Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
General Soil Investigation Work Brennen
|
| Description |
General Soil Investigation Work Brennen&Amp#X0d
Collage Soil Investigation Work For The&Amp#X0d
Construction Of Academic Block And Guest&Amp#X0d
House At Govt.Brennen Collage Dharmadam&Amp#X0d
Thalassery Investigation Work 1&Amp#X0d
|
| Organisation | PWD | State Govt. and UT |
| Tender Id | 2024_PWD_673797_1 |
|
Reference Number |
PWD/BLDG/TR/22467/2022_3_1_1/1 |
| Tender Fee | 555 |
| EMD | 5565 |
| Tender Value | - |
| Place | Dharmadam |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1048026 |
| Start Date | May 29, 2024 18:30 |
| End Date |
Expired
04/06/2024
Expired 860 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Estimate for conducting geotechnical investigation including boreholes drilling, collection of soil and rock sample, field and laboratory testing for assessment of stability and seepage characteristics of earthen dam of sri komuram bheem project near ada (v), asifabad (m), komuram bheem asifabad (dist).
Estimate for conducting geotechnical investigation including boreholes drilling, collection of soil and rock sample, field and laboratory testing for assessment of stability and seepage characteristics of earthen dam of sri komuram bheem project near ada (v), asifabad (m), komuram bheem asifabad (dist).
Read moreConducting multiphase engineering investigation of internal condition assessment of masonry section of hidkal dam
Conducting multiphase engineering investigation of internal condition assessment of masonry section of hidkal dam
Read moreConducting multiphase engineering investigation of internal condition assessment of right bank earthen part of hidkal dam
Conducting multiphase engineering investigation of internal condition assessment of right bank earthen part of hidkal dam
Read moreConducting multiphase engineering investigation of internal condition assessment of left bank earthen part of hidkal dam.
Conducting multiphase engineering investigation of internal condition assessment of left bank earthen part of hidkal dam.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.
Read moreComprehensive operation and maintenance of 750 kld camus soil bio-technology (sbt) based sewage treatment plant (stp) at mgm hospital, in greater warangal municipal corporation
Comprehensive operation and maintenance of 750 kld camus soil bio-technology (sbt) based sewage treatment plant (stp) at mgm hospital, in greater warangal municipal corporation
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreConstruction of guest house /inspection bungalow (ib) (g+2) at 132/33 kv gss naugachia, bhagalpur including construction of road, boundary wall, soil filling in premises of ib, supply of furniture, electrical works including ac provisions and other miscellaneous works.
Construction of guest house /inspection bungalow (ib) (g+2) at 132/33 kv gss naugachia, bhagalpur including construction of road, boundary wall, soil filling in premises of ib, supply of furniture, electrical works including ac provisions and other miscellaneous works.
Read moreConstruction of rta unit office with driving track at husnabad in siddipet district. sub-work: consultancy services for preparation of (i) soil testing (ii) architectural designs and drawings (iii) structural designs and drawings (iv) mep drawings (v) periodical site visits (vi) submission of architectural as built drawings-2nd call
Construction of rta unit office with driving track at husnabad in siddipet district. sub-work: consultancy services for preparation of (i) soil testing (ii) architectural designs and drawings (iii) structural designs and drawings (iv) mep drawings (v) periodical site visits (vi) submission of architectural as built drawings-2nd call
Read moreof your Industry type