Tender Details

Particulars Details
Title
White Topping Of Road Indra Market To Nh 12 Length 1.16 Km And Other Work Under M 3 Sub Dn ,New Bhopal Division,Pwd Bhopal
Description
White Topping Of Road Indra Market To Nh 12 Length 1.16 Km And Other Work Under M 3 Sub Dn ,New Bhopal Division,Pwd Bhopal
Organisation PWD- Roads and Bridges | State Govt. and UT
Tender Id 2025_PWDRB_402166_1
Reference
Number
22/2024-25/SAC/New Bhopal Dt 11-02-2025
Tender Fee 16534
EMD 2.34 Lakh
Tender Value
Place Bhopal
Link https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=473528
Start Date February 12, 2025 14:30
End Date

28/02/2025 ( Expired 111 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Read more
Up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, from design km 237.600 to km 292.750 (design length-55.150 chanderi link bypass) in the state of madhya pradesh

Up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, from design km 237.600 to km 292.750 (design length-55.150 chanderi link bypass) in the state of madhya pradesh

Read more
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25

Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25

Read more
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Read more
Raising strengthening and construction of flexible pavement road on esml total length 31.985 km with restoration of 7 nos. stud and construction of 13 nos. new studs from km 14.00 to km 26.275 of esml under bwsimp.

Raising, strengthening and construction of flexible pavement road on esml total length 31.985 km with restoration of 7 nos. stud and construction of 13 nos. new studs from km 14.00 to km 26.275 of esml under bwsimp.

Read more
Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)

Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)

Read more
Maintenance work from km 0/000 to km 57/25 (length 57.25 km) sendhwa to khetia section of nh-752g and from km 34/56 to km 36/00 (length 1.44 km) anjad thikri road section of nh 347b under short term maintenance contract in the state of madhya pradesh

Maintenance work from km 0/000 to km 57/25 (length 57.25 km) sendhwa to khetia section of nh-752g and from km 34/56 to km 36/00 (length 1.44 km) anjad thikri road section of nh 347b under short term maintenance contract in the state of madhya pradesh

Read more
Rehabilitation and up.gradation of guhagar chiplun helwak road from existing km 26.890 to 403.610, design km 26.230 to 403.000 nh 166 e length 13.77 km two lanes with paved shoulders configuration in the state of maharashtra on engineering, procureme

Rehabilitation and up.gradation of guhagar chiplun helwak road from existing km 26.890 to 403.610, design km 26.230 to 403.000 nh 166 e length 13.77 km two lanes with paved shoulders configuration in the state of maharashtra on engineering, procureme

Read more
Construction and up- gradation to two lane with paved shoulder in km 105.330 to 112.500 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-3) in the state of chhattisgarh.

Construction and up- gradation to two lane with paved shoulder in km 105.330 to 112.500 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-3) in the state of chhattisgarh.

Read more
Construction and up-gradation to two lane with paved shoulder in km 90.990 to 98.160 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-1) in the state of chhattisgarh.

Construction and up-gradation to two lane with paved shoulder in km 90.990 to 98.160 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-1) in the state of chhattisgarh.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise