Tender Details
Particulars | Details |
---|---|
Title |
Psg Employees Co Operative Housing Society In Uppilipalayam Village Of Coimbatore
|
Description |
Construction Of Shop Cum Commercial Complex Building For Psg Employees Co Operative Housing Society In Uppilipalayam Village Of Coimbatore South Taluk In Coimbatore District.
|
Organisation | PWD | State Govt. and UT |
Tender Id | 2025_PWD_525973_1 |
Reference Number |
38BCMCBE10022025(1) |
Tender Fee | 0 |
EMD | 1.9 Lakh |
Tender Value | |
Place | UPPILIPALAYAM |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=626261 |
Start Date | February 19, 2025 20:30 |
End Date |
05/03/2025 ( Expired 99 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreRepair and maintenance of primary health care centre at mimi village of kiphire district in nagalan
Repair and maintenance of primary health care centre at mimi village of kiphire district in nagalan
Read moreConstruction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Read moreIndependent engineering services for construction of four laning of areraj-bettiah starting from areraj (0.500) near sh-54 and terminating near village gurwalia biswas (41.080) at nh-727 of nh-139w in the state of bihar on ham mode
Independent engineering services for construction of four laning of areraj-bettiah starting from areraj (0.500) near sh-54 and terminating near village gurwalia biswas (41.080) at nh-727 of nh-139w in the state of bihar on ham mode
Read moreConstruction of four laning of areraj-bettiah starting from areraj (0.500) near sh-54 and terminating near village gurwalia biswas (41.080) at nh-727 of nh-139w in the state of bihar on ham mode
Construction of four laning of areraj-bettiah starting from areraj (0.500) near sh-54 and terminating near village gurwalia biswas (41.080) at nh-727 of nh-139w in the state of bihar on ham mode
Read moreAppointment of firms agencies for yarn transporting contract to various depots all over india from the site of alleppey co operative spinning mills ltd
Tenders are invited by e tender mode for awarding contract to transport yarn to various destinations all over india from the site of alleppey co operative spinning mills ltd kareelakulangara p o kayamkulam under ministry of industries and commerc
Read moreRestoration of dev sagar talab in village devmali tehsil masuda beawar district beawar
Restoration of dev sagar talab in village devmali tehsil masuda beawar district beawar
Read moreConstruction of chief ministers mini stadium at kadampuliyur village in panruti assembly constituency cuddalore district
Construction of chief ministers mini stadium at kadampuliyur village in panruti assembly constituency cuddalore district
Read moreConstruction of cement concrete major village roads connecting mdr, odr, sh and nh in dudhani and kauncha panchayat in khanvel south section at dadra and nagar haveli dnh phase-2
Construction of cement concrete major village roads connecting mdr, odr, sh and nh in dudhani and kauncha panchayat in khanvel south section at dadra and nagar haveli dnh phase-2
Read moreConstruction of two lane with paved shoulder from design km 45.325 (ex km 48.870) near basinda village to design km 90.010 (ex km 97.903) near roshni village section of nh-347b of betul-khandwa package-2 in the state of madhya on ham
Construction of two lane with paved shoulder from design km 45.325 (ex km 48.870) near basinda village to design km 90.010 (ex km 97.903) near roshni village section of nh-347b of betul-khandwa package-2 in the state of madhya on ham
Read moreof your Industry type