Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mrl13 Chamtha Bajitpur Old Bridge To Chiraiyan Tok Construction Of Box Bridge At Ch 3 400 Km
|
| Description |
Mrl13 Chamtha Bajitpur Old Bridge To Chiraiyan Tok Construction Of Box Bridge At Ch 3 400 Km
|
| Organisation | National Rural Roads Development Agency (NRRDA) | Central Govt. Ministry/Department |
| Tender Id | 2023_RWD_129946_1 |
|
Reference Number |
BR04P3R40 |
| Tender Fee | 10000 |
| EMD | 3.23 Lakh |
| Tender Value | - |
| Place | TEGHARA |
| Link |
View Original Tender Notice
https://pmgsytendersbih.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=205130 |
| Start Date | January 05, 2024 20:30 |
| End Date |
Expired
11/01/2024
Expired 1011 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Rectification of deck slab of old ignp bridge ch 157.838 along with strengthening of approaches on of bikaner suratgarh section of nh-62 under special repair annual plan 2026-27
Rectification of deck slab of old ignp bridge ch 157.838 along with strengthening of approaches on of bikaner suratgarh section of nh-62 under special repair annual plan 2026-27
Read moreCrif 2025-26 (construction of high level major bridge across local khadi on mandvi sherulla road ch-14/0 to 28/500 (w.s.15/400 to 15/600) (mdr) in dist.tapi in state of gujarat)
Construction of high level major bridge across local khadi on mandvi sherulla road ch-14/0 to 28/500 (w.s.15/400 to 15/600) (mdr) in dist. tapi in state of gujarat (crif 2025-26)
Read moreArmored fiber cable with laying,media converter,power point,splicing,fiber patch cord,lan patch cord,liu loaded,fiber box,wall mount rack,high end pc with vms software,display tv 75 inch,fiber poe switch,nvr 08 ch along with 2tb hard disc,ip bullet camera,lan cable,installation of new camera,upgradation of old system to new system up,warranty and amc for 3 years
Armored fiber cable with laying,media converter,power point,splicing,fiber patch cord,lan patch cord,liu loaded,fiber box,wall mount rack,high end pc with vms software,display tv 75 inch,fiber poe switch,nvr 08 ch along with 2tb hard disc,ip bullet camera,lan cable,installation of new camera,upgradation of old system to new system up,warranty and amc for 3 years
Read moreMrl13-chamtha bajitpur old bridge to chiraiyan tok
Mrl13-chamtha bajitpur old bridge to chiraiyan tok
Read moreMrl13-raniganj to nongarhaconstruction of rcc hl bridge at ch. 2870
Mrl13-raniganj to nongarhaconstruction of rcc hl bridge at ch. 2870
Read moreMrl13-raniganj to nongarhaconstruction of h.l rcc bridge at ch. 3220
Mrl13-raniganj to nongarhaconstruction of h.l rcc bridge at ch. 3220
Read moreMrl13-raniganj to nongarhaconstruction of h.l rcc bridge at ch. 3350
Mrl13-raniganj to nongarhaconstruction of h.l rcc bridge at ch. 3350
Read moreMrl03-chechiyari brize to bisunpur construction of box bridge at ch 2 400 km
Mrl03-chechiyari brize to bisunpur construction of box bridge at ch 2 400 km
Read moreMrl13-panapur to pipraha via nh-28 and yogendra ram ke gharrcc bridge at mrl13-panapur to pipraha via nh-28 and yogendra ram ke ghar at ch-7.532km
Mrl13-panapur to pipraha via nh-28 and yogendra ram ke gharrcc bridge at mrl13-panapur to pipraha via nh-28 and yogendra ram ke ghar at ch-7.532km
Read moreMrl13-pohaddi rcd road to malaul brahm patti construction of rcc box bridge at ch 8 130 k.m in pohaddi rcd road to malaul brahm patti via padri r
Mrl13-pohaddi rcd road to malaul brahm patti construction of rcc box bridge at ch 8 130 k.m in pohaddi rcd road to malaul brahm patti via padri r
Read moreof your Industry type