Particulars | Details |
---|---|
Title |
Pcm Roller Assemly Pedesta C I Fg Is 210,Pcm Roller Assembl Complet C I F Is 210,Pcm Roller Assembl
|
Description |
|
Organisation | NMDC STEEL Limited | Ministry of Steel |
Tender Id | GEM/2023/B/3890502 |
Reference Number |
|
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link | https://gem.gov.in/ |
Start Date | August 29, 2023 23:09 |
End Date |
08/09/2023 ( Expired 658 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
S.No. | Seller Name | Offered Item | Participated On | EMD Status | MSE/MII Status | Status |
---|---|---|---|---|---|---|
1 | ABHA POWER AND STEEL PRIVATE LIMITED | - | 02-09-2023 15:41:29 | Registered with designated Agency / Authority | MSE | Evaluated |
2 | EXCELLORS ENGINEERING SOLUTIONS PRIVATE LIMITED | - | 07-09-2023 12:05:06 | Registered with designated Agency / Authority | MSE | Evaluated |
3 | HI-TECH ENGINEERING WORKS | - | 07-09-2023 12:52:48 | Registered with designated Agency / Authority | MSE | Evaluated |
4 | KAILASTEJ ENGINEERS | - | 08-09-2023 16:29:44 | MSE | MSE | Evaluated |
5 | M G STEEL | - | 07-09-2023 17:46:08 | Registered with designated Agency / Authority | MSE | Evaluated |
6 | NUPRO ENGINEERING SYNDICATE PVT LTD | - | 07-09-2023 21:59:23 | Registered with designated Agency / Authority | MSE | Evaluated |
7 | RAVI ENGINEERING WORKS | - | 05-09-2023 19:22:34 | Registered with designated Agency / Authority | MSE | Evaluated |
8 | THE PROGRESSIVE ENTERPRISE (INDIA) | - | 07-09-2023 16:33:49 | MSE | MSE | Evaluated |
9 | VMS NIRMAN PRIVATE LIMITED | - | 08-09-2023 10:54:47 | Offline upload | N/A | Evaluated |
Contract Details
- Contract Status:
- Fullfillment in Progress Order Accepted
- Seller:
- THE PROGRESSIVE ENTERPRISE (INDIA)M G STEEL
- Buyer Designation:
- BUYER EXE 5BUYER EXE 5
- Buying Mode:
- Bid/RABid/RA
- Contract Date:
- 2023-10-26 22:36:00 +0530
- Contract Amount:
Product | Brand | Model | Ordered Quantity | Price |
---|---|---|---|---|
PCM ROLLER ASSEMBL SLEEV 1 IS 206 | NA | BOQ Item | 100 | ₹ 5100.000 |
PCM ROLLER ASSEMBL COMPLET C I F IS 210 | NA | BOQ Item | 646 | ₹ 1493552.000 |
Product | Brand | Model | Ordered Quantity | Price |
PCM ROLLER ASSEMBL SLEEV 2 IS 206 | NA | BOQ Item | 100 | ₹ 5500.000 |
PCM ROLLER ASSEMBL SHAFT R 45C8 IS 157 | NA | BOQ Item | 100 | ₹ 16500.000 |
PCM ROLLER ASSEMLY PEDESTA C I FG IS 210 | NA | BOQ Item | 646 | ₹ 1204790.000 |
I. p/f wall tiles & distempering / painting in the corridors of main building z. h. c. e. t. ii. wa
Read more
I p f wall tiles and distempering painting in the corridors of main building z h c e t ii water proofing treatment of roofs of classrooms teachers chambers corridors etc at main building z h c e t area 1500 sqm
I p f wall tiles and distempering painting in the corridors of main building z h c e t ii water proofing treatment of roofs of classrooms teachers chambers corridors etc at main building z h c e t area 1500 sqm
Read moreD e p o s i t - p v i p - c o n s t r u c t i o n o f s i d e protection wall between ch. 0/930 km 1/103 km of kalamboor md-general civil work
This estimate includes 1. clearing grass 2.&#x0d earthwork excavation, 3. pcc foundation cc&#x0d 1 4 8, 4. centering and shuttering 5. pcc side&#x0d wall cc 1 2 4, 6. dismantling dr.
Read moreRefurbishing of internal electrical installation with new copper wiring/ rewiring i/c wall fans point, computer points, ac points, mcbs, p/f energy saving led fittings, bldc ceiling fan etc. for pib office at 3rd floor of the old adg office ddk campus, golf green, kolkata
Refurbishing of internal electrical installation with new copper wiring/ rewiring i/c wall fans point, computer points, ac points, mcbs, p/f energy saving led fittings, bldc ceiling fan etc. for pib office at 3rd floor of the old adg office ddk campus, golf green, kolkata
Read moreConstruction of toilet in icds centre at a) tulsiberia board primary school, b) joargori anupam sangha i. c. d. s., c) barbangalpur saddar para icds, d) bamunhati patrapara icds, e) rajapur anganwari sishu siksha centre, f) brindabanpur nurullapara,
Construction of toilet in icds centre at a) tulsiberia board primary school, b) joargori anupam sangha i. c. d. s., c) barbangalpur saddar para icds, d) bamunhati patrapara icds, e) rajapur anganwari sishu siksha centre, f) brindabanpur nurullapara,
Read moreCarrying out patrolling routine breakdown maintenance of 220kv dumka rupnarayanpur d c transmission line under transmission sub division madanpur for the f y 2025 26 i e from 01 07 2025 to 31 03 2026 i e 09 months
Carrying out patrolling routine breakdown maintenance of 220kv dumka rupnarayanpur d c transmission line under transmission sub division madanpur for the f y 2025 26 i e from 01 07 2025 to 31 03 2026 i e 09 months
Read moreCarrying out patrolling routine breakdown shutdown maintenance of 132 kv d c madanpur dumka pakur transmission lines from loc 01 to 295 approx 84 5 km under transmission sub division pakur for f y 2025 26 i e 01 07 2025 to 31 03 2026
Carrying out patrolling routine breakdown shutdown maintenance of 132 kv d c madanpur dumka pakur transmission lines from loc 01 to 295 approx 84 5 km under transmission sub division pakur for f y 2025 26 i e 01 07 2025 to 31 03 2026
Read moreCarrying out patrolling routine breakdown maintenance of 220 kv d c dumka govindpur transmission line 50 85 km under transmission sub division madanpur for the f y 2025 26 i e from 01 07 2025 to 31 03 2026 i e 09 months
Carrying out patrolling routine breakdown maintenance of 220 kv d c dumka govindpur transmission line 50 85 km under transmission sub division madanpur for the f y 2025 26 i e from 01 07 2025 to 31 03 2026 i e 09 months
Read moreof your Industry type