Tender Details

Particulars Details
Title
Construction Of Irrigation Canal At Urgo (By Way Of Pcc Channel And Pitching Lining Various At Weak Portion Of Canal.(Under Sdp)
Description
Construction Of Irrigation Canal At Urgo (By Way Of Pcc Channel And Pitching Lining Various At Weak Portion Of Canal.(Under Sdp)
Organisation Union Territory of Ladakh
Tender Id 2023_PWD_10001_4
Reference
Number
24 of I and FC Division Leh 2023-24
Tender Fee 1000
EMD 54000
Tender Value -
Place Office of the Executive Engineer I and FC Div Leh
Link
View Original Tender Notice

https://tenders.ladakh.gov.in

Start Date July 13, 2023 15:30
End Date
Expired 23/08/2023

Expired 1147 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Restoration of damaged channel section mrc by way of pitching/grouting rd 4200m onwards.

Restoration of damaged channel section mrc by way of pitching/grouting rd 4200m onwards.

Read more
Restoration of damaged channel section of d-2b of mrc by way of pitching/grouting at rd 2600m

Restoration of damaged channel section of d-2b of mrc by way of pitching/grouting at rd 2600m

Read more
Checking of leakages and restoration of sloughed embankments by way of construction of retaning/lining wall of wohan canal right at rd 11300m

Checking of leakages and restoration of sloughed embankments by way of construction of retaning/lining wall of wohan canal right at rd 11300m

Read more
Construction of pcc drain along madha koil branch channel at mandhakarai street including damaged portion at kombakkam in villianur constituency, puducherry (ii call)

Construction of pcc drain along madha koil branch channel at mandhakarai street including damaged portion at kombakkam in villianur constituency, puducherry (ii call)

Read more
Sumbal canvas canal modernization by way of construction of lining walls, bed treatments, rcc channels and jacketing at spots from rd 0 to 1800 mtrs l 550m at spots and supply channel rd 0 to 428m l 220m

Sumbal canvas canal modernization by way of construction of lining walls, bed treatments, rcc channels and jacketing at spots from rd 0 to 1800 mtrs l 550m at spots and supply channel rd 0 to 428m l 220m

Read more
Improvement/strengthening of d-8c of main tawi canal from rd 300-1000m by way of construction of pcc section and 03 nos culvert.

Improvement/strengthening of d-8c of main tawi canal from rd 300-1000m by way of construction of pcc section and 03 nos culvert.

Read more
Extension/improvement of distributaries channels by way of providing and fixing of chain link fencing in distributery channel no of d16 and d17 of igo phey canal (under capex)

Extension/improvement of distributaries channels by way of providing and fixing of chain link fencing in distributery channel no of d16 and d17 of igo phey canal (under capex)

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Construction of irrigation canal at urgo (by way of pcc channel, pitching and lining at various weak portion of canal (under sdp)

Construction of irrigation canal at urgo (by way of pcc channel, pitching and lining at various weak portion of canal (under sdp)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise