pump house of tral lift irrigation scheme
Clearance of silt from intake and sump of stage-ii pump house of tral lift irrigation scheme
Read moreImprovements to canal stage 3rd from rd 3000- 6000 mts at spots of tral lift irrigation scheme
Improvements to canal stage 3rd from rd 3000- 6000 mts at spots of tral lift irrigation scheme
Read moreRepairment to chain link fencing around premises of 3rd stage pump house of tral lift irrigation scheme.
Repairment to chain link fencing around premises of 3rd stage pump house of tral lift irrigation scheme.
Read moreImprovements to canal stage 3rd from rd 400- 3000 mts at spots of tral lift irrigation scheme.
Improvements to canal stage 3rd from rd 400- 3000 mts at spots of tral lift irrigation scheme.
Read moreImprovements to canal stage 3rd from rd 400- 3000 mts at spots of tral lift irrigation scheme
Improvements to canal stage 3rd from rd 400- 3000 mts at spots of tral lift irrigation scheme
Read moreof your Industry type