Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Shifting Of Existing 11 Kv Line With Dp Constructed On The Earthen Embankment Of Athagarh Branch Canal At Rd 5.810 Km In Village Khuntakata Near Primary School Under Athagarh Block In The District Of Cuttack
|
| Description |
Electrical Work
|
| Organisation | CE-BM,B Right Basin,Dhenkanal | State Govt. and UT |
| Tender Id | 2025_CEBMD_112871_1 |
|
Reference Number |
SERRCD-V-01/2025-26 |
| Tender Fee | 4000 |
| EMD | 5600 |
| Tender Value | - |
| Place | Khuntakata, Athagarh |
| Link |
View Original Tender Notice
https://tendersodisha.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=537908 |
| Start Date | April 29, 2025 15:30 |
| End Date |
Expired
08/05/2025
Expired 522 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Providing of 132kv seetharambagh supply to 33/11kv nampally ss by laying of 1.8km of 33kv 3x400sq.mm xlpe ug cable (single run) from proposed dp structure at seetharampet operation section office to 33/11kv nampally ss (by utilizing double run 33kv cable sanctioned up to 33/11kv proposed goshamahal ss from 132kv seetharambagh ss in y-2025-12-01-03-01-002 i.e., shifting of 33/11kv goshamahal ss and connected lines) there by providing 132kv seetharambagh ss supply to 33/11kv nampally ss pertaining
Providing of 132kv seetharambagh supply to 33/11kv nampally ss by laying of 1.8km of 33kv 3x400sq.mm xlpe ug cable (single run) from proposed dp structure at seetharampet operation section office to 33/11kv nampally ss (by utilizing double run 33kv cable sanctioned up to 33/11kv proposed goshamahal ss from 132kv seetharambagh ss in y-2025-12-01-03-01-002 i.e., shifting of 33/11kv goshamahal ss and connected lines) there by providing 132kv seetharambagh ss supply to 33/11kv nampally ss pertaining to lines osmania section of lines asifnagar sub division in mehdipatnam operation division and work executed by the master plan sd-vi sub-division of mp-1 division of hyderabad master plan circle under t and d improvements to original works.
Read moreShifting of existing 11kv line with dp constructed on the earthen embankment of athagarh branch canal at rd 5.810km in village khuntakata near primary school under athagarh block in the district of cuttack.
Electrical work
Read moreShifting of existing 11kv line with dp constructed on the earthen embankment of athagarh branch canal at rd 5.810km in village khuntakata near primary school under athagarh block in the district of cuttack
Electrical works
Read moreConstruction of 11kv o/h line for ipd and opd building of sub-divisional hospital located at athagarh under athagarh no-1 electrical section of athagarh nac in the district of cuttack
Construction of 11kv o/h line for ipd and opd building of sub-divisional hospital located at athagarh under athagarh no-1 electrical section of athagarh nac in the district of cuttack
Read moreUpgradation of 66 kv substation changanacherry- shifting of 11kv dp structure.
Upgradation of 66 kv substation changanacherry- shifting of 11kv dp structure.
Read moreConstruction of 11kv ht cable trench and shifting of electrical 11kv ht tapping point from dipole dp structure to lbs
Construction of 11kv ht cable trench and shifting of electrical 11kv ht tapping point from dipole dp structure to lbs
Read moreShifting of 11kv oh line of 0.280km due to construction of internal approach road at choudwar ie, cuttack.
Shifting of 11kv oh line of 0.280km due to construction of internal approach road at choudwar ie, cuttack.
Read moreShifting of 11kv, lt line, dp structure at thokar chourya to ayad raod due to road wideing. 5907
Shifting of 11kv, lt line, dp structure at thokar chourya to ayad raod due to road wideing. 5907
Read moreShifting and construction of lines and sub-station at different location in between ch.0/000 km to 9/000 km of athagarh- subarnapur road in the district of cuttack
Shifting and construction of lines and sub-station at different location in between ch.0/000 km to 9/000 km of athagarh- subarnapur road in the district of cuttack
Read moreShifting and construction of lines and sub-station in between ch.0/000 km to 9/000 km due to widening and strengthening of athagarh- subarnapur road in the district of cuttack.
Shifting and construction of lines and sub-station in between ch.0/000 km to 9/000 km due to widening and strengthening of athagarh- subarnapur road in the district of cuttack.
Read moreof your Industry type