Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Earthwork And Lining Of Nageli Minor No. 28, 29, 30 And 32 Respectively Ch. No. 63080, 64950, 65350, 67730 On I. R. B. C.
|
| Description |
Construction Of
Earthwork And Lining Of
Nageli Minor No. 28,
29, 30 And 32
Respectively Ch. No.
63080, 64950, 65350,
67730 On I. R. B. C.
|
| Organisation | Government of Maharashtra |
| Tender Id | 2023_CCCA_972729_1 |
|
Reference Number |
E-TENDER NOTICE NO. 5 FOR 2023-24 |
| Tender Fee | 2360 |
| EMD | 2.46 Lakh |
| Tender Value | - |
| Place | NANDED |
| Link |
View Original Tender Notice
https://mahatenders.gov.in |
| Start Date | December 19, 2023 15:15 |
| End Date |
Expired
02/01/2024
Expired 1019 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Recontruction of minor bridges in km 97/540 and ch 106/600 at abdimandi and kagzipura respectively near samruddhi mahamarg on daulatabad t point to khultabad road nh 752h taluka khultabad dist.chh.sambhajinagar.
Recontruction of minor bridges in km 97/540 and ch 106/600 at abdimandi and kagzipura respectively near samruddhi mahamarg on daulatabad t point to khultabad road nh 752h taluka khultabad dist.chh.sambhajinagar.
Read moreRailway track crossing by pipe pushing method at km/tp-66/27-29 and km/tp-66/28-30 between stations mxy and dxn of east central railway (bomb minor at km. 2.925) and km/tp-64/29-31 and km/tp-64/30-32 between stations mxy and wdm of east central railw
Railway track crossing by pipe pushing method at km/tp-66/27-29 and km/tp-66/28-30 between stations mxy and dxn of east central railway (bomb minor at km. 2.925) and km/tp-64/29-31 and km/tp-64/30-32 between stations mxy and wdm of east central railw
Read moreExecution of earthwork in formation, minor bridges, major bridges, station buildings, service buildings, p-way linking work, ballast supply, platform work , pf shelter, drain work, camping facilities, protection works, tunnel between ch: 116.205 km to ch: 116.415 km, and other allied works between barkote(ex) (ch: 98.325 km) - mahuldiha(ex) (ch: 117.525 km) including ambagaon yard in connection with talcher - bimalagarh new bg rail link project.
Execution of earthwork in formation, minor bridges, major bridges, station buildings, service buildings, p-way linking work, ballast supply, platform work , pf shelter, drain work, camping facilities, protection works, tunnel between ch: 116.205 km to ch: 116.415 km, and other allied works between barkote(ex) (ch: 98.325 km) - mahuldiha(ex) (ch: 117.525 km) including ambagaon yard in connection with talcher - bimalagarh new bg rail link project.
Read moreRepair of barbed wire fencing and painting of aluminum paint on barbed wire fencing along 75 mtr wide road central verge, road no. 13 and 17, between sector-28, 29 and 32, 33, yeida wc-h
Repair of barbed wire fencing and painting of aluminum paint on barbed wire fencing along 75 mtr wide road central verge, road no. 13 and 17, between sector-28, 29 and 32, 33, yeida wc-h
Read moreEngineering procurement and construction (epc) for construction of doubling work including earthwork, blanketing, minor bridges, major bridges, lhs/rubs, track works, platform work, station building, fobs, other buildings, associated s&t and electrical utility shifting works and associated miscellaneous works for 25t indian railway standard loading from karnauti station(including-ch. 2.844 km) to bihar sharif station(excluding-ch 29.350 km), from ch. 1.900 km to 28.192 km (total- 2
Engineering procurement and construction (epc) for construction of doubling work including earthwork, blanketing, minor bridges, major bridges, lhs/rubs, track works, platform work, station building, fobs, other buildings, associated s&t and electrical utility shifting works and associated miscellaneous works for 25t indian railway standard loading from karnauti station(including-ch. 2.844 km) to bihar sharif station(excluding-ch 29.350 km), from ch. 1.900 km to 28.192 km (total- 2
Read moreConstruction of new railway bg line in km 28/970 to 42/040 in between kulthana including and rajpura stations including earthwork, minor bridges (03 nos) and major bridges (07 nos), station buildings, tunnels (7 nos) and mega bridge ( 03 nos) in connection with ratlam mhow khandwa gauge conversion in the state of madhya pradesh
Construction of new railway bg line in km 28/970 to 42/040 in between kulthana including and rajpura stations including earthwork, minor bridges (03 nos) and major bridges (07 nos), station buildings, tunnels (7 nos) and mega bridge ( 03 nos) in connection with ratlam mhow khandwa gauge conversion in the state of madhya pradesh
Read moreEngineering procurement and construction (epc) of construction of viaducts, ror/rfo, major bridges, minor bridges, animal underpass, rub/lhs, tunnel/cut-cover, earthwork, blanketing, trolley refuge, turfing, buildings, retaining wall, toe wall etc. and other associated worksfor construction of new double line track for dfcc loading from ch.158.00 to ch.184 in koderma detour section in sonnagar-andal 3rd and 4th line project on epc mode in dhanbad division of east central railway.
