Tender Details

Particulars Details
Title
Construction Of Boundry Wall Of Dhakava Canal Kothi At Km 118.200 Kheri Branch Canal
Description
Construction Of Boundry Wall Of Dhakava Canal Kothi At Km 118.200 Kheri Branch Canal
Organisation Government of Uttar Pradesh
Tender Id 2023_UPIDC_804950_2
Reference
Number
01/EE/2023-24 Dt. 15.05.2023
Tender Fee 854
EMD 37000
Tender Value
Place OFFICE OF THE EX. ENG. ID 1ST LAKHIMPUR KHERI
Link
View Original Tender Notice

https://etender.up.nic.in

Start Date May 24, 2023 00:00
End Date
Expired 22/06/2023

Expired 1125 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Read more
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp

Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp

Read more
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).

Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).

Read more
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Read more
Construction of drainage at mgr nagar in narasingarayanpettai

Construction of drainage at mgr nagar in narasingarayanpettai

Read more
Detailed design construction testing and commissioning of light house museum at national maritime heritage complex at lothal gujarat through epc mode

Detailed design construction testing and commissioning of light house museum at national maritime heritage complex at lothal gujarat through epc mode

Read more
Construction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.

Construction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.

Read more
Construction of boundry wall of tar kothi at km-67.500 kheri branch canal

Construction of boundry wall of tar kothi at km-67.500 kheri branch canal

Read more
Construction of boundry wall of tikapur canal kothi at km-69.600 of kheri branch canal

Construction of boundry wall of tikapur canal kothi at km-69.600 of kheri branch canal

Read more
Construction of boundry wall of adampur canal kothi at km-100.400 of kheri branch canal

Construction of boundry wall of adampur canal kothi at km-100.400 of kheri branch canal

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise