Tender Details
Particulars | Details |
---|---|
Title |
Annual Plan Irinjalakuda Municipality(2024 25) Pro. No 668/25 Road Improvement Works And Drain Works To Korimbussery Krishnakumar Road North Side Of Mariyamman Kovil Road Bethsytha Road And Bylanes,Side Protection Of Kanjirathodu Perinthodu Division
|
Description |
Annual Plan Irinjalakuda Municipality(2024 25) Pro. No 668/25 Road Improvement Works And Drain Works To Korimbussery Krishnakumar Road North Side Of Mariyamman Kovil Road Bethsytha Road And Bylanes,Side Protection Of Kanjirathodu Perinthodu Division
|
Organisation | Local Self Government Department | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 2760 |
EMD | 32669 |
Tender Value | |
Place | IRINJALAKUDA |
Link |
AAAAAAAAAA Login to view |
Start Date | May 23, 2025 23:30 |
End Date |
31/05/2025 ( 7 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Widening and improvement of shangshak-tengnoupal road pkg-3 (from km. 78.250 to km. 126.250) of nh-102a into 2 lane with hard shoulder in the state of manipur under annual plan 2024-25 through epc mode (job no. 102a/mn/2024-25/42)
Widening and improvement of shangshak-tengnoupal road pkg-3 (from km. 78.250 to km. 126.250) of nh-102a into 2 lane with hard shoulder in the state of manipur under annual plan 2024-25 through epc mode (job no. 102a/mn/2024-25/42)
Read morePeriodical renewal of pmgsy handed over road from mandwi to chachu bazaar (t01) (l 9.533 km) (package no. tr-01 199 u) under the performance incentive of pmgsy under mandwi pwd(r and b) sub division, mandwi block during the year 2024-25
Periodical renewal of pmgsy handed over road from mandwi to chachu bazaar (t01) (l 9.533 km) (package no. tr-01 199 u) under the performance incentive of pmgsy under mandwi pwd(r and b) sub division, mandwi block during the year 2024-25
Read moreOne time improvement of shillong-jowai road including construction of pucca side drain with footpath from km 54.200 to 69.200 km length 15.00 km in the state of meghalaya . job no. 44-mg-2024-25-178
One time improvement of shillong-jowai road including construction of pucca side drain with footpath from km 54.200 to 69.200 km length 15.00 km in the state of meghalaya . job no. 44-mg-2024-25-178
Read moreBalance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Read moreRepair and rehabilitation of br no. 316/1, 331/1, 332/1, 338/1, 341/1, 354/2, 361/2 on nh 15 under annual plan for the year 2024-25 under pwd under nagaon nh division, nagaon in the state of assam on epc mode.(job no br/15/as/2024-25/284).
Repair and rehabilitation of br no. 316/1, 331/1, 332/1, 338/1, 341/1, 354/2, 361/2 on nh 15 under annual plan for the year 2024-25 under pwd under nagaon nh division, nagaon in the state of assam on epc mode.( job no br/15/as/2024-25/284).
Read moreAam kho divider phoolbagh squre to gda divider r.r. tower divider, bejatall road side open places and infront of manas bhavan road side hedge planteation/greenry with 03 month maintenance file no. 25/25x13/1
Aam kho divider phoolbagh squre to gda divider r.r. tower divider, bejatall road side open places and infront of manas bhavan road side hedge planteation/greenry with 03 month maintenance file no. 25/25x13/1
Read moreImprovement of road portion from post office chowmuhani to netaji chowmuhani under central iii sub division pwd(randb) sh construction of rcc cover drain along with shoulder and footpath on rhs of the road from post office chowmuhani to netaji chowmu
Improvement of road portion from post office chowmuhani to netaji chowmuhani under central iii sub division pwd(randb) sh construction of rcc cover drain along with shoulder and footpath on rhs of the road from post office chowmuhani to netaji chowmu
Read moreImprovement of road portion from post office chowmuhani to netaji chowmuhani under central iii sub division pwd(randb) sh construction of rcc cover drain along with shoulder and footpath on lhs of the road from post office chowmuhani to netaji chowmu
Improvement of road portion from post office chowmuhani to netaji chowmuhani under central iii sub division pwd(randb) sh construction of rcc cover drain along with shoulder and footpath on lhs of the road from post office chowmuhani to netaji chowmu
Read moreCleaning of kachcha/pakka drain from the concrete road in ash bund (west side) to sump no. 02 (north side) in ash bund of stage-i at sstpp, mppgcl, dongalia distt. khandwa.
Cleaning of kachcha/pakka drain from the concrete road in ash bund (west side) to sump no. 02 (north side) in ash bund of stage-i at sstpp, mppgcl, dongalia distt. khandwa.
Read moreUrgent protection to hill side slope between km.532/300 to km 535/600 on nh-66 in the state of goa under nh(o) annual plan 2024-25.
Urgent protection to hill side slope between km.532/300 to km 535/600 on nh-66 in the state of goa under nh(o) annual plan 2024-25.
Read moreof your Industry type