Tender Details
Particulars | Details |
---|---|
Title |
The Work Of Replacement Of 300 Sq Mm Xlpe Underground Cable Of 11 Kv Nagoa Feeder Which Is Passing Through The Fields Inundated With Water And Found To Be Faulty
|
Description |
The Work Of Replacement Of 300 Sq Mm Xlpe Underground Cable Of 11 Kv Nagoa Feeder Which Is Passing Through The Fields Inundated With Water And Found To Be Faulty
|
Organisation | ELECTRICITY DEPARTMENT | State Govt. and UT |
Tender Id | 2025_ED_19671_1 |
Reference Number |
tender05(24-25)/Div XIV, Verna |
Tender Fee | 7500 |
EMD | 63628 |
Tender Value | |
Place | Sub Division III Verna |
Link | https://eprocure.goa.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=20104 |
Start Date | January 30, 2025 20:30 |
End Date |
13/02/2025 ( Expired 93 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Desljtc of 220kv d/c u/g 1200 sq. mm xlpe cable for upcoming 220 kv tss of northern railway (at tughlakabad) from 220 kv s/s btps and setc of 02 no. 220 kv feeders for nr with associated civil work at 220 kv s/s btps new delhi on turnkey basis.
Desljtc of 220kv d/c u/g 1200 sq. mm xlpe cable for upcoming 220 kv tss of northern railway (at tughlakabad) from 220 kv s/s btps and setc of 02 no. 220 kv feeders for nr with associated civil work at 220 kv s/s btps new delhi on turnkey basis.
Read moreParallel laying, testing and commissioning of new 3c x 300 sq mm. power cable of xlpe along with control cable.
Parallel laying, testing and commissioning of new 3c x 300 sq mm. power cable of xlpe along with control cable.
Read moreLaying of 3c x 185 sq mm. xlpe ug cable by microtunneling method with other allied works iro new 11 kv line from mothabari 33/11 kv substation to pataldanga under malda division wbsedcl.
Laying of 3c x 185 sq mm. xlpe ug cable by microtunneling method with other allied works iro new 11 kv line from mothabari 33/11 kv substation to pataldanga under malda division wbsedcl.
Read moreInstallation of 630 sq mm 132 kv sc xlpe underground copper cable (3 phase plus 1 spare) between 220 kv gss sitapura and 132 kv gss, sitapura (route length-approx-1.10 km) including detailed route survey, laying and installation of cable
Installation of 630 sq mm 132 kv sc xlpe underground copper cable (3 phase plus 1 spare) between 220 kv gss sitapura and 132 kv gss, sitapura (route length-approx-1.10 km) including detailed route survey, laying and installation of cable
Read moreSupplying and making straight through cable jointing kit and end termination (pole mounting) cable jointing kit of 70 sq.mm and 50 sq. mm, 11kv/3.3 kv grade cables at main substation of peocp under hzb. area.
Supplying and making straight through cable jointing kit and end termination (pole mounting) cable jointing kit of 70 sq.mm and 50 sq. mm, 11kv/3.3 kv grade cables at main substation of peocp under hzb. area.
Read moreSpecial repairs to to underground ht cable of various substations at ins eksila and replacement of 04 pole structure with rmu at sailors institute area under ge u-i visakhapatnam
Special repairs to underground ht cable of various substations at ins eksila and replacement of 04 pole structure with rmu at sailors institute area under ge u-i visakhapatnam
Read moreReplacement of old damaged lt ht poles and dismantling of old faulty underground lt ht cables of 1.1kv and 11kv along with jointing and relaying new cables including other miscellaneous works at n s nagar colony bocp within a period of 6 months
Replacement of old damaged lt ht poles and dismantling of old faulty underground lt ht cables of 1.1kv and 11kv along with jointing and relaying new cables including other miscellaneous works at n s nagar colony bocp within a period of 6 months
Read moreBifurcation of newtown, baburhat and mes 11kv feeders emanating from powerhouse 33/11 kv s/s which involves the creation of new 11kv feeder under cob div. by laying of a 1.54km, 11kv xlpe 3c x 300sqmm ug cable (micro tunneling with laying of hdpe
Bifurcation of newtown, baburhat and mes 11kv feeders emanating from powerhouse 33/11 kv s/s which involves the creation of new 11kv feeder under cob div. by laying of a 1.54km, 11kv xlpe 3c x 300sqmm ug cable (micro tunneling with laying of hdpe
Read moreVita (khanapur) (g.c) industrial area...vita industrial area . m and r to water supply scheme . replacement of 200 mm dia. m.s. rising main and providing 300 mm dia. connecting inlet pipe to filer bed to 1500 m3 sump along with sluice valve at palus
Vita (khanapur) (g.c) industrial area...vita industrial area . m and r to water supply scheme . replacement of 200 mm dia. m.s. rising main and providing 300 mm dia. connecting inlet pipe to filer bed to 1500 m3 sump along with sluice valve at palus
Read moreReplacement of damaged barbed wire fencing with chain link mesh around civil distribution office including rest hall and cc pathway at rkp, mm area.(invited earmarked work contractors belongs to sc community only are eligible)
Replacement of damaged barbed wire fencing with chain link mesh around civil distribution office including rest hall and cc pathway at rkp, mm area.(invited earmarked work contractors belongs to sc community only are eligible)
Read moreof your Industry type