Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Imp. Of Interlocking Road And Nali From Shukla Bhojnalay Infront Of H.No 261 Z 1 To H.No 305 Z 1 In Ward 77 Zone 03
|
Description |
Imp. Of Interlocking Road And Nali From Shukla Bhojnalay Infront Of H.No 261 Z 1 To H.No 305 Z 1 In Ward 77 Zone 03
|
Organisation | Kanpur Municipal Corporation, Kanpur, UP | State Govt. and UT |
Tender Id | 2025_NNKAN_1048405_1 |
Reference Number |
352/A.A.3/24-25 |
Tender Fee | 1180 |
EMD | 97069 |
Tender Value | |
Place | Imp. Of interlocking road and nali from Shukla Bh |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1904967 |
Start Date | June 13, 2025 22:30 |
End Date |
21/06/2025 ( Expired 30 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Strengthening and major maintenance of muzaffarpur darbhanga purnea section (br-04 br-03 br-02 and br- 01) of nh-27 from km.156.456 to km.285.007 in the state of bihar on single percentage rate contract mode (2nd call)
Strengthening and major maintenance of muzaffarpur darbhanga purnea section (br-04 br-03 br-02 and br- 01) of nh-27 from km.156.456 to km.285.007 in the state of bihar on single percentage rate contract mode (2nd call)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreRepairs to existing road under risk and cost to four lane of karad tasgaon (from km 0/000 to km 58/830) section of nh 266 on epc mode in the state of maharashtra. (regarding panel replacement)
Repairs to existing road under risk and cost to four lane of karad tasgaon (from km 0/000 to km 58/830) section of nh 266 on epc mode in the state of maharashtra. (regarding panel replacement)
Read moreUp-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, from design km 237.600 to km 292.750 (design length-55.150 chanderi link bypass) in the state of madhya pradesh
Up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, from design km 237.600 to km 292.750 (design length-55.150 chanderi link bypass) in the state of madhya pradesh
Read moreConstruction of fence and road along fence (15.00 km) and approach roads (33.00 km) along indo myanmar border from bp 164 to bp 166 in tirap and changlang district of arunachal pradesh state on epc mode
Construction of fence and road along fence (15.00 km) and approach roads (33.00 km) along indo myanmar border from bp 164 to bp 166 in tirap and changlang district of arunachal pradesh state on epc mode
Read moreConstruction of road from km 0.00 to km 27.430 (package-1) of bile- migging section (km 0.00 at bile) of nh-913 (frontier highway) to intermediate lane on epc mode in the state of arunachal pradesh
Construction of road from km 0.00 to km 27.430 (package-1) of bile-
 migging section (km 0.00 at bile) of nh-913 (frontier highway) to intermediate
 lane on epc mode in the state of arunachal pradesh
Read moreConstruction of drains on both sides of the road from lane no. 03 to anees house under sanjay gandhi ward.
Construction of drains on both sides of the road from lane no. 03 to &#x0d anees house under sanjay gandhi ward.&#x0d
Read moreFabrication and installation of mild steel median safety grills in reach-6 line of elevated section from gottigere (kalena agrahara) to swagath road cross (tavarekere station) chainage- 0.00m to 7501.00 m of bangalore metro rail project, phase-2
Fabrication and installation of mild steel 
 median safety grills in reach-6 line of elevated section from gottigere (kalena agrahara) to swagath road 
 cross (tavarekere station) chainage- 0.00m to 7501.00 m of bangalore metro rail project, phase-2
Read moreWidening a upgradation of road from 2 lane with ps to 4 lane with ps for rectification of blackspot id no. pb 03 186 at location km. 154.310 rureke kalan on nh703 in the state of punjab job no rureke kalan on nh 703 punjab 2024 25 rse 33 including ut
Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of blackspot id no. pb 03 186 at location km. 154.310 rureke kalan on nh703 in the state of punjab job no rureke kalan on nh 703 punjab 2024 25 rse 33 including
Read more(kayaklp yojana) construction work of c.c. road from nadariya ki mata to pipari dham zone no.21 ward no.52. file no.264/25x3/6.
(kayaklp yojana) construction work of c.c. road from nadariya ki mata to pipari dham zone no.21 ward no.52. file no.264/25x3/6.
Read moreof your Industry type