Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Irrigation Canal At Urgo (By Way Of Pcc Channel And Pitching Lining Various At Weak Portion Of Canal.(Under Sdp)
|
| Description |
Construction Of Irrigation Canal At Urgo (By Way Of Pcc Channel And Pitching Lining Various At Weak Portion Of Canal.(Under Sdp)
|
| Organisation | Union Territory of Ladakh |
| Tender Id | 2023_PWD_10001_4 |
|
Reference Number |
24 of I and FC Division Leh 2023-24 |
| Tender Fee | 1000 |
| EMD | 54000 |
| Tender Value | - |
| Place | Office of the Executive Engineer I and FC Div Leh |
| Link |
View Original Tender Notice
https://tenders.ladakh.gov.in |
| Start Date | July 13, 2023 15:30 |
| End Date |
Expired
23/08/2023
Expired 1147 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Restoration of damaged channel section mrc by way of pitching/grouting rd 4200m onwards.
Restoration of damaged channel section mrc by way of pitching/grouting rd 4200m onwards.
Read moreRestoration of damaged channel section of d-2b of mrc by way of pitching/grouting at rd 2600m
Restoration of damaged channel section of d-2b of mrc by way of pitching/grouting at rd 2600m
Read moreImprovement and cement concrete lining of pundalo branch canal from rd 0.000km to 8.000km (balance portion) under nkcsuy phase-iii
Earth work, c.c work / r.c.c work, moorum / sand / moorum and sand admixture work
Read moreChecking of leakages and restoration of sloughed embankments by way of construction of retaning/lining wall of wohan canal right at rd 11300m
Checking of leakages and restoration of sloughed embankments by way of construction of retaning/lining wall of wohan canal right at rd 11300m
Read moreConstruction of pcc drain along madha koil branch channel at mandhakarai street including damaged portion at kombakkam in villianur constituency, puducherry (ii call)
Construction of pcc drain along madha koil branch channel at mandhakarai street including damaged portion at kombakkam in villianur constituency, puducherry (ii call)
Read moreSumbal canvas canal modernization by way of construction of lining walls, bed treatments, rcc channels and jacketing at spots from rd 0 to 1800 mtrs l 550m at spots and supply channel rd 0 to 428m l 220m
Sumbal canvas canal modernization by way of construction of lining walls, bed treatments, rcc channels and jacketing at spots from rd 0 to 1800 mtrs l 550m at spots and supply channel rd 0 to 428m l 220m
Read moreImprovement/strengthening of d-8c of main tawi canal from rd 300-1000m by way of construction of pcc section and 03 nos culvert.
Improvement/strengthening of d-8c of main tawi canal from rd 300-1000m by way of construction of pcc section and 03 nos culvert.
Read moreExtension/improvement of distributaries channels by way of providing and fixing of chain link fencing in distributery channel no of d16 and d17 of igo phey canal (under capex)
Extension/improvement of distributaries channels by way of providing and fixing of chain link fencing in distributery channel no of d16 and d17 of igo phey canal (under capex)
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreConstruction of irrigation canal at urgo (by way of pcc channel, pitching and lining at various weak portion of canal (under sdp)
Construction of irrigation canal at urgo (by way of pcc channel, pitching and lining at various weak portion of canal (under sdp)
Read moreof your Industry type