Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Requirement Of Thordon Sxl Fully Finished Bearing For Various Vertical Pumps Installed For Unit 1 To 4 Ctpp Chhabra
|
Description |
Requirement Of Thordon Sxl Fully Finished Bearing For Various Vertical Pumps Installed For Unit 1 To 4 Ctpp Chhabra
|
Organisation | RRVUN - CMD | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | CTPP RVUNL Chhabra |
Link |
AAAAAAAAAA Login to view |
Start Date | June 21, 2025 19:30 |
End Date |
30/06/2025 ( 1 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Aoh kit ep contactor filter on/off. each consist of 7 items 8 nos. (1) cartridge body assly, aal part no. 2220007100/04 - 01 nos (2) rubber o ring valve housing, aal part no. 2220007100/06 - 02 nos (3) rubber o ring piston sm, aal part no. 2220007100/07 - 01 no (4) rubber o ring cylinder sm, aal part no. 2220007100/05 - 01 no. (5) rubber o ring air conn, aal part no. 2220007100/08 - 01 no. (6) seal piston sm, aal partno. 2220007100/09 - 01 no. (7) rubber cap, aal part no. 2220007100/10 - 0
For complete deion and other details, please refer to tender
Read moreDye penetrant kit consisting of red dye penetrant, remover/ cleaner & developer in the ratio 1:4:4 in a set. visibility-type-ii, washability-method-c, sensitivity-level-2, as per rdso s specification no. m&c/ndt/105/2001 of april 2001 or latest. (each can capacity 500ml and content 400ml net) drawing & specification : as per annexure a.
For complete deion and other details, please refer to tender
Read moreE-tender notice for printing and supplying the set of svarabitan (vol. 1 to 66) and sanchayita (board binding) on unit cost basis with paper
E-tender notice for printing and supplying the set of svarabitan (vol. 1 to 66) and
 sanchayita (board binding) on unit cost basis with paper
Read moreMs thordon make fully finished thordon sxl bearing to suit size od254mm x id 224mm x 250mm long fit
Read more
Biennial rate contract for electrical mtc activities of solar power system installed at various buildings roof tops at pps-1 for 02 years.
Biennial rate contract for electrical mtc activities of solar power system installed at various buildings roof tops at pps-1 for 02 years as per tender documents.
Read moreUpgradation of bathinda dabwali road nh 64 to refinery phullokhari rd 16 point 80 to 17 point 88 km with maintenance of road for 5 years in which 1 year defect liabillity period and 4 years maintenance period
Upgradation of bathinda dabwali road nh 64 to refinery phullokhari rd 16 point 80 to 17 point 88 km with maintenance of road for 5 years in which 1 year defect liabillity period and 4 years maintenance period
Read moreUpgradation of bathinda talwandi sabo road to nutt upto pmgsy road rd 0 point 00 to 6 point 80 km bodr 42 including maintenance of road for 5 year in 1 year defect liability period and 4 year maintenance period
Upgradation of bathinda talwandi sabo road to nutt upto pmgsy road rd 0 point 00 to 6 point 80 km bodr 42 including maintenance of road for 5 year in which 1 year defect liability period and 4 year maintenance period
Read moreProvn of earthing pit infrastructure at 4 brd, provn of dg set for p-1 bldg, provn of deficient acs against ber, provn of electric supply to arrestor barrier and other certain location at tech area at afs kanpur
Provn of earthing pit infrastructure at 4 brd, provn of dg set for p-1 bldg, provn of deficient acs against ber, provn of electric supply to arrestor barrier and other certain location at tech area at afs kanpur
Read moreSupply of thrust pad kit for 7 dodge bearing for pa fan. model no. ndv 22 tiefstack (one consist of 4 half) - 1 set
Supply of thrust pad kit for 7 dodge bearing for pa fan. model no. ndv 22 tiefstack (one consist of 4 half) - 1 set&#x0d
Read moreStrenthening and pr surfacing of kotbhai bhalaiana road mktodr-05 total length 0.00 to 7.70 kms proposed length 2.60 km to 3.31 km and 4.40 km t 5.00 km total proposed length 1.310 kms incl. maintenance of road for 05 years 1 yr dlp 4 yr mntnc
Strenthening and pr surfacing of kotbhai bhalaiana road mktodr-05 total length 0.00 to 7.70 kms proposed length 2.60 km to 3.31 km and 4.40 km t 5.00 km total proposed length 1.310 kms incl. maintenance of road for 05 years 1 yr dlp 4 yr mntnc
Read moreof your Industry type