Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Custom Bid For Services Machining Of Jobs Which Involves Turning Drilling Milling Including Debu
|
| Description |
|
| Organisation | Department of Heavy Industry | Ministry of Heavy Industries and Public Enterprises |
| Tender Id | GEM/2023/B/3983658 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://gem.gov.in/ |
| Start Date | September 21, 2023 15:33 |
| End Date |
Expired
02/10/2023
Expired 1105 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Technical Evaluation Results
| S.No. | Seller Name | Participated On | EMD Status | Status |
|---|---|---|---|---|
| 1 | gaurav enterprises | 30-09-2023 20:37:53 | Registered with designated Agency / Authority | Qualified |
| 2 | GENERAL SOLUTION | 02-10-2023 09:23:10 | Registered with designated Agency / Authority | Qualified |
| 3 | vinod yadav contractor | 22-09-2023 15:15:09 | Registered with designated Agency / Authority | Qualified |
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreProviding of 2nd run ug cable for the existing 33kv industrial area feeder from 132/33kv fever hospital eht sub station to 33/11kv industrial area ss which involves laying of 1.87km of 33kv 3x400sq.mm xlpe ug cable (single run) in lines division of hyderabad south and the work executed by the master plan sd-ii of division-ii in master plan hyderabad circle under t and d improvements to original works (reserved for waddera/sagara category).
Providing of 2nd run ug cable for the existing 33kv industrial area feeder from 132/33kv fever hospital eht sub station to 33/11kv industrial area ss which involves laying of 1.87km of 33kv 3x400sq.mm xlpe ug cable (single run) in lines division of hyderabad south and the work executed by the master plan sd-ii of division-ii in master plan hyderabad circle under t and d improvements to original works (reserved for waddera/sagara category).
Read moreDrilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.
Read moreBifurcation of 11 kv medibavi feeder (185111340102) emanating from 33/11 kv seethaphalmandi ss by erection of new 11kv feeder from 33/11kv ou ss which involves laying of 1.94 km 11kv3x300sq.mm xlpe ug cable (single run) up to the master minds school warasiguda through under pass railway bridge near ou cycling stadium via ou ss h adikmet main road, bouda nagar rd, warasiguda rd no 1 along with erection of 1no. 11 kv feeder vcb at 33/11kv ou ss in seethaphalmandi section of padmarao nagar sub-divi
Bifurcation of 11 kv medibavi feeder (185111340102) emanating from 33/11 kv seethaphalmandi ss by erection of new 11kv feeder from 33/11kv ou ss which involves laying of 1.94 km 11kv3x300sq.mm xlpe ug cable (single run) up to the master minds school warasiguda through under pass railway bridge near ou cycling stadium via ou ss h adikmet main road, bouda nagar rd, warasiguda rd no 1 along with erection of 1no. 11 kv feeder vcb at 33/11kv ou ss in seethaphalmandi section of padmarao nagar sub-division in paradise division of secunderabad circle and the work executed by construction division of secunderabad circle under t and d improvements to original works reserved under sc category
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.
Read moreCustom bid for services - various machining operation like boring drilling milling cnc turning debu
Read more
Custom bid for services - various machining operation like boring drilling milling cnc turning debu
Read more
of your Industry type