Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of Bishnupur Elis With Underground Distribution Network In Hajo Lac Under Sopd For The Year 2023 24 (Innovation/Consultation And Pilot Project)
|
Description |
Construction Of Bishnupur Elis With Underground Distribution Network In Hajo Lac Under Sopd For The Year 2023 24 (Innovation/Consultation And Pilot Project)
|
Organisation | Government of Assam |
Tender Id | 2024_ID_35138_1 |
Reference Number |
HJDI(T)/118/2022/15 dt. 30/12/2023 |
Tender Fee | 2000 |
EMD | 1.39 Lakh |
Tender Value | |
Place | O/O EXECUTIVE ENGINEER, HAJO-JALUKBARI DIV. (IRRIG |
Link | https://assamtenders.gov.in |
Start Date | January 03, 2024 22:30 |
End Date |
24/01/2024 ( Expired 514 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConstruction of foot over bridge (fob) near holy shrine, bambolim at km 524.330 on nh-66 in the state of goa on epc mode under road safety annual plan 2023-24.
Construction of foot over bridge (fob) near holy shrine, bambolim at km 524.330 on nh-66 in the state of goa on epc mode under road safety annual plan 2023-24.
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreConstruction of proposed 18 tpd municipal wet and dry waste processing plant, leachate tank with rain water harvesting unit...other ancillary works for proposed 18 tpd municipal waste processing plant under swm project within baruipur municipality.
Construction of proposed 18 tpd municipal wet and dry waste processing plant, leachate tank with rain water harvesting unit...other ancillary works for proposed 18 tpd municipal waste processing plant under swm project within baruipur municipality.
Read moreProcurement of 190t dumpers along with consumable spares and consumables for warranty period of one year and spares and consumables for post warranty period of 11 years for 190t dumpers under spares cost cap.
Procurement of 190t dumpers along with consumable spares and consumables for warranty period of one year and spares and consumables for post warranty period of 11 years for 190t dumpers under spares cost cap.
Read moreImplementation of 500mw with a 50 persantage greenshoe option, for grid connected roof top solar pv systems under resco model at various locations in the state of maharashtra, goa, gujarat, uttar pradesh and andhra pradesh
Implementation of 500mw with a 50 persanatge greenshoe option, for grid connected roof top solar pv systems under resco model at various locations in the state of maharashtra, goa, gujarat, uttar pradesh and andhra pradesh
Read moreConstruction of various transmission elements (02 no. 400 kv and 02 no. 220 kv transmission lines) for proposed 400 kv gss amber (jaipur north) with installation of opgw network on existing line including survey, supply under bn-9018002511
Construction of various transmission elements (02 no. 400 kv and 02 no. 220 kv transmission lines) for proposed 400 kv gss amber (jaipuir north) with installation of opgw network on existing line including survey, supply under bn-9018002511(turnkey)
Read moreWidening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Read moreSpecial repair of various link roads falling in m c jalandhar city in district jalandhar under special repair programme 2022-23 2023-24 and 2024-25 (group 11)
Special repair of various link roads falling in m c jalandhar city in district jalandhar under special repair programme 2022-23 2023-24 and 2024-25 (group 11)
Read moreRepair / maint of 11 kv network, distribution and power transformers incl dehydration/filtration of oil and other connected allied works in sector a and b army area jodhpur under ge (army) no. 01
Repair / maint of 11 kv network, distribution and power transformers incl dehydration/filtration of oil and other connected allied works in sector a and b army area jodhpur under ge (army) no. 01
Read moreof your Industry type