Particulars | Details |
---|---|
Title |
Irqp, Repair Work Of Remaining Part Of Nh 80 From Ch. 260.000 To Ch. 283.000 (Total Length 23.000 Km) (Kelabari To Bevapur) Under National Highway Division Deoghar For The Year 2023 24.
|
Description |
Irqp, Repair Work Of Remaining Part Of Nh 80 From Ch. 260.000 To Ch. 283.000 (Total Length 23.000 Km) (Kelabari To Bevapur) Under National Highway Division Deoghar For The Year 2023 24.
|
Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
Tender Id | 2024_MoRTH_794318_1 |
Reference Number |
NH/DEOGHAR/SBD/04/2023-24 |
Tender Fee | 11800 |
EMD | 16.34 Lakh |
Tender Value | |
Place | SAHIBGANJ |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=834867 |
Start Date | February 07, 2024 22:40 |
End Date |
04/03/2024 ( Expired 440 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreRehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km
Rehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km
Read moreDevelopment of 4-lane access controlled gf regional expressway on northern side of hyderabad from islampur village (design ch.59.000) to pragnapur village (design ch.82.000) length of 23.000 km in telangana under nh(o) on epc mode (package-iii)
Development of 4-lane access controlled gf regional expressway on northern side of hyderabad from islampur village (design ch.59.000) to pragnapur village (design ch.82.000) length of 23.000 km in telangana under nh(o) on epc mode (package-iii)
Read moreDevelopment of 4-lane access controlled gf regional expressway on northern side of hyderabad from rayagiri village (design ch.125.000) to tangad palle village (design ch. 160.000) length of 35.000 km in telangana under nh(o) on epc mode (package-v)
Development of 4-lane access controlled gf regional expressway on northern side of hyderabad from rayagiri village (design ch.125.000) to tangad palle village (design ch. 160.000) length of 35.000 km in telangana under nh(o) on epc mode (package-v)
Read moreSitc and operation and maintenance of advanced traffic management system (atms) on national highway 92, 730b, 730c, and 731k from etawah to pilibhit (length 240.726 km.)in the state of up (gnhcp) with loan assistance of world bank on epc mode
Sitc and operation and maintenance of advanced traffic management system (atms) on national highway 92, 730b, 730c, and 731k from etawah to pilibhit (length 240.726 km.)in the state of up (gnhcp) with loan assistance of world bank on epc mode
Read moreMaintenance of road from ch.15.00 to 61.500 of nh 334a in total length of 46.500 km under performance based maintenance contract (pbmc) for the financial year 2024-25 in the state of uttarakhand
Maintenance of road from ch.15.00 to 61.500 of nh 334a in total length of 46.500 km under performance based maintenance contract (pbmc) for the financial year 2024-25 in the state of uttarakhand
Read moreExecuting work of 66 kv line for stringing of 2nd circuit of 66 kv line from 66 kv substation amloh to 66 kv substation bhadson planning no 80 cz 2023 24 annexure e rdss work
Executing work of 66 kv line for stringing of 2nd circuit of 66 kv line from 66 kv substation amloh to 66 kv substation bhadson planning no 80 cz 2023 24 annexure e rdss work
Read moreWidening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Read moreStrengthening of tumsar to bhandara section of nh-543k from km 82.00 to km 112.00 (excluding section from km 108.00 to 110.00) on epc mode in the state of maharashtra. total length 28.00 km
Strengthening of tumsar to bhandara section of nh-543k from km 82.00 to km 112.00 (excluding section from km 108.00 to 110.00) on epc mode in the state of maharashtra. total length 28.00 km
Read moreDevelop. of 4lane ac sirhind sehna sec of nh205ag from dak expressway ne5 near malerkotla ch79.200 to junc with lb highway nh754 ad near vill sehna ch.134.290 tl 55.09 km pkgii part of mohali barnala ic in punjab under nh(o) on ham
Develop. of 4lane ac sirhind sehna sec of nh205ag from dak expressway ne5 near malerkotla ch79.200 to junc with lb highway nh754 ad near vill sehna ch.134.290 tl 55.09 km pkgii part of mohali barnala ic in punjab under nh(o) on ham
Read moreof your Industry type