Engineering procurement and construction (epc) of construction of viaducts, ror/rfo, major bridges, minor bridges, animal underpass, rub/lhs, tunnel/cut-cover, earthwork, blanketing, trolley refuge, turfing, buildings, retaining wall, toe wall etc. and other associated worksfor construction of new double line track for dfcc loading from ch.158.00 to ch.184 in koderma detour section in sonnagar-andal 3rd and 4th line project on epc mode in dhanbad division of east central railway.
Read moreEngineering procurement and construction (epc) of construction of new bg line work including earthwork, blanketing, minor bridges, major bridges, lhs/rubs, robs, track works, platform work, station building, fobs, other buildings, and associated miscellaneous works for 25t indian railway standard loading from ch. 1.350 km (excluding jhajha) to 22.000 km (including batia station) (total- 20.650 route km, 27.888 track km) in connection with the jhajha batia new line project
Engineering procurement and construction (epc) of construction of new bg line work including earthwork, blanketing, minor bridges, major bridges, lhs/rubs, robs, track works, platform work, station building, fobs, other buildings, and associated miscellaneous works for 25t indian railway standard loading from ch. 1.350 km (excluding jhajha) to 22.000 km (including batia station) (total- 20.650 route km, 27.888 track km) in connection with the jhajha batia new line project
Read moreItem no 1,item no 2,item no 3,item no 4,item no 5,item no 6,item no 7,item no 8,item no 9,item no 10,item no 11,item no 12,item no 13,item no 14,item no 15,item no 16,item no 17,item no 18,item no 19,item no 20,item no 21,item no 22,item no 23,item no 24,item no 25,item no 26,item no 27,item no 28,item no 29,item no 30,item no 31,item no 32,item no 33,item no 34,item no 35,item no 36
Item no 1,item no 2,item no 3,item no 4,item no 5,item no 6,item no 7,item no 8,item no 9,item no 10,item no 11,item no 12,item no 13,item no 14,item no 15,item no 16,item no 17,item no 18,item no 19,item no 20,item no 21,item no 22,item no 23,item no 24,item no 25,item no 26,item no 27,item no 28,item no 29,item no 30,item no 31,item no 32,item no 33,item no 34,item no 35,item no 36
Read moreTitle 1,title 2,title 3,title 4,title 5,title 6,title 7,title 8,title 9,title 10,title 11,title 12,title 13,title 14,title 15,title 16,title 17,title 18,title 19,title 20,title 21,title 22,title 23,title 24,title 25,title 26,title 27,title 28,title 29,title 30,title 31,title 32,title 33,title 34,title 35,title 36,title 37,title 38,title 39,title 40,title 41,title 42,title 43,title 44,title 45,title 46,title 47,title 48,title 49,title 50,title 51,title 52,title 53,title 54,title 55,title 56
Title 1,title 2,title 3,title 4,title 5,title 6,title 7,title 8,title 9,title 10,title 11,title 12,title 13,title 14,title 15,title 16,title 17,title 18,title 19,title 20,title 21,title 22,title 23,title 24,title 25,title 26,title 27,title 28,title 29,title 30,title 31,title 32,title 33,title 34,title 35,title 36,title 37,title 38,title 39,title 40,title 41,title 42,title 43,title 44,title 45,title 46,title 47,title 48,title 49,title 50,title 51,title 52,title 53,title 54,title 55,title 56
Read moreof your Industry type