Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
400 Kv, Mva, A Sf6 Cb With Pir, Specification: As Per Annexure Specification,400 Kv, Mva, A Sf6 Cb Wi
|
| Description |
|
| Organisation | Contracts and Materials | Ministry of Power |
| Tender Id | GEM/2023/B/3240682 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://gem.gov.in/ |
| Start Date | March 27, 2023 00:29 |
| End Date |
Expired
30/06/2023
Expired 1204 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Supply of 66kv sf6 breaker as per bhel specification
Supply of 66kv sf6 breaker as per bhel specification
Read moreSf6 gas handling works during the 25 yearly maintenance of 400kv siemens gis at cps-1, khairi, chamba (h.p).
Sf6 gas handling works during the 25 yearly maintenance of 400kv siemens gis at cps-1, khairi, chamba (h.p).
Read morePyranometer compatible with nrg symphonie pro data logger -as per annexure enclosed.,pscm card for pyranometer - specification as per annexure enclosed.,nrg tipping bucket rain gauge - specification as per annexure enclosed.
Pyranometer compatible with nrg symphonie pro data logger -as per annexure enclosed.,pscm card for pyranometer - specification as per annexure enclosed.,nrg tipping bucket rain gauge - specification as per annexure enclosed.
Read moreGas soldering iron as per attached specification in annexure - i
Gas soldering iron as per attached specification in annexure - i
Read moreFuel sub-assembly dismantling machine as technical specification annexure attached
Fuel sub-assembly dismantling machine as technical specification annexure attached
Read moreItem 1 pxi express all hybrid chassis, adlink pxes-2596 as technical specification annexure attached,item 2 pxi express embedded controller, adlink pxie-3987-tl as technical specification annexure attached,item 3 - pxi multi-function daq card, adlink pxi-2206 as technical specification annexure attached,item 4 - 68-pin scsi-ii termination board as technical specification annexure attached,item 5 - 68-pin scsi to vhdci cable as technical specification annexure attached
Item 1 pxi express all hybrid chassis, adlink pxes-2596 as technical specification annexure attached,item 2 pxi express embedded controller, adlink pxie-3987-tl as technical specification annexure attached,item 3 - pxi multi-function daq card, adlink pxi-2206 as technical specification annexure attached,item 4 - 68-pin scsi-ii termination board as technical specification annexure attached,item 5 - 68-pin scsi to vhdci cable as technical specification annexure attached
Read moreFpau as per bom attached - technical specification as per annexure enclosed. ,installation and commissioning charges - as per technical specification enclosed.,multimode fiber optic cable suitable for fpau - technical specification as per annexure enclosed.,black superscreen cable suitable for fpau asper bom - technical specification as per annexure encl.
Fpau as per bom attached - technical specification as per annexure enclosed. ,installation and commissioning charges - as per technical specification enclosed.,multimode fiber optic cable suitable for fpau - technical specification as per annexure enclosed.,black superscreen cable suitable for fpau asper bom - technical specification as per annexure encl.
Read moreInflatable rubber seal for small door of reactor building 2 - specification as per annexure enclosed,inflatable rubber seal for big door of reactor building 2- specification as per annexure enclosed.,inflatable rubber seal for big door of reactor building 1 - specification as per annexure enclosed.,inflatable rubber seal for small door of reactor building 1- specification as per annexure enclosed.
Inflatable rubber seal for small door of reactor building 2 - specification as per annexure enclosed,inflatable rubber seal for big door of reactor building 2- specification as per annexure enclosed.,inflatable rubber seal for big door of reactor building 1 - specification as per annexure enclosed.,inflatable rubber seal for small door of reactor building 1- specification as per annexure enclosed.
Read moreHydro pneumatic boiler flushing pump as per attached specification in annexure-1
Hydro pneumatic boiler flushing pump as per attached specification in annexure-1
Read moreIndustrial heavy duty air circulating man coolers - specification as per annexure enclosed.
Industrial heavy duty air circulating man coolers - specification as per annexure enclosed.
Read moreof your Industry type