Tender Details

Particulars Details
Title
Perfomance Based Maintenance Contract For Rajgarh Pilani Upto Haryana Border Road Of Nh 709extn. From Chainage Km 3.650 To Km 58.325
Description
Perfomance Based Maintenance Contract For Rajgarh Pilani Upto Haryana Border Road Of Nh 709extn. From Chainage Km 3.650 To Km 58.325
Organisation Ministry of Road Transport and Highways | Central Govt. Ministry/Department
Tender Id 2024_MoRTH_829665_1
Reference
Number
NIT No. 10/2024-25 SE NH BIKANER
Tender Fee 10000
EMD 45.74 Lakh
Tender Value -
Place rajgarh
Link
View Original Tender Notice

https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=871822

Start Date October 09, 2024 14:30
End Date
Expired 03/12/2024

Expired 680 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Risk and cost work for work of sarvardevla to pal (mp/mh border) road section of nh-347c from design chainage 81.600 km to 137.400 km (total length 55.80 km) in the state of madhya pradesh

Risk and cost work for work of sarvardevla to pal (mp/mh border) road section of nh-347c from design chainage 81.600 km to 137.400 km (total length 55.80 km) in the state of madhya pradesh

Read more
Stmc work on nh -458 (raipur jassakheda section) between chainage 3.000 to 25.650 in the state of rajasthan

Stmc work on nh -458 (raipur jassakheda section) between chainage 3.000 to 25.650 in the state of rajasthan

Read more
Cs for preparation of feasibility study and detailed project report (dpr) of existing 02 lane with paved shoulder into 4 lane with paved shoulder of umariya anuppur (upto mp/chhattisgarh border) (length 160 km approx.) section of nh 43 in mp

Cs for preparation of feasibility study and detailed project report (dpr) of existing 02 lane with paved shoulder into 4 lane with paved shoulder of umariya anuppur (upto mp/chhattisgarh border) (length 160 km approx.) section of nh 43 in mp

Read more
Construction of 6-lane elevated corridor from maduravoyal junction (chainage km 13.965) chennai outer ring road (chainage km 22.100) including junction improvements at km. 22.368 of nh-48 (old nh4) in tamil nadu on hybrid annuity mode (project lengt

Construction of 6-lane elevated corridor from maduravoyal junction (chainage km 13.965) chennai outer ring road (chainage km 22.100) including junction improvements at km. 22.368 of nh-48 (old nh4) in tamil nadu on hybrid annuity mode (project lengt

Read more
Widening and strengthening of single and intermediate lane to 2 lane with paved shoulder from existing chainage (km 53.873 to km 59.700) design chainage (km 33.565 to km 38.943) (design length 5.378 km) on nh-507 in the state of uttarakhand

Widening and strengthening of single and intermediate lane to 2 lane with paved shoulder from existing chainage (km 53.873 to km 59.700) design chainage (km 33.565 to km 38.943) (design length 5.378 km) on nh-507 in the state of uttarakhand

Read more
One time improvement of nh-9 (rohtak road) from punjabi bagh underpass till tikri border in the state of delhi on epc mode

One time improvement of nh-9 (rohtak road) from punjabi bagh underpass till tikri border in the state of delhi on epc mode

Read more
Rehabilitation and upgradation of malkapur buldhana chikhli deulgaon raja jalna sambhaji nagar nh 753a upgradation of service road at vup at chainage 150.400 on jalna bypass

Rehabilitation and upgradation of malkapur buldhana chikhli deulgaon raja jalna sambhaji nagar nh 753a upgradation of service road at vup at chainage 150.400 on jalna bypass

Read more
Widening to 2 lane with paved shoulder from existing chainage 12.00 to 40.50 (badwala to lakhwar bend) (realignment from km 12.00 to 31.122) on nh-507

Widening to 2 lane with paved shoulder from existing chainage 12.00 to 40.50 (badwala to lakhwar bend) (realignment from km 12.00 to 31.122) on nh-507

Read more
Cs for preparation of feasibility report and dpr for upgradation to 4 l of shildag to parwa more sec from km 57.049 to km 79.147 of nh 139 (old nh 98) and jh/bihar border to chandwa sec from km 11.200 to km 117.200 of nh 22 (old nh 99) in jharkhand

Cs for preparation of feasibility report and dpr for upgradation to 4 l of shildag to parwa more sec from km 57.049 to km 79.147 of nh 139 (old nh 98) and jh/bihar border to chandwa sec from km 11.200 to km 117.200 of nh 22 (old nh 99) in jharkhand

Read more
Consultancy services of independent engineer services for widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode in the state of odisha

Consultancy services of independent engineer services for widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode in the state of odisha

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise