Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Rfp For Balance Works Of Rampur Kathgodam Section Of Nh 87 From Km 42.791 (Design Chainage Km 43.446) To Km 88.00 (Design Chainage Km 93.226) (Package Ii) In The State Of Uttarakhand On Epc Mode.
|
| Description |
Rfp For Balance Works Of Rampur Kathgodam Section Of Nh 87 From Km 42.791 (Design Chainage Km 43.446) To Km 88.00 (Design Chainage Km 93.226) (Package Ii) In The State Of Uttarakhand On Epc Mode.
|
| Organisation | Central Public Procurement Portal 2 |
| Tender Id | 2022_NHAI_120831_1 |
|
Reference Number |
NHAI/Tech/UKD/BW/RK-II/2022 |
| Tender Fee | 30000 |
| EMD | 2.86 Crore |
| Tender Value | |
| Place | NHAI RO Dehradun |
| Link |
View Original Tender Notice
https://etenders.gov.in |
| Start Date | July 05, 2022 21:00 |
| End Date |
Expired
27/07/2023
Expired 1060 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of road protection measures from km.110-000 to km.176-000 (section between mokhada to jawhar) on nh-160a in the state of maharashtra. on epc mode.
Construction of road protection measures from km.110-000 to km.176-000 (section between mokhada to jawhar) on nh-160a in the state of maharashtra. on epc mode.
Read moreConstruction of new major hl bridge across river ong at km. 43.500 on nh-26 in the state of odisha on epc mode
Construction of new major hl bridge across river ong at km. 43.500 on nh-26 in the state of odisha on epc mode
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreTender for constr impvt of extng rd sktt cl 9 to nhdl specn fm extng km 40pt00 to km 70pt00 design chainage km 40pt00 to km 68pt40 net length 28pt40 km on epc mode under pjt dpk in hp
Tender for constr impvt of extng rd sktt cl 9 to nhdl specn fm extng km 40pt00 to km 70pt00 design chainage km 40pt00 to km 68pt40 net length 28pt40 km on epc mode under pjt dpk in hp
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreReconstruction and repair of major bridge on dhadhar river at km. 180/000 to 180/400 on nh-64 in bharuch district in the state of gujarat on epc mode
Reconstruction and repair of major bridge on dhadhar river at km.
 180/000 to 180/400 on nh-64 in bharuch district in the state of
 gujarat on epc mode
Read moreBeautification and improvement works at puducherry urban stretch from km.01.450 to km.03.520 in the project of puducherry tindivanam section of nh-32 (old nh-66)
Beautification and improvement works at puducherry urban stretch from km.01.450 to km.03.520 in the project of puducherry tindivanam section of nh-32 (old nh-66)
Read moreRectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Rectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreRestoration of landslide affected sections from km 12.800 to km 14.220 of nh-58e (kundal-jhadol section) in the state of rajasthan.
Restoration of landslide affected sections from km 12.800 to km 14.220 of nh-58e (kundal-jhadol section) in the state of rajasthan.
Read moreof your Industry type