Tender Details

Particulars Details
Title
Top Plate As Per Drawing
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 106439017
Reference
Number
LN245574A
Tender Fee 0
EMD 0
Tender Value -
Place Secunderabad
Link
View Original Tender Notice

https://www.ireps.gov.in/ireps/supply/pdfdocs/082024/106439017/viewNitPdf_4676477.pdf

Start Date August 10, 2024 18:24
End Date
Expired 20/08/2024

Expired 782 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Roof top rain water harvesting work for type-3 houses in chitrakoot district

Roof top rain water harvesting work for type-3 houses in chitrakoot district

Read more
Supply of ss plate gr-309s for reconditioning the coal nozzle tips

Supply of ss plate gr-309s for reconditioning the coal nozzle tips

Read more
Procurement of locking plate w/nut for scrape for use at jvroc-ii sathupally area.

Procurement of locking plate w/nut for scrape for use at jvroc-ii sathupally area.

Read more
Four no boring and construction oif mcu room and drain and its plate in the campous of mandal kara munger 2026-27

Four no boring and construction oif mcu room and drain and its plate in the campous of mandal kara munger 2026-27

Read more
On-site resin grouting work for slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing

On-site resin grouting work for slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing

Read more
On-site laser measurement work on slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing

On-site laser measurement work on slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing

Read more
Supply of seal plate for closing of openings/gaps on sides and bottom of 6a/b and 7 a/b conveyor gallery structure in chp area of btps, manuguru

Supply of seal plate for closing of openings/gaps on sides and bottom of 6a/b and 7 a/b conveyor gallery structure in chp area of btps, manuguru

Read more
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in

Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.

Read more
Tggenco - ytps - electrification of ash silo gate including supply and fixing of 150w and 60w high bay lights, 24v led lights for name plate ss letters at yadadri thermal power station at veerlapalem (v), damercherla (m), nalgonda (d)

Tggenco - ytps - electrification of ash silo gate including supply and fixing of 150w and 60w high bay lights, 24v led lights for name plate ss letters at yadadri thermal power station at veerlapalem (v), damercherla (m), nalgonda (d)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise