Tender Details

Particulars Details
Title
Replacement Of Air Conditioners And Water Coolers At Various Locations At S V Airport, Raipur
Description
Replacement Of Air Conditioners And Water Coolers At Various Locations At S V Airport, Raipur
Organisation Central Public Procurement Portal 2
Tender Id 2023_AAI_156967_1
Reference
Number
AAI/RPR/ENGG (E)/CW/AC/2023-24/E-NIT-01
Tender Fee 1120
EMD 39568
Tender Value -
Place S. V. Airport, Raipur
Link
View Original Tender Notice

https://etenders.gov.in

Start Date June 10, 2023 15:00
End Date
Expired 30/06/2023

Expired 1199 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Supply and installation of tower type split air conditioners with all necessary accessories - for utilisation at various locations of pjhes(revulapally(v), jogulamba gadwal (dist.)) and ljhes(atmakur(v),wanaparthy(dist.))

Supply and installation of tower type split air conditioners with all necessary accessories - for utilisation at various locations of pjhes(revulapally(v), jogulamba gadwal (dist.)) and ljhes(atmakur(v),wanaparthy(dist.))

Read more
Tggenco-cetd-div-ii- supply of consumable and spares for the air conditioners and water coolers available in cetd campus

Tggenco-cetd-div-ii- supply of consumable and spares for the air conditioners and water coolers available in cetd campus

Read more
Repair and maintenance of air conditioners (1.5 ton/2 ton) on amc and repairs of refrigerators and water coolers in bhupalpalli area for a period of two years. - reg.

Repair and maintenance of air conditioners (1.5 ton/2 ton) on amc and repairs of refrigerators and water coolers in bhupalpalli area for a period of two years. - reg.

Read more
Ktps-v vi stages-civil -o m-ii - clearing of thick jungle, vegetation and bushes along the railway track at certain locations in marshalling yard and gajulagudem area in ktps v vi stages and ktps-v vi stages- civil- o m-ii- clearing of residual coal fallen from bobr wagons along the railway track at certain locations in marshalling yard of ktps v vi stages

Ktps-v vi stages-civil -o m-ii - clearing of thick jungle, vegetation and bushes along the railway track at certain locations in marshalling yard and gajulagudem area in ktps v vi stages and ktps-v vi stages- civil- o m-ii- clearing of residual coal fallen from bobr wagons along the railway track at certain locations in marshalling yard of ktps v vi stages

Read more
Replacement of damaged slew bearing with new one at trf make stacker cum reclaimer machine in coal handling plant of ktps-v and vi stages.

Replacement of damaged slew bearing with new one at trf make stacker cum reclaimer machine in coal handling plant of ktps-v and vi stages.

Read more
On-site resin grouting work for slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing

On-site resin grouting work for slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing

Read more
On-site laser measurement work on slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing

On-site laser measurement work on slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing

Read more
Ktps- v vi stages- o m-ii- providing brick supporting pedestals for extending 4 nos of ash disposal pipelines of ktps-v stage and 3 nos of ash disposal pipelines of ktps-vi stage at required locations all along the ab pond deep into the pond for uniform deposition of ash in the ab pond during the fy 2026-27

Ktps- v vi stages- o m-ii- providing brick supporting pedestals for extending 4 nos of ash disposal pipelines of ktps-v stage and 3 nos of ash disposal pipelines of ktps-vi stage at required locations all along the ab pond deep into the pond for uniform deposition of ash in the ab pond during the fy 2026-27

Read more
Bmd- removal and re-fixing of insulation including metal cladding on water wall tubes, pent house, steam connected valves and burner area and replacement of refractory at rh rear arch area, manual access doors and other locations of boiler at 1 x 500 mw ktpp unit for the year 2026-27 during capital overhaul works

Bmd- removal and re-fixing of insulation including metal cladding on water wall tubes, pent house, steam connected valves and burner area and replacement of refractory at rh rear arch area, manual access doors and other locations of boiler at 1 x 500 mw ktpp unit for the year 2026-27 during capital overhaul works

Read more
Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.

Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise