Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of 1st Floor Hall And Chain Linking Fencing In Front Area At City Centre Library, City Centre, Within Dmc Area.
|
| Description |
Civil Works
|
| Organisation | Government of West Bengal |
| Tender Id | 2023_ADDA_568672_1 |
|
Reference Number |
ADDA/DGP/ED/N-45/2023-24(SL-1) |
| Tender Fee | 0 |
| EMD | 82502 |
| Tender Value | - |
| Place | 1ST ADMINISTRATIVE BUILDING,CITY CENTRE,DURGAPUR |
| Link |
View Original Tender Notice
https://wbtenders.gov.in |
| Start Date | September 15, 2023 15:35 |
| End Date |
Expired
29/09/2023
Expired 1112 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Chain fencing work on the roadside in front of gaurihar temple in view of diwali fair 2026.
Chain fencing work on the roadside in front of gaurihar temple in view of diwali fair 2026.
Read moreThe work of fencing distribution transformers of 250 kva and above capacity under the additional business plan 2026-27 within electricity distribution division rasra / ballia city / bansdih / bairia.
The work of fencing distribution transformers of 250 kva and above capacity under the additional business plan 2026-27 within electricity distribution division rasra / ballia city / bansdih / bairia.
Read moreWork of interlocking tiles on the side tracks on both sides from the community centre in front of holy child school to near the tehsil under the city zone.
Work of interlocking tiles on the side tracks on both sides from the community centre in front of holy child school to near the tehsil under the city zone.
Read moreConstruction of control room, chain link mesh fencing, yard leveling and metaling, drilling of tubewell and other civil work for new 33/11 kv s/s at sector-e, sanwer road, under north division, city circle indore.
Construction of control room, chain link mesh fencing, yard leveling and metaling, drilling of tubewell and other civil work for new 33/11 kv s/s at sector-e, sanwer road, under north division, city circle indore.
Read moreProvn of chain link fencing and chequered tiles in front of bldg no smb-01 and fencing to bldg no p-176 (qg) with store room near main office and spl repair to floor tiles and false ceiling at bldg no smb-01 at new mil stn under ge gangtok
Provn of chain link fencing and chequered tiles in front of bldg no smb-01 and fencing to bldg no p-176 (qg) with store room near main office and spl repair to floor tiles and false ceiling at bldg no smb-01 at new mil stn under ge gangtok
Read moreProvn of reception area and waiting room near bldg no p/769, provn of parking shed in front of office complex of 2 sikh li and spl repair to chain link fencing at sports complex near cariappa enclave at pms
All as per boq
Read moreAssy fuel-water separator part no 252709120254,kit universal joint part no 217141000107,oil filter element part no 252518130164,assy water pupm bs 3 by 4 part no 252520100180,v belt cogged 995mm part no 252520156344,engine mounting pad front part no 257624100101,engine mounting pad rear part no 257624200118,clutch master cylinder 25.4 part no 261829100107,power stearing pump part no 261846600101,clutch disc 352dia part no 275225200106,clutch cover 352 dia part no 275225400105,assy cross bs 1 2 3 4 part no 280941400101,clutch master cylinder 25.4 part no 503029100164,accelerator module part no 550730100102,clutch disc 352dia part no 581225200101,clutch cover 352 bs 3 4 part no 581225400101,kit brake liner front part no 885442011618,kit brake liner rear part no 885442021618,centre bearing part no 275041304303,leaf spring 1st part no 263232100131,second leaf part no 263232107148,leaf spring 2nd part no 263232407173,set of 2516 air filter catridge part no 885409052516
Assy fuel-water separator part no 252709120254,kit universal joint part no 217141000107,oil filter element part no 252518130164,assy water pupm bs 3 by 4 part no 252520100180,v belt cogged 995mm part no 252520156344,engine mounting pad front part no 257624100101,engine mounting pad rear part no 257624200118,clutch master cylinder 25.4 part no 261829100107,power stearing pump part no 261846600101,clutch disc 352dia part no 275225200106,clutch cover 352 dia part no 275225400105,assy cross bs 1 2 3 4 part no 280941400101,clutch master cylinder 25.4 part no 503029100164,accelerator module part no 550730100102,clutch disc 352dia part no 581225200101,clutch cover 352 bs 3 4 part no 581225400101,kit brake liner front part no 885442011618,kit brake liner rear part no 885442021618,centre bearing part no 275041304303,leaf spring 1st part no 263232100131,second leaf part no 263232107148,leaf spring 2nd part no 263232407173,set of 2516 air filter catridge part no 885409052516
Read moreApplying 2 coats of bone white approved colour cem to gopuras sikharsa over base coat after moss lichen removal using ammonia and coir brush including all material and labor,erection and removal of cip lock double scaffolding with 40mm ms tubes challis clamps bracing and safety features for gopura painting works,providing 1st class teack wood panelled door finely carved to match temple design including aldrops hinges towe bolts fixture and complete installtion charges,scaping rust with emery paper and applying two coats of synthetic enamel paint over a base coat on existing grill fencing and gates including material and labor,removal of old damaged precast roof slabs at store room disposal debris within 2km and scaffolding erection removal as directed by site in charge,providing reinforeced cement concrete slab over store room including required centering shuttering and finishing excluding reinforcement cost,supplying straighening cutting bending placing and binding mild steel medium tensile steel bars for pr
Applying 2 coats of bone white approved colour cem to gopuras sikharsa over base coat after moss lichen removal using ammonia and coir brush including all material and labor,erection and removal of cip lock double scaffolding with 40mm ms tubes challis clamps bracing and safety features for gopura painting works,providing 1st class teack wood panelled door finely carved to match temple design including aldrops hinges towe bolts fixture and complete installtion charges,scaping rust with emery paper and applying two coats of synthetic enamel paint over a base coat on existing grill fencing and gates including material and labor,removal of old damaged precast roof slabs at store room disposal debris within 2km and scaffolding erection removal as directed by site in charge,providing reinforeced cement concrete slab over store room including required centering shuttering and finishing excluding reinforcement cost,supplying straighening cutting bending placing and binding mild steel medium tensile steel bars for pr
Read moreof your Industry type