Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Chitra East Ocp Under Sp Mines Area Ecl Road (On Deposit Basis) (Total Length 1.30 Km.)
|
| Description |
Construction Of Chitra East Ocp Under Sp Mines Area Ecl Road (On Deposit Basis) (Total Length 1.30 Km.)
|
| Organisation | State Highway Authority of Jharkhand | State Govt. and UT |
| Tender Id | 2025_SHAJ_106673_1 |
|
Reference Number |
SHAJ/Tech /Chitra/ECL Road/2024 |
| Tender Fee | 50000 |
| EMD | 7.56 Lakh |
| Tender Value | - |
| Place | Chitra Est OCP, Deoghar |
| Link |
View Original Tender Notice
https://jharkhandtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=143867 |
| Start Date | November 25, 2025 20:30 |
| End Date |
Expired
09/12/2025
Expired 291 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Consultancy services for preparation of detailed project report for construction of di of pwd road for expansion of chitra east ocp under sp mines area ecl (on deposit basis) under road division deoghar
Consultancy services for preparation of detailed project report for construction of di of pwd road for expansion of chitra east ocp under sp mines area ecl (on deposit basis) under road division deoghar
Read moreKasbitola to rengajhari route. total length 2.60 km.construction work of proposed length 1.30 km from kasbitola to sitaram bhautias farm.
Kasbitola to rengajhari route. total length 2.60 km.construction work of proposed length 1.30 km from kasbitola to sitaram bhautias farm.
Read moreConstruction of gajnai to balrakalan road legnth 2.50 km. , gajnai to imladham b.t. road lenght 1.30 km. and karari to bidbasan road length 2.40 km. total length 6.20 km.
Construction of gajnai to balrakalan road legnth 2.50 km. , gajnai to imladham b.t. road lenght 1.30 km. and karari to bidbasan road length 2.40 km. total length 6.20 km.
Read moreCleaning of garland drain and culvert (total length 1km) and trench cutting around the periphery of the mine, near the crusher etc (total length 3 km) for kabribad ocp, giridih area.
Cleaning of garland drain and culvert (total
 length 1km) and trench cutting around the
 periphery of the mine, near the crusher etc
 (total length 3 km) for kabribad ocp, giridih
 area.
Read moreSopd_ods_23_24_19 construction of nahartoli t.e. road from ch. 0.00m to 1300.00m (total length 1.30 km) under sopd-ods (tea garden road) for the year 2023-24
Sopd_ods_23_24_19 construction of nahartoli t.e. road from ch. 0.00m to 1300.00m (total length 1.30 km) under sopd-ods (tea garden road) for the year 2023-24&#x0d
Read moreI.r.q.p work in nh-32 saraidhela-sugiadih to hirak point road (length 2.230 km) and central hospital to co- operative colony road (length-1.30 km) total length 3.530 km under plan head for the year 2024-25
I.r.q.p work in nh-32 saraidhela-sugiadih to hirak point road (length 2.230 km) and central hospital to co- operative colony road (length-1.30 km) total length 3.530 km under plan head for the year 2024-25
Read moreConstruction of two lane road from badam coal block to bes railway siding total length 9.700 km. in block barkagaon, district hazaribagh on deposit basis
Construction of two lane road from badam coal block to bes railway siding total length 9.700 km. in block barkagaon, district hazaribagh on deposit basis
Read moreShifting of 3.3kv pumping substation (pss) at main sump downwards alongside haul road from current east side of mine to further north, near ob dump site along haul road, barmuri ocp, mugma area, ecl
Shifting of 3.3kv pumping substation (pss) at main sump, downwards alongside haul road from current east side of mine to further north, near ob dump site along haul road, barmuri ocp, mugma area, ecl
Read moreShifting of 3.3kv pumping substation (pss) at main sump, downwards alongside haul road from current east side of mine to further north, near ob dump site along haul road, barmuri ocp, mugma area, ecl.
Shifting of 3.3kv pumping substation (pss) at main sump, downwards alongside haul road from current east side of mine to further north, near ob dump site along haul road, barmuri ocp, mugma area, ecl.
Read moreMtc of road from kebal para to farm chowmuhani under khumulwng sub division during the year 2024 25 sh patch grouting, re carpetting, sand seal coat etc. total road length 4.00 km. (length to be repaired at ch. 1.10 km to 2.40 km) 1.30 km)
Mtc of road from kebal para to farm chowmuhani under khumulwng sub division during the year 2024 25 sh patch grouting, re carpetting, sand seal coat etc. total road length 4.00 km. (length to be repaired at ch. 1.10 km to 2.40 km) 1.30 km)
Read moreof your Industry type