Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Repair And Restoration Of 3 Nos. Of Fountains Including Supply, Fixing, Testing And Commissioning Of All Required Materials In Premises Of Cmpdi Ri 5 Bilaspur.
|
Description |
Repair And Restoration Of 3 Nos. Of Fountains Including Supply, Fixing, Testing And Commissioning Of All Required Materials In Premises Of Cmpdi Ri 5 Bilaspur.
|
Organisation | Central Mine Planning and Design Institute Limited | Public Sector Undertakings |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 3200 |
Tender Value | |
Place | CMPDI COLONY, SEEPAT ROAD BILASPUR BEHIND SCIENCE |
Link |
AAAAAAAAAA Login to view |
Start Date | June 28, 2025 16:30 |
End Date |
11/07/2025 ( 12 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Read moreManufacturing testing supply erection and commissioning of 1 no 33 by 11 kv 5 mva 3 phase power transformer at shanan ph pspcl
Manufacturing testing supply erection and commissioning of 1 no 33 by 11 kv 5 mva 3 phase power transformer at shanan ph pspcl
Read moreDesign manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Read moreSpecial repair of various link roads under special repair program 2022-23, 2023-24 and 2024-25 including 5 year routine maintenance in mc patran district patiala group 3
Special repair of various link roads under special repair program 2022-23, 2023-24 and 2024-25 including 5 year routine maintenance in mc patran district patiala group 3
Read moreSupply, installation, testing and commissioning of electrical, hvac, announcement system, elv system and other associate works on sub contract basis in connection with re-development of ernakulam junction railway station at ernakulam, kerala
Supply, installation, testing and commissioning of electrical, hvac, announcement system, elv system and other associate works on sub contract basis in connection with re-development of ernakulam junction railway station at ernakulam, kerala
Read moreSupply installation testing commissioning of 33/11 kv 1x5 mva grid substation and 33 kv line extension work at mehra under pmay gwalior file no. 160/25x3/3
Supply installation testing commissioning of 33/11 kv 1x5 mva grid substation and 33 kv line extension work at mehra under pmay gwalior file no. 160/25x3/3
Read moreRfp for supply installing testing and commissioning of shree ram stambh pillar at 30 locations along dharam path in ayodhya
Rfp for supply installing testing and commissioning of shree ram stambh pillar at 30 locations along dharam path in ayodhya
Read moreDesign supply, installation testing and commissioning (dsitc) of capsule type elevator lift at class room block a in iimk campus including all allied
Design supply, installation testing and commissioning (dsitc) of capsule type elevator/lift at class room block a in iimk campus including all allied civil works for lift structure/well and associated electrical works
Read moreSupply installation testing and commissioning of 4 nos 100 te road weighbridges
Supply installation testing and commissioning of 4 nos 100 te road weighbridges including civil and electrical works along with 4 years of camc after 1 year of warranty/guarantee period at 4 locations of ecl.
Read moreConstruction of covered cable trence with laying and installation of 350 mtr long, 5 nos 11 kv 3-phase 3 core120 sq mm xlpe underground cable in a covered cable trence from newly constructed 33 11 kv durgachowmuhani ss under ed kamalpur
Construction of covered cable trence with laying and installation of 350 mtr long, 5 nos 11 kv 3-phase 3 core120 sq mm xlpe underground cable in a covered cable trence from newly constructed 33 11 kv durgachowmuhani ss under ed kamalpur
Read moreof your Industry type