Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Perfomance Based Maintenance Contract For Rajgarh Pilani Upto Haryana Border Road Of Nh 709extn. From Chainage Km 3.650 To Km 58.325
|
| Description |
Perfomance Based Maintenance Contract For Rajgarh Pilani Upto Haryana Border Road Of Nh 709extn. From Chainage Km 3.650 To Km 58.325
|
| Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
| Tender Id | 2024_MoRTH_829665_1 |
|
Reference Number |
NIT No. 10/2024-25 SE NH BIKANER |
| Tender Fee | 10000 |
| EMD | 45.74 Lakh |
| Tender Value | - |
| Place | rajgarh |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=871822 |
| Start Date | October 09, 2024 14:30 |
| End Date |
Expired
03/12/2024
Expired 680 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Risk and cost work for work of sarvardevla to pal (mp/mh border) road section of nh-347c from design chainage 81.600 km to 137.400 km (total length 55.80 km) in the state of madhya pradesh
Risk and cost work for work of sarvardevla to pal (mp/mh border) road section of nh-347c from design chainage 81.600 km to 137.400 km (total length 55.80 km) in the state of madhya pradesh
Read moreStmc work on nh -458 (raipur jassakheda section) between chainage 3.000 to 25.650 in the state of rajasthan
Stmc work on nh -458 (raipur jassakheda section) between chainage 3.000 to 25.650 in the state of rajasthan
Read moreCs for preparation of feasibility study and detailed project report (dpr) of existing 02 lane with paved shoulder into 4 lane with paved shoulder of umariya anuppur (upto mp/chhattisgarh border) (length 160 km approx.) section of nh 43 in mp
Cs for preparation of feasibility study and detailed project report (dpr) of existing 02 lane with paved shoulder into 4 lane with paved shoulder of umariya anuppur (upto mp/chhattisgarh border) (length 160 km approx.) section of nh 43 in mp
Read moreConstruction of 6-lane elevated corridor from maduravoyal junction (chainage km 13.965) chennai outer ring road (chainage km 22.100) including junction improvements at km. 22.368 of nh-48 (old nh4) in tamil nadu on hybrid annuity mode (project lengt
Construction of 6-lane elevated corridor from maduravoyal junction (chainage km 13.965) chennai outer ring road (chainage km 22.100) including junction improvements at km. 22.368 of nh-48 (old nh4) in tamil nadu on hybrid annuity mode (project lengt
Read moreWidening and strengthening of single and intermediate lane to 2 lane with paved shoulder from existing chainage (km 53.873 to km 59.700) design chainage (km 33.565 to km 38.943) (design length 5.378 km) on nh-507 in the state of uttarakhand
Widening and strengthening of single and intermediate lane to 2 lane with paved shoulder from existing chainage (km 53.873 to km 59.700) design chainage (km 33.565 to km 38.943) (design length 5.378 km) on nh-507 in the state of uttarakhand
Read moreOne time improvement of nh-9 (rohtak road) from punjabi bagh underpass till tikri border in the state of delhi on epc mode
One time improvement of nh-9 (rohtak road) from punjabi bagh underpass till tikri border in the state of delhi on epc mode
Read moreRehabilitation and upgradation of malkapur buldhana chikhli deulgaon raja jalna sambhaji nagar nh 753a upgradation of service road at vup at chainage 150.400 on jalna bypass
Rehabilitation and upgradation of malkapur buldhana chikhli deulgaon raja jalna sambhaji nagar nh 753a upgradation of service road at vup at chainage 150.400 on jalna bypass
Read moreWidening to 2 lane with paved shoulder from existing chainage 12.00 to 40.50 (badwala to lakhwar bend) (realignment from km 12.00 to 31.122) on nh-507
Widening to 2 lane with paved shoulder from existing chainage 12.00 to 40.50 (badwala to lakhwar bend) (realignment from km 12.00 to 31.122) on nh-507
Read moreCs for preparation of feasibility report and dpr for upgradation to 4 l of shildag to parwa more sec from km 57.049 to km 79.147 of nh 139 (old nh 98) and jh/bihar border to chandwa sec from km 11.200 to km 117.200 of nh 22 (old nh 99) in jharkhand
Cs for preparation of feasibility report and dpr for upgradation to 4 l of shildag to parwa more sec from km 57.049 to km 79.147 of nh 139 (old nh 98) and jh/bihar border to chandwa sec from km 11.200 to km 117.200 of nh 22 (old nh 99) in jharkhand
Read moreConsultancy services of independent engineer services for widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode in the state of odisha
Consultancy services of independent engineer services for widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode in the state of odisha
Read moreof your Industry type