Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Irrigation Canal At Urgo (By Way Of Pcc Channel And Pitching Lining Various At Weak Portion Of Canal.(Under Sdp).
|
| Description |
Construction Of Irrigation Canal At Urgo (By Way Of Pcc Channel And Pitching Lining Various At Weak Portion Of Canal.(Under Sdp).
|
| Organisation | Union Territory of Ladakh |
| Tender Id | 2023_PWD_10001_5 |
|
Reference Number |
24 of I and FC Division Leh 2023-24 |
| Tender Fee | 1000 |
| EMD | 54000 |
| Tender Value | - |
| Place | Executive Engineer I and F C Division Leh |
| Link |
View Original Tender Notice
https://tenders.ladakh.gov.in |
| Start Date | August 25, 2023 21:30 |
| End Date |
Expired
01/09/2023
Expired 1142 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Restoration of damaged channel section mrc by way of pitching/grouting rd 4200m onwards.
Restoration of damaged channel section mrc by way of pitching/grouting rd 4200m onwards.
Read moreRestoration of damaged channel section of d-2b of mrc by way of pitching/grouting at rd 2600m
Restoration of damaged channel section of d-2b of mrc by way of pitching/grouting at rd 2600m
Read moreRestoration of lal nad khul by way of construction of cement concrete channel and lining with bed treatment near land of bashir pandit
Restoration of lal nad khul by way of construction of cement concrete channel and lining with bed treatment near land of bashir pandit
Read moreConstruction of pcc drain along madha koil branch channel at mandhakarai street including damaged portion at kombakkam in villianur constituency, puducherry (ii call)
Construction of pcc drain along madha koil branch channel at mandhakarai street including damaged portion at kombakkam in villianur constituency, puducherry (ii call)
Read moreRestoration of breached spot of supply channel of ck canal by way of construction of crate protection bund at satrajan (spot 1st)
Restoration of breached spot of supply channel of ck canal by way of construction of crate protection bund at satrajan (spot 1st)
Read moreRestoration of breached spot of supply channel of ck canal by way of construction of crate protection bund at satrajan (spot 2nd )
Restoration of breached spot of supply channel of ck canal by way of construction of crate protection bund at satrajan (spot 2nd )
Read moreSumbal canvas canal modernization by way of construction of lining walls, bed treatments, rcc channels and jacketing at spots from rd 0 to 1800 mtrs l 550m at spots and supply channel rd 0 to 428m l 220m
Sumbal canvas canal modernization by way of construction of lining walls, bed treatments, rcc channels and jacketing at spots from rd 0 to 1800 mtrs l 550m at spots and supply channel rd 0 to 428m l 220m
Read moreRestoration of left right side embankment by way of construction of lining wall and breast wall near rd 350 mts of main banimullah canal
Restoration of left right side embankment by way of construction of lining wall and breast wall near rd 350 mts of main banimullah canal
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreConstruction of irrigation canal at urgo (by way of pcc channel, pitching and lining at various weak portion of canal (under sdp)
Construction of irrigation canal at urgo (by way of pcc channel, pitching and lining at various weak portion of canal (under sdp)
Read moreof your Industry type