Tender Details
Particulars | Details |
---|---|
Title |
Restoration Of Damaged Carriageway In Selected Stretches Clearing Jungle Vegetation Removal Of Earth From Choked Drains Clearing The Blocked Vents Of C Ds And Shoulder Filling Of Nh.73 (Spur Road) Periyashanthi Dharmasthala Ujire Section In The State
|
Description |
Restoration Of Damaged Carriageway In Selected Stretches Clearing Jungle Vegetation Removal Of Earth From Choked Drains Clearing The Blocked Vents Of C Ds And Shoulder Filling Of Nh.73 (Spur Road) Periyashanthi Dharmasthala Ujire Section In The State
|
Organisation | Central Public Procurement Portal 1 |
Tender Id | 2023_MoRTH_783684_1 |
Reference Number |
EE/NHD/MNG/AE1/2023-24/NIT03 |
Tender Fee | 5900 |
EMD | 2.98 Lakh |
Tender Value | |
Place | Office of the Executive Engineer NH Division Urva |
Link | https://eprocure.gov.in |
Start Date | December 04, 2023 21:30 |
End Date |
11/12/2023 ( Expired 496 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Filling of pot holes jungle clearance rectification of damaged shoulders removal of unserviceable soil longitudinal unlined drain work from km 199 250 to km 211 250 of nh 275 bantwala bengaluru section
Filling of pot holes jungle clearance rectification of damaged shoulders removal of unserviceable soil longitudinal unlined drain work from km 199 250 to km 211 250 of nh 275 bantwala bengaluru section
Read moreFilling of pot holes jungle clearance rectification of damaged shoulders removal of unserviceable soil longitudinal unlined drain work of nh 275 pertaining to mysuru sub division bantwala bengaluru section
Filling of pot holes jungle clearance rectification of damaged shoulders removal of unserviceable soil longitudinal unlined drain work of nh 275 pertaining to mysuru sub division bantwala bengaluru section
Read moreProviding earthen shoulders, shoulder drain, clearing road side jungle and de-silting of road side drain from km 86.200 to 99.200 (selected length) of nh-73 (charmadi ghat section) mangaluru tumkur section and engaging mobile gang.
Providing earthen shoulders, shoulder drain, clearing road side jungle and de-silting of road side drain from km 86.200 to 99.200 (selected length) of nh-73 (charmadi ghat section) mangaluru tumkur section and engaging mobile gang.
Read moreWidening reconstruction and upgradation to 2 lane with paved shoulder four lane configuration for the work of sautada to shirapur section of nh 561 from design km 86.300 to 125.589 in the state of maharashtra on epc mode. design length 39.289 km
Widening reconstruction and upgradation to 2 lane with paved shoulder four lane configuration for the work of sautada to shirapur section of nh 561 from design km 86.300 to 125.589 in the state of maharashtra on epc mode. design length 39.289 km
Read more2nd call construction of rcc drains at various villages towns location from km 28 000 to km 67 600 on dhad bhokardan road section of nh 753m in the state of maharashtra on epc mode
2nd call construction of rcc drains at various villages towns location from km 28 000 to km 67 600 on dhad bhokardan road section of nh 753m in the state of maharashtra on epc mode
Read moreGeneral premonsoon 2024 2025 clearing of jungle and removal of rubbish including maintenance of shoulder etc tn taliparamba section
General premonsoon 2024 2025 clearing&#x0d of jungle and removal of rubbish including&#x0d maintenance of shoulder and repairs to water&#x0d cuts along either sides of paved surface in taliparamba section
Read moreWork under fdr for repair of damaged shoulder and pot hole repair of km 19 to km 48/6 on nh-56 ambua dahod road in the state of madhya pradesh
Work under fdr for repair of damaged shoulder and pot hole repair of km 19 to km 48/6 on nh-56 ambua dahod road in the state of madhya pradesh
Read moreMalda - manikchak - ratua - samsi road (sh-10) restoration work of bituminous carriageway and sholder portion due to damaged by phe dte., during laying of pipe line under malda division, pwd in the district of malda, during the year 2024-25.
Malda - manikchak - ratua - samsi road (sh-10) restoration work of bituminous carriageway and sholder portion due to damaged by phe dte., during laying of pipe line under malda division, pwd in the district of malda, during the year 2024-25.
Read moreMtc. of road from nh-44 (old) to srinibashpara (l-1.15 km) during the year 2023-24/ sh -patch metalling, grouting, re-carpeting, seal coating, clearing of land slide, restoration of damaged road formation, bamboo palasiding, constn. of unlined sur
Mtc. of road from nh-44 (old) to srinibashpara (l-1.15 km) during the year 2023-24/ sh -patch metalling, grouting, re-carpeting, seal coating, clearing of land slide, restoration of damaged road formation, bamboo palasiding, constn. of unlined sur
Read moreBalance work for completion of internal drains with one number pipe culvert and incomplete cc road retaining wall and earth filling on both approaches of completed culvert in the rr colony jamada for construction of additional spillway hirakud dam
Balance work for completion of internal drains with one number pipe culvert and incomplete cc road retaining wall and earth filling on both approaches of completed culvert in the rr colony jamada for construction of additional spillway hirakud dam
Read moreof your Industry type