Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Drain From Singh Ji House To Chatterjee House At Lower Benialsol Under Arrah Gp
|
Description |
Construction Of Drain From Singh Ji House To Chatterjee House At Lower Benialsol Under Arrah Gp
|
Organisation | DISTRICT MAGISTRATE PURULIA | State Govt. and UT |
Tender Id | 2024_DM_785590_1 |
Reference Number |
WB/PUR/RNP-I/EO/NIeT59/3rdCal |
Tender Fee | 1000 |
EMD | 4000 |
Tender Value | |
Place | Arrah |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1741361 |
Start Date | December 16, 2024 18:30 |
End Date |
20/12/2024 ( Expired 27 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Periodic renewal maintenance of national highway pathankot- mandi nh-154 section from km . 165.000 to km. 175.000 of chauntra (at km. 140.625) to padhar (at km. 180.000) of package- 4 in the state of himachal pradesh
Periodic renewal maintenance of national highway pathankot- mandi nh-154 section from km . 165.000 to km. 175.000 of chauntra (at km. 140.625) to padhar (at km. 180.000) of package- 4 in the state of himachal pradesh
Read moreIndependent engineer services for construction of strr (west side) nh948a kunigal (ramanagara taluk) to s. mudugadapalli (hosur taluk) from km 79 to km 144.25/144.00 (design chainage) phase-ii in karnataka on ham (project length 65.25 kms)
Independent engineer services for construction of strr (west side) nh948a kunigal (ramanagara taluk) to s. mudugadapalli (hosur taluk) from km 79 to km 144.25/144.00 (design chainage) phase-ii in karnataka on ham (project length 65.25 kms)
Read moreIndependent engineer services for construction of strr (west side) nh948a obalapura (nelamangala taluk)) to kunigal (ramanagara taluk) from km 0 to km 79 (design chainage) phase-i in karnataka on ham (project length 79 kms)
Independent engineer services for construction of strr (west side) nh948a obalapura (nelamangala taluk)) to kunigal (ramanagara taluk) from km 0 to km 79 (design chainage) phase-i in karnataka on ham (project length 79 kms)
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreBalance work of widening existing two lane to four lane including strengthening the existing carriageway from km 16/170 to km 18/110 and improvements from km 16/0 to km 16/170 of nh-207 (new nh-648) (length 2.11 km) under ap-2024-25 in the st
Balance work of widening existing two lane to four lane including strengthening the existing carriageway from km 16/170 to km 18/110 and improvements from km 16/0 to km 16/170 of nh-207 (new nh-648) (length 2.11 km) under ap-2024-25 in the st
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConst of 4 lane highway from dc km 0.000 to dc km 35.725 (ec km 1.705 to chainage km 34.446)on the sec of nh927 in uttar pradesh on ham mode under nh(o) scheme.
Const of 4 lane highway from dc km 0.000 to dc km 35.725 (ec km 1.705 to chainage km 34.446)on the sec of nh927 in uttar pradesh on ham mode under nh(o) scheme.
Read moreConst. of 4lane highway from dc km 0.000 to dc km 35.725 (ec km 1.705 to chainage km 34.446)on the section of nh927 in uttar pradesh on ham mode under nh(o) scheme.
Const. of 4lane highway from dc km 0.000 to dc km 35.725 (ec km 1.705 to chainage km 34.446)on the section of nh927 in uttar pradesh on ham mode under nh(o) scheme.
Read moreConstruction of new 4 lane with paved shoulder access controlled coastal highway from erasama to paradeep (km. 137.00 to km. 163.200) on hybrid annuity mode in the state of odisha (package iv)
Construction of new 4 lane with paved shoulder access controlled coastal highway from erasama to paradeep (km. 137.00 to km. 163.200) on hybrid annuity mode in the state of odisha (package iv)
Read moreConstruction of new 4 lane with paved shoulder access controlled coastal highway from kakatpur to erasama (km.89.400 to km. 137.00) on hybrid annuity mode in the state of odisha (package iii)
Construction of new 4 lane with paved shoulder access controlled coastal highway from kakatpur to erasama (km.89.400 to km. 137.00) on hybrid annuity mode in the state of odisha (package iii)
Read moreof your Industry type