Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Bypass Road To Rayagada Town And Jk Pur Town On Nh 326 In The State Of Odisha.
|
| Description |
Construction Of Bypass Road To Rayagada Town And Jk Pur Town On Nh 326 In The State Of Odisha. 
(Bid Ref No. 10 Ce Nh Of 2024 25)
|
| Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
| Tender Id | 2024_MoRTH_832345_1 |
|
Reference Number |
10 CE NH of 2024-25 |
| Tender Fee | 23600 |
| EMD | 1.53 Crore |
| Tender Value | |
| Place | RAYAGADA |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=874633 |
| Start Date | October 25, 2024 00:25 |
| End Date |
Expired
15/11/2025
Expired 231 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of new major hl bridge across river ong at km. 43.500 on nh-26 in the state of odisha on epc mode
Construction of new major hl bridge across river ong at km. 43.500 on nh-26 in the state of odisha on epc mode
Read moreConstruction of bypass from jaitpura to jaisinghpura at sikar road
Construction of bypass from jaitpura to jaisinghpura at sikar road
Read moreConstruction of drain work at barod town on state highway-70 (bot road) sh
Construction of drain work at barod town on state highway-70 (bot road) sh
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConstruction of ht covered conductor and ht abc for in connecting feeder through nh
Construction of ht covered conductor and ht abc for in connecting feeder through nh
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreRepair and rehabilitation of deopani bridge at km 5.824 construction of rcc covered drains and installation of ms railings on the meka roing section from km 0.00 to km 6.124 of nh-313
Repair and rehabilitation of deopani bridge at km 5.824 construction of rcc covered drains and installation of ms railings on the meka roing section from km 0.00 to km 6.124 of nh-313
Read moreStrengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram
Strengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreof your Industry type