Tender Details
Particulars | Details |
---|---|
Title |
Manufacturing, Supply And Stacking Of Machine Crushed Track Ballast Conforming To Rdso Specification (Irs Ge 1) With Latest Correction Slips Issued Up To Date Of Inviting Of Tender At Railway Depot Or Nominated Location Under Aden/Bndm As Per The Direction Of Engineer In Charge Under The Jurisdiction Of Sr.Den/Central/Ckp.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 78124890 |
Reference Number |
CKP-CENTRAL-24-25-36 |
Tender Fee | 0 |
EMD | 3.1 Lakh |
Tender Value | |
Place | Kolkata |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/112024/78124890/viewNitPdf_4754398.pdf |
Start Date | November 01, 2024 22:13 |
End Date |
26/11/2024 ( Expired 186 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply and stacking of 60000 cum 50mm size machine crushed track ballast confirming rdso s specifications for track ballast, is/rdso-ge/0001:2023, february 2023 including latest correction slips, for bg railway track for nabinagar road siding and loading the same into bobyn/open wagon.
For complete deion and other details, please refer to tender
Read moreSupplying and loading of machine crushed stone ballast into railway wagons confirming to rdso s specification irs-ge-1 (june-2016) with up to date correction slips for track ballast from private quarry to tahsil fatehpur station (burhwal-sitapur section) dump.
For complete deion and other details, please refer to tender
Read moreManufacturing and supply of 65 mm size machine crushed stone ballast from private quarries conforming to rdso s specification of june 2016 with upto date correction slips at madhosingh ballast dump of n.e. railway.( approx quantity - 45000.00 cum).
For complete deion and other details, please refer to tender
Read moreManufacturing, supplying and stacking of machine crushed track ballast from dala/billi/jhansi sources as per rdso s specification of june/2016 with up to date correction slips in khalilabad (incl.)-bansi (incl.) section in connection with khalilabad- bahraich new line projects of lucknow division of n. e. railway
For complete deion and other details, please refer to tender
Read moreManufacturing, supply and stacking of machine crushed track ballast at hirisave (hise) depot (quantity - 1,43,000 cum) including loading in connection with the work of chickbanawar - hassan : through ballast recoupment for a length of 110km from km 14/000-124/000 (sl). (2 packet tender)
For complete deion and other details, please refer to tender
Read moreManufacturing, supply and stacking of machine crushed track ballast conforming to rdso specification (irs-ge-1) with latest correction slips issued up to date of inviting of tender at all yard/bridge approaches/nominated places for section of aden/ii/tata as per direction of engineer in charge under the jurisdiction of sr.den/east/ckp.
For complete deion and other details, please refer to tender
Read morePiplod depot:-manufacturing, supply and stacking of 50 mm size machine crushed track ballast at depot and loading the same into hopper. (1,52,687 cum).
For complete deion and other details, please refer to tender
Read moreManufacturing, supply and stacking of machine crushed track ballast conforming to rdso specification (irs-ge-1) with latest correction slips issued up to date of inviting of tender at all yards from rksn w/o to bndm a cabin under the jurisdiction of sr.den/central/ckp.
For complete deion and other details, please refer to tender
Read moreEarthwork in formation for railway bg embankment, blanketing work as per rdso specification in revised alignment (ch. 13.6 km to 15.0 km, ch.-15.5 km to 17.8 km and 24.5 km to 27.9 km), superstructure of bridge no.-06 (owg-1x30.5m), construction of rcc retaining wall and drain, protection work, 3 nos of gate goomty, 4 nos of loc huts, 2 nos of oc huts, 3 nos of auto huts manufacturing, supplying & stacking of 50 mm size of machine crushed track ballast of approved quality conforming to l
For complete deion and other details, please refer to tender
Read moreSupply and stacking of 40,000 cum machine crushed track ballast as per railway s specification at kantabanji depot from outside railway land/quarry and loading into railway s wagons under the jurisdiction of aden/kantabanji of sambalpur division(period of completion: 12 months excluding monsoon period).
For complete deion and other details, please refer to tender
Read moreof your Industry type