Tender Details

Particulars Details
Title
Construction Of 6 Lane Underpasses (5 Nos) And Allied Works On Existing 4 Lane Hyderabad To Bangalore Section Of Nh 44 From Km 35.165 To Km 74.965 In The State Of Telangana On Epc Mode, As Part Of Long Term Rectification Of Mo Rth Identified Black Spo
Description
Construction Of 6 Lane Underpasses (5 Nos) And Allied Works On Existing 4 Lane Hyderabad To Bangalore Section Of Nh 44 From Km 35.165 To Km 74.965 In The State Of Telangana On Epc Mode, As Part Of Long Term Rectification Of Mo Rth Identified Black Spo
Organisation National Highways Authority of India | Public Sector Undertakings
Tender Id 2025_NHAI_222524_1
Reference
Number
NHAI/RO-HYD/BS2017-19/NH 44/HYD- BGL/2025/01
Tender Fee 20000
EMD 1.58 Crore
Tender Value
Place Hyderabad to Bangalore Section of NH-44
Link
View Original Tender Notice

https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=247938

Start Date January 03, 2025 14:30
End Date
Expired 04/02/2025

Expired 511 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Rectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor

Rectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor

Read more
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode

Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode

Read more
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode

Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode

Read more
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Read more
Construction of 6 lane underpasses (4 nos) and allied works on existing 4 lane hyderabad-bangalore section of nh 44 from km 89 to km 124 in the state of telangana on epc mode, as part of long term rectification of morth identified black spots.

Construction of 6 lane underpasses (4 nos) and allied works on existing 4 lane hyderabad-bangalore section of nh 44 from km 89 to km 124 in the state of telangana on epc mode, as part of long term rectification of morth identified black spots.

Read more
Construction of 6 lane underpasses (4 nos) and allied works on existing 4 lane hyderabad-bangalore section of nh-44 from km 125 to 158 in the state of telangana on epc mode, as part of long-term rectification of morth identified black spots.

Construction of 6 lane underpasses (4 nos) and allied works on existing 4 lane hyderabad-bangalore section of nh-44 from km 125 to 158 in the state of telangana on epc mode, as part of long-term rectification of morth identified black spots.

Read more
Long term rectification of morth identified blackspots 17 and removal of 2 at-grade junctions and allied works on existing 4-6-lane hyderabad-vijayawada section of nh-65 from km.40.000-km.221.500 in telangana on epc mode

Long term rectification of morth identified blackspots 17 and removal of 2 at-grade junctions and allied works on existing 4-6-lane hyderabad-vijayawada section of nh-65 from km.40.000-km.221.500 in telangana on epc mode

Read more
Upc n/02010/03003/ts construction of 6lane underpasses (3 nos) and allied works on existing 4lane hyderabad to bangalore section of nh44 from km 162.915 to km 188.540 in the state of telangana on epc mode, as part of long-term rectification of morth

Upc n/02010/03003/ts construction of 6lane underpasses (3 nos) and allied works on existing 4lane hyderabad to bangalore section of nh44 from km 162.915 to km 188.540 in the state of telangana on epc mode, as part of long-term rectification of morth

Read more
Ae for long term rectification of morth identified blackspots 17 and removal of 2 atgrade junctions and allied works on existing 4/6 lane hyderabad vijayawada section of nh65 from km.40.000 to km.221.500 in telangana on epc mode

Ae for long term rectification of morth identified blackspots 17 and removal of 2 atgrade junctions and allied works on existing 4/6 lane hyderabad vijayawada section of nh65 from km.40.000 to km.221.500 in telangana on epc mode

Read more
Cs of ae services for long term rectification of morth identified blackspots (17 nos) removal of 2 at-grade junctions and allied works on existing 4/6-lane hyderabad-vijayawada section of nh-65 from km.40.000 to km.221.500 in telangana on epc mode.

Cs of ae services for long term rectification of morth identified blackspots (17 nos) removal of 2 at-grade junctions and allied works on existing 4/6-lane hyderabad-vijayawada section of nh-65 from km.40.000 to km.221.500 in telangana on epc mode.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise