Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Shifting And Dismantling Of Electrical Utilities Due To Road Widening Work From Tower Square To Sant Tukaram Square And Erection Of New Infrastructure.
|
| Description |
Estimate For Shifting And Dismantling Of Electrical Utilities Due To Road Widening Work From Tower Square To Sant Tukaram Square And Erection Of New Infrastructure Thereof As Per Request Of The Chief Officer Nagar Parishad Telhara Under Telhara Urban
|
| Organisation | Directorate Of Municipal Administration | State Govt. and UT |
| Tender Id | 2024_DMA_1103044_1 |
|
Reference Number |
E tender 6/2024-25 |
| Tender Fee | 2000 |
| EMD | 11700 |
| Tender Value | - |
| Place | Telhara |
| Link |
View Original Tender Notice
https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1926751 |
| Start Date | October 04, 2024 14:30 |
| End Date |
Expired
10/10/2024
Expired 737 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Shifting of phe utilities due to construction of span box culvert on vehil ramnagri road
Shifting of phe utilities due to construction of 3m -4m span box culvert on vehil ramnagri road under deposit contribution
Read moreDismantling, shifting and erection of 20 nos high mast lighting tower
Dismantling, shifting and erection of 20 nos high mast lighting tower (20/30 mtrs height) in different location as per requirement of mines under kusmunda open cast project
Read moreFor the shifting work of existing 11 kv lt line and transformer due to widening of road from dangipar to bhagalpur via jungle ayodya prasad distt gorakhpur
For the shifting work of existing 11 kv lt line and transformer due to widening of road from dangipar to bhagalpur via jungle ayodya prasad distt gorakhpur
Read moreShifting/diversion and modification of electrical utilities and transmission line(s) of 11kv and above infringing the alignment,comprising dismantling of existing towers/poles,conductors and allied electrical installations,supply, erection,stringing,
(continue ) testing and commissioning of new towers/poles with allied foundation and other allied works etc. schedule-a- b/w aligarh jn.stn and harduaganj stn.schedule-b- shifting of ncr transmission line between aligarh jn.stn and daud khan stn
Read moreFor the shifting work of existing 33 kv 11 kv lt line and transformer due to widening of shivpur to belwar via dari jungle and kewatliya tola distt gorakhpur
For the shifting work of existing 33 kv 11 kv lt line and transformer due to widening of shivpur to belwar via dari jungle and kewatliya tola distt gorakhpur
Read moreShifting/dismantling of lt/ht lines which are creating hurdles during road widening from starting point of cbi phatak rob to 7 no. bus stand, mahal road, zone-9, jda, jaipur.
Shifting/dismantling of lt/ht lines which are creating hurdles during road widening from starting point of cbi phatak rob to 7 no. bus stand, mahal road, zone-9, jda, jaipur.
Read moreShifting of raw water rising mains from badi talab to pichhola due to widening of road between rampura circle and ubeshvar ji tiraha under uwss udaipur including twelve months defect liability period on single point responsibility basis.
Shifting of raw water rising mains from badi talab to pichhola due to widening of road between rampura circle and ubeshvar ji tiraha under uwss udaipur including twelve months defect liability period on single point responsibility basis.
Read moreDismantling, re-erection, and construction of 132 kv dc lilo of rongkhon ampati due to diversion of the 132 kv dc lilo of rongkhon ampati at the 132/33 kv praharinagar substation (between tower locations 8 and 12) (line length 1.85 ckm)
Dismantling, re-erection, and construction of 132 kv dc lilo of rongkhon ampati due to diversion of the 132 kv dc lilo of rongkhon ampati at the 132/33 kv praharinagar substation (between tower locations 8 and 12) (line length 1.85 ckm)
Read moreShifting of 33kv/11kv/lt lines and 5x100kva distribution transformers due to obstructing the construction of road widening towards airport from collector camp office to aerodrome ground area in operation section adilabad town-3 of adilabad town sub-division in adilabad division of adilabad circle on partial turnkey basis
Shifting of 33kv/11kv/lt lines and 5x100kva distribution transformers due to obstructing the construction of road widening towards airport from collector camp office to aerodrome ground area in operation section adilabad town-3 of adilabad town sub-division in adilabad division of adilabad circle on partial turnkey basis
Read moreProposal for shifting of 11kv lt lines along with dtrs due to road widening work from the existing 4lane road to 6 lane road boundaries 66 feet from the centre line on either side of the road from bellampally chowrasta to srinivasa garden in mancherial town 2 section of mancherial sub division, mancherial division, mancherial circle, on partial turnkey basis
Proposal for shifting of 11kv lt lines along with dtrs due to road widening work from the existing 4lane road to 6 lane road boundaries 66 feet from the centre line on either side of the road from bellampally chowrasta to srinivasa garden in mancherial town 2 section of mancherial sub division, mancherial division, mancherial circle, on partial turnkey basis
Read moreof your Industry type