Tender Details
Particulars | Details |
---|---|
Title |
Survey, Investigation, Design And Construction Of Piped Water Supply Scheme Under Jal Jeevan Mission At Village Pondi And Chondi (02 Villeges) Block Anuppur District Anuppur
|
Description |
As Per Nit
|
Organisation | Public Health Engineering- O/o Engineer In Chief | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 16534 |
EMD | 2.94 Lakh |
Tender Value | |
Place | ANUPPUR |
Link |
AAAAAAAAAA Login to view |
Start Date | May 03, 2025 18:30 |
End Date |
19/05/2025 ( 9 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
AAAAAAAAAA
Login to viewSupply and fitting fixing of main switch, pipe, fittings and other additional electro-mechanical work at ohr site of puncha water supply scheme under purulia mechanical division phe dte.
Read moreChambal alwar bharatpur water supply project package 2 based on hybrid annuity model ace(p) bharatpur nit no. 05 / 2024-25
Work of construction of intermediate cwph at kotra baseri laying of clear water transmission main from kotra to naroli nadbai via junction 2 at naroli ips nadbai nagar ramgarh kishangarhbas tijara jairoli and bhiwadi based on ham model under jjm
Read moreConstruction of common intake for jaipur, ajmer and tonk districts and laying of the raw water main pipeline under the bisalpur jaipur water supply project, stage-ii phase-ii
Construction of common intake for jaipur, ajmer and tonk districts and laying of the raw water main pipeline under the bisalpur jaipur water supply project, stage-ii phase-ii&#x0d name of subwork- construction of 1000 mld intake pump house for jaipur an
Read moreEpc contractor for design, engineering, procurement, supply, construction, commissioning on turnkey basis and comprehensive operation and maintenance for 10 (5 plus 5) years of 50 mw grid-connected solar photovoltaic power plants at ttps, lalpania
Epc contractor for design, engineering, procurement, supply, construction, commissioning on turnkey basis and comprehensive operation and maintenance for 10 (5 plus 5) years of 50 mw grid-connected solar photovoltaic power plants at ttps, lalpania
Read moreDrilling, installation and maintainance of 5 nos. of tube well (solar) at mouza-dudhe budhe and gobrageriya under keshiary block in the district of paschim medinipur under dpmu, paschim medinipur, wbadmi project ph-ii
Drilling, installation and maintainance of 5 nos. of tube well (solar) at mouza-dudhe budhe and gobrageriya under keshiary block in the district of paschim medinipur under dpmu, paschim medinipur, wbadmi project ph-ii
Read more06/4
Construction of approach road and other allied works at kultali glr under augmentation of laying distribution system to extend the benefit of 100 p household in zone-i at kultali block within mega surface water based supply scheme of falta-mathurapur
Read moreSurvey, investigation and execution for de-silting and associated works of existing storm water drainage pipeline in varanasi city, u.p. under deposit program (pkg-1)
Survey, investigation and execution for de-silting and associated works of existing storm water drainage pipeline in varanasi city, u.p. under deposit program (pkg-1)
Read moreProviding tap connections to consumers augmentation and rehabilitation of water supply system, installation of 02 nos new tubewells and repair of existing ohsr 2 lg at samana district patiala under amrut 2.0 scheme part1
Providing tap connections to consumers augmentation and rehabilitation of water supply system, installation of 02 nos new tubewells and repair of existing ohsr 2 lg at samana district patiala under amrut 2.0 scheme part1
Read moreChambal alwar bharatpur water supply project package-iii based on hybrid annuity model (ham) ace(p) bharatpur nit no. 06/2024-25
Work of construction of cwr and block cwph at various locations for clusters laying of transfer main from block ps to block cps rising main from block cps to block esrs, construction of esrs laying of cluster distribution mains cabp pck 3 under jjm
Read moreBalance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s
Balance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s
Read moreof your Industry type