Tender Details
Particulars | Details |
---|---|
Title |
Prj 221/23 24 Dismantling Of Kambil Public Water Tank And Construction Of Protection Wall
|
Description |
Oh Rcc Water Tank Demolition
|
Organisation | Government of Kerala |
Tender Id | 2023_LSGD_622388_1 |
Reference Number |
T3-23-221-KAMBIL-WATER TANK |
Tender Fee | 555 |
EMD | 3423 |
Tender Value | |
Place | OFFICE OF THE ASSISTANT ENGINEER, LID AND EW SECTI |
Link | https://etenders.kerala.gov.in |
Start Date | November 16, 2023 14:30 |
End Date |
24/11/2023 ( Expired 564 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of rrm protection wall at new tower no.: 04
Construction of rrm protection wall at new tower no.: 04 of 132 kv haflong-jiribam tl under powergrid haflong substation as per boq and instruction of engineer-in-charge
Read moreConstruction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31dat fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31 d at fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Read moreConstruction of lhs and its approaches in lieu of level crossing no.c-23/t-2 at km 221.050 on nh-65 (new nh-152) near siwani town in the state of haryana reinvited
Construction of lhs and its approaches in lieu of level crossing no.c-23/t-2 at km 221.050 on nh-65 (new
 nh-152) near siwani town in the state of haryana
Read moreRain water harvesting work in different areas of ward 24 with labour and material at site morar file no. 191/25x9/1
Rain water harvesting work in different areas of ward 24 with labour and material at site morar file no. 191/25x9/1
Read moreConstruction of boundary wall and allied infrastructure at harishchandrapuram in nw4 on epc mode schedulea
Construction of boundary wall and allied infrastructure at harishchandrapuram in nw4 on epc mode schedulea
Read moreConstruction of buttress wall towards eastern side drain slope of 994 mb bench 50 meter and 30 meter length dep 11c biom kirandul complex
Construction of buttress wall towards eastern side drain slope of 994 mb bench 50 meter and 30 meter length dep 11c biom kirandul complex
Read moreConstruction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Read moreConstruction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Read moreClearing of water way and construction of river training wall with associated structures in bahada nalla near haripur
Dredging works, construction of river training walls and groynes
Read moreConstruction of sgr hall, fire wall, store room, turfing and security fencing at 33/11 kv substation-civil line, district- prayagraj
Construction of sgr hall, fire wall, store room,turfing and security fencing at 33/11 kv substation-civil line, district- prayagraj
Read moreof your Industry type