Tender Details
Particulars | Details |
---|---|
Title |
AAAAAAAAAA Login to view |
Description |
Ghoksadanga Hospital Chowpathy To Atpukuri Road From 0.00 Km To 3.498 Km (In Different Stretches), Repairing Of Potholes, Patching Of Potholes Work Under Cooch Behar Highway Division In The District Of Cooch Behar .
|
Organisation | PW(ROADS)(SH) | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 25281 |
Tender Value | |
Place | Cooch Behar |
Link |
AAAAAAAAAA Login to view |
Start Date | May 10, 2025 14:30 |
End Date |
23/05/2025 ( 13 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreDevelop. of 4lane ac sirhind sehna sec of nh205ag from dak expressway ne5 near malerkotla ch79.200 to junc with lb highway nh754 ad near vill sehna ch.134.290 tl 55.09 km pkgii part of mohali barnala ic in punjab under nh(o) on ham
Develop. of 4lane ac sirhind sehna sec of nh205ag from dak expressway ne5 near malerkotla ch79.200 to junc with lb highway nh754 ad near vill sehna ch.134.290 tl 55.09 km pkgii part of mohali barnala ic in punjab under nh(o) on ham
Read moreConstruction of 2 lane service road from km. 1072.900 (umedganj canal) to km. 1079.400 (naya nohara under pass) section of nh 27 (kota bypass) in the state of rajasthan
Construction of 2 lane service road from km. 1072.900 (umedganj canal) to km. 1079.400 (naya nohara under pass) section of nh 27 (kota bypass) in the state of rajasthan
Read moreBalance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation of existing intermediate lane flexible pavement to 2l with ps from km 0.00 to km 75.00 on orchha tikamgarh shahgarh nh 539 in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation of existing intermediate lane flexible pavement to 2l with ps from km 0.00 to km 75.00 on orchha tikamgarh shahgarh nh 539 in the state of madhya pradesh on epc mode.
Read moreConstruction of road from wangti to bp 150, from km 0.000 to km 5.700 (net length 5.700 km) to nhsl specifications under 100 rcc/15 brtf in nagaland state
Construction of road from wangti to bp 150, from km 0.000 to km 5.700 (net length 5.700 km) to nhsl specifications under 100 rcc/15 brtf in nagaland state
Read moreMahisadal-nandigram road (mdr), from 5.650 km. to 10.650 km. - widening and strengthening works in the district of purba medinipur under tamluk division, pwd
Mahisadal-nandigram road (mdr), from 5.650 km. to 10.650 km. - widening and strengthening works in the district of purba medinipur under tamluk division, pwd, project id-pd252632621s000
Read moreServices of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Read moreWbpwd/pw(r)/sepd/piu-i/nit-06 of 2025-2026,sl-1
Dhulagarh -jujursah- ekabbarpur road, from 0.00 kmp to 9.00 kmp, widening and strengthening work under howrah highway division in the district of howrah under ridf -xxx.(2nd call)
Read moreConstruction of remaining works of fatgali to dhamoli -malujhal-okhalso motor road from garud-bageshwar motor road in district bageshwar assembly constituency under manifesto of honorable chief minister no 804/2014 (second phase stage 1)
Construction of remaining works of fatgali to dhamoli -malujhal-okhalso motor road from garud-bageshwar motor road in district bageshwar assembly constituency under manifesto of honorable chief minister no 804/2014 (second phase stage 1)
Read moreof your Industry